1 |
TERRACE ARMS |
Ma.Seenumaa,Kaaminee Magu, Male' |
Local |
FOUNDATION AND CONCRETE WORKS OF 1ST AND 2ND FLOOR (10 STOREY BUILDING) AT MA.ROALHI |
Private |
GC01 / OB |
Ma. Roalhi, Male' |
20-August-19 |
4 Month |
_ |
- |
2 |
HEAVY FORCE PRIVATE LIMITED |
2nd Floor, H.Fulidhooge,Kalaafaanu Higun, Male' |
Local |
DESIGN AND BUILD OF HARBOUR UPGRADE S.MARADHOO FEYDHOO |
Government |
HC01 |
S.Maradhoo Feydhoo |
15-July-19 |
420 days |
365 days |
- |
3 |
HEAVY FORCE PRIVATE LIMITED |
2nd Floor, H.Fulidhooge,Kalaafaanu Higun, Male' |
Local |
SUREVY, DEISGN AND CONSTRUCTION OF DH.RINBUDHOO HARBOUR |
Government |
HC01 |
Dh.Rinbidhoo |
15-July-19 |
366 days |
365 days |
- |
4 |
HEAVY FORCE PRIVATE LIMITED |
2nd Floor, H.Fulidhooge,Kalaafaanu Higun, Male' |
Local |
CONSTRCUTION OF TH.OMADHOO HARBOUR CONSTRUCTION |
Government |
HC01 |
Th.Omadhoo |
15-July-19 |
240 days |
365 days |
- |
5 |
HEAVY FORCE PRIVATE LIMITED |
2nd Floor, H.Fulidhooge,Kalaafaanu Higun, Male' |
Local |
CONSTRUCTION OF SERVICE JETTY AT MEERU ISLAND RESORT |
Private |
HC01 |
Meeru Island Resort |
1-July-19 |
6 months |
_ |
- |
6 |
HEAVY FORCE PRIVATE LIMITED |
2nd Floor, H.Fulidhooge,Kalaafaanu Higun, Male' |
Local |
REHABILITATION OF CARGO QUAY WALL AREA AT VIA |
Government |
HC01 |
K.Hulhule |
3-September-19 |
180 Days |
365 days |
- |
7 |
HEAVY FORCE PRIVATE LIMITED |
2nd Floor, H.Fulidhooge,Kalaafaanu Higun, Male' |
Local |
EXECUTE THE SUNSET BAR ISLAND WORKS AT MADIFUSHI RESORT AND SPA |
Resort |
HC01 |
Madifushi Resort and Spa |
25-July-19 |
60 months |
_ |
- |
8 |
HEAVY FORCE PRIVATE LIMITED |
2nd Floor, H.Fulidhooge,Kalaafaanu Higun, Male' |
Local |
MADIFUSHI HARBOUR JETTTY WORKS |
Private |
HC01 |
Madifushi Resort and Spa |
31-March-19 |
120 Days |
_ |
- |
9 |
ALIA CONSTRUCTION PVT LTD |
3rd Floor,M. Alia Building, Gandha koalhi Magu, Male |
Local |
CONSTRUCTION OF COZY BEACH VILLAS (8 BLOCKS) AND GARDEN VILLAS (2 BLOCKS) AT BANDOS ISLAND |
Resort |
GCO1 |
Bandos island Resort |
20-May-19 |
12 months |
12 months |
- |
10 |
ALIA CONSTRUCTION PVT LTD |
3th Floor,M. Alia Building, Gandha koalhi Magu, Male |
Local |
CONSTRUCTION OF 6 STOREY (&TERRACE) BUILDING AT LOT NO:10053, HULHUMALE |
Private |
GCO1 |
Hulhumale'10053 |
14-July-19 |
18 months |
12 months |
- |
11 |
ALIA CONSTRUCTION PVT LTD |
3th Floor,M. Alia Building, Gandha koalhi Magu, Male |
Local |
CONSTRUCTION OF A 10 STOREY RESIDENTIAL DEVELOPMENT AT G.NOORAAN |
Private |
GCO1 |
G.Nooran, Male' |
1-April-16 |
45 months 15 days |
12 months |
- |
12 |
ALIA CONSTRUCTION PVT LTD |
3th Floor,M. Alia Building, Gandha koalhi Magu, Male' |
Local |
|
Private |
GCO1 |
M.Alia Residence, Male' |
15-February-14 |
5 years |
_ |
- |
13 |
ALIA CONSTRUCTION PVT LTD |
3th Floor,M. Alia Building, Gandha koalhi Magu, Male |
Local |
CONSTRCUTIION OF 11 STOREY DEVELOPMENT AT H.MILLENNIA |
Private |
GCO1 |
H.Millennia, Male' |
1-March-16 |
45 months 23 days |
12 months |
- |
14 |
ALIA CONSTRUCTION PVT LTD |
3th Floor,M. Alia Building, Gandha koalhi Magu, Male |
Local |
CONSTRUCTION OF 13 STOREY BUILDING AT M.ALIA |
Private |
GCO1 |
Fares Island , Baa Atoll |
1-August-19 |
12 months |
2 years |
- |
15 |
A MAN MALDIVES PVT LTD |
Ground Floor,M.Noothari, Male' |
Local |
RELOCATING & ASSEMBLING OF KALHUVAKARU MOSQUE |
Government |
GC01/OB01-08 |
Dhaarul Aasaaru, Chaandhaneemagu, Male' |
20-August-19 |
120 days |
_ |
- |
16 |
FARB COMPANY PRIVATE LIMITED |
Bageechaage, S.Maradhoo Feydhoo |
Local |
CONSTRUCTION WORKS EXCLUDING CONCRETE WORKS OF 03 STOREY BUILDING AT OSTEN, S.MARADHOO FEYDHOO |
Private |
GC01/OB01-08 |
Osten, S.Maradhoo Feydhoo |
5-March-19 |
36 months |
_ |
- |
17 |
SANKEN OVERSEAS (PRIVATE) LIMITED |
8th Floor, Aagadhage Building, Boduthakurufaanu Magu, Male' |
Foreign |
PROPOSED OZO RESORT MALDIVES AT KUDAKURATHU ISLAND AT RAA ATOLL |
Resort |
GC01 |
Kudakurathu Island at Raa Atoll |
1-May-19 |
22 months |
365days |
- |
18 |
JAAH INVESTMENTS PRIVATE LIMITED |
2nd Floor, Unit202,H.Davinci, Sosun Magu, Male |
Local |
DEVELOPMENT OF MIXED USE RESIDENTIAL COMPLEXES IN HULHUMALE, |
Government |
GC01&02 |
Hulumale' Plot No:10905-D2-1(a) |
1-November-17 |
840 days |
_ |
- |
19 |
JAAH INVESTMENTS PRIVATE LIMITED |
3rd Floor, Unit202,H.Davinci, Sosun Magu, Male |
Local |
CONSTRUCTION OF 14 STORY BUILDING (PHASE 1) AT G.NOOMARAAGE AAGE, |
Private |
GC01&02 |
G.NOOMARAAGE AAGE, Male' |
7-March-19 |
24 months |
_ |
- |
20 |
JAAH INVESTMENTS PRIVATE LIMITED |
4th Floor, Unit202,H.Davinci, Sosun Magu, Male |
Local |
CONSTRUCTION OF 12 STORY BUILDING AT H.SOSUN |
Private |
GC01&02 |
H.SOSUN, Male' |
12-November-19 |
2 years |
_ |
- |
21 |
JAAH INVESTMENTS PRIVATE LIMITED |
5th Floor, Unit202,H.Davinci, Sosun Magu, Male |
Local |
CONSTRUCTION OF 06 STOREY BUILDING AT H.NIBOOGE |
Private |
GC01&02 |
H.Nibooge, Male' |
27-October-19 |
12 months |
6 months |
- |
22 |
T.E.P CONSTRUCTION PVT LTD |
H.Unikuri, Muithoshi Goalhi, Male' |
Local |
CONCRETE WORKS ON FLOOR 5,6,7,8,9 AND TERRACE AT H.RG TOWER |
Private |
GC01 |
H.RG Tower, Male |
7-October-19 |
09 months |
_ |
- |
23 |
ZHONGTIAN CONSTRUCTION GROUP CO. LTD |
2b,H.Finiunimaage,Sosun Magu,Male' |
Local |
PROPOSED NASANDHURA HOTEL AND APARTMENT COMPLEX |
Private |
GC01 |
Nasandhura Project Site Office, Male' |
31-March-16 |
55 months |
425 days |
- |
24 |
STATIC COMPANY PRIVATE LIMITED |
M.Huraa Fareedheemagu, Male |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY AND SEWERAGE FACILITIES IN N.KENDHIKULHUDHOO |
Government |
GC01&UC(01,02,03) |
N.Kendhikulhudhoo |
28-March-19 |
24 months |
365 days |
- |
25 |
STATIC COMPANY PRIVATE LIMITED |
M.Huraa Fareedheemagu, Male |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY AND SEWERAGE FACILITIES IN TH.KINBIDHOO |
Government |
GC01&UC |
Th.Kinbidhoo |
28-March-19 |
24 months |
365 days |
- |
26 |
STATIC COMPANY PRIVATE LIMITED |
M.Huraa Fareedheemagu, Male |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY AND SEWERAGE FACILITIES IN HA.ULIGAM |
Government |
GC01&UC |
Ha. Uligamu |
28-March-19 |
24 months |
365 days |
- |
27 |
STATIC COMPANY PRIVATE LIMITED |
M.Huraa Fareedheemagu, Male |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY AND SEWERAGE FACILITIES IN GA.KANDUHULHUDHOO |
Government |
GC01&UC |
GA.Kanduhulhudhoo |
28-March-19 |
24 months |
365 days |
- |
28 |
GK Developments Pvt Ltd |
No.42 North Phase Industrial Estate, Ekkattuthangal, Chennai -006032 |
Foreign |
CONSTRUCTION OF ASPHALT ROADS IN ADDU CITY |
Government |
GC01&02, HC01,02,03 UC 01 |
S.Hithadhoo, S, Mardhoo,S.Maradhoo Feydhoo |
23-December-19 |
545 days |
365 days |
- |
29 |
UNI ENGINEERING PRIVATE LIMITED |
M.Dhaanaage 4A, Orchid Magu, Male' |
Local |
CONSTRUCTION OF NEW COUNCIL OFFICE BUILDING AT L.ISDHOO |
Government |
GC01&02, OB01-08, |
L.Isdhoo |
13-November-19 |
285 days |
06 months |
- |
30 |
ABYLA CONSTRUCTION PRIVATE LIMITED |
2nd Floor,Shinetree Building Male', Maldives |
Local |
M.SUNNYINN 10 STOREY BUILDING FINISHING WORKS |
Private |
GC01&02, OB01-08, |
M.Shine Inn, Male' |
10-October-13 |
86 months، 21 days |
360 days |
- |
31 |
KANBALIFARU DEVELOPMENT PRIVATE LIMITED |
M.Fehigiri ,1st Floor,Handhuvaree Higun, Male' |
Local |
CONSTRUCTION AND DEVELOPMENT OF TOURIST RESORT AT SH.KANBALIFARU |
Resort |
GC01 |
Sh.Kanbalifaru |
6-November-14 |
2242 days |
_ |
- |
32 |
W & A OVERSEAS PTE.LTD |
7th Floor,H.Fusthulhaamaage,Ameer Ahmed Magu, Male' |
Foreign |
CONSTRUCTION OF SOCIAL HOUSING 14 STOREY RESIDENTAL TOWERS HULHUMALE PHASE II NO:N3-20(D),N3-20(E) AND N3-20(F) |
Government |
GC01 &GC02 |
Hulhumale Phase II |
11-January-18 |
32 Months |
12 Months |
- |
33 |
VENZA COMPANY PRIVATE LIMITED |
1st Floor,10073 Hulhumale lot, Nirolhu Magu, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT MA.IRIS, MALE' |
Private |
GC01 &GC02 |
Ma.Airis, Male' |
1-July-19 |
18 months |
_ |
- |
34 |
SJ CONSTRUCTION PVT LTD |
Ma.Naseenee Handhuvaru, Male' |
Local |
DESIGN AND CONSTRUCTION OF SINGLE STOREY 100 HOUSING UNITS AT TH.THIMARAFUSHI |
Government |
GC01 &GC02 |
Th.Thimarafushi |
2-February-20 |
364 days |
_ |
- |
35 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
15 STOREY RESIDENTIAL BUILDING AT MA.SEERAAZEEGE-DEMOLITION & CONCRETE WORKS |
Private |
GC01 &GC02 |
Ma. Seeraazeege, Male' |
5-November-19 |
505 days |
365 Months |
- |
36 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF PROPOSED 02 STOREY MULTIPURPOSE HALL BLOCK - L.ISDHOO SCHOOL |
Government |
GC01 &GC02 |
L.Isdhoo School, L.Isdhoo |
23-December-19 |
210 days |
365 Months |
- |
37 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF L.FONADHOO MOSQUE |
Government |
GC01 &GC02 |
L.Fonadhoo |
28-Oct-19 |
300 days |
_ |
- |
38 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF PROPOSED 02 STOREY MULTIPURPOSE HALL BUILDING - SN.HITHADHOO ADDU HIGH SCHOOL |
Government |
GC01 &GC02 |
S.Hithadhoo |
15-Sep-19 |
210 days |
365 Months |
- |
39 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF PROPOSED 02 STOREY MULTIPURPOSE HALL BLOCK - FUVAHMULAH CITY,MJS |
Government |
GC01 &GC02 |
MJS School, Fuvah mulaku City |
23-Dec-19 |
210 days |
365 Months |
- |
40 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF PROPOSED 2 STOREY 6 CLASSROOM AT GDH.FIYOARI SCHOOL |
Government |
GC01 &GC02 |
Gdh.Fiyori Schoo, Gdh.Fiyori |
17-Oct-19 |
225 days |
365 Months |
- |
41 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
DESIGN ,BUILD AND CONSTRUCTION OF 100 HOUSING UNIT - LH.NAIFARU |
Government |
GC01 &GC02 |
Lh.Naifaru |
10-Feb-20 |
330 days |
365 days |
- |
42 |
HALFSIX INVESTMENT |
M.Kurevi, Chebeylee Magu, Male' |
Local |
CONSTRUCTION OF 3 STOREY GUEST HOUSE AT MALA-V.THINADHOO |
Private |
GC01 |
V.Thinadhoo |
16-Dec-19 |
12 months |
_ |
- |
43 |
SJ CONSTRUCTION PVT LTD |
Ma.Naseenee Handhuvaru, Male' |
Local |
CONSTRUCTION OF DHARUMAVANTHA NEW SCHOOL |
Government |
GC01 &GC02 |
Dharumavantha School, Male' |
14-Feb-20 |
364 days |
_ |
- |
44 |
FAHI ARUTHA MALDIVES PRIVATE LIMITED |
Ma.Ever Bright, Dhidhi Goalhi, Male' |
Local |
CONSTRUCTION OF 4 STOREY BUILDING -HULHUMALE LOT N0:11109 |
Private |
GC01 &GC02 |
Hulhumale' Lot no: 11109 |
1-Mar-20 |
365 days |
_ |
- |
45 |
HUNAN NO.6 ENGINEERING CO.LTD |
Hulhumale Row House No:16/7, No:05 Goalhi, Hithigas Magu, Male' |
Foreign |
DESIGN AND BUILD OF HULHUMALE' OFFICE BUILDING ON E.P.C TURNKEY BASIS |
Government |
GC01 &GC02 |
Hulhumale' |
13-Feb-20 |
365 days |
_ |
- |
46 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
CONSRUCTION OF 10 STOREY BUILDING - MA.HITHTHALAGE |
Private |
GC01 &GC02 |
Ma.Hiththalage Male' |
30-Dec-19 |
12 months |
_ |
- |
47 |
ROAD DEVELOPMENT CORPORATION LIMITED |
1st Floor,MNSL Building,Orchid Magu,Male' |
Local |
MALE' ROAD PROJECT- PHASE 1 |
Government |
GC01 &GC02 |
Male' |
26-Jan-20 |
2 years |
180 days |
- |
48 |
JIAZ-MALDIVES PRIVATE LIMITED |
M.Dhahaaab, Nikagas Magu, Male' |
Local |
CONSTRUCTION OF 7 FLOOR BUILDING AT HULHUMALE' PLOT NO 20018 |
Private |
GC01 &GC02 |
Hulhumale' Plot 20018 |
26-Oct-19 |
15 months |
_ |
- |
49 |
ATTOLLO CONSTRUCTION PRIVATE LIMITED |
3B, H. Valhufehi, Buruzu Magu, Male' |
Local |
CONSTRUCTION WORKS OF MAABINHURAA ISLAND RESORT |
Resort |
GC01 &GC02 |
Lh.Maabinhuraa |
20-Jan-19 |
2 years |
_ |
- |
50 |
ROTIME ENGINEERING AND TECHNOLOGY CO.LTD |
RM 1501(669), FSPACTR 53-55, Wanchai Lockatrd, Hong Kong |
Foreign |
CONSTRUCTION OF 02 BUILDING TOWERS OF STELCO HIYA PROJECT- HULHUMALE' PHASE 2 |
Government |
GC01 |
Hulhumale' Phase II |
1-Feb-18 |
911 days |
_ |
- |
51 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 15 STOREY BUILDING WITH BASEMENT -MCHABEYLI VILLA |
Private |
GC01 &GC02 |
M.Chanbeylivilaa |
1-Apr-18 |
28 months |
_ |
- |
52 |
ASCON BUILDERS PRIVATE LIMITED |
M.Irudevi, Feerozu Magu, Male' |
Local |
CONSTRUCTION OF L.KALAIDHOO MOSQUE |
Government |
GC01 &GC02 |
L.Kalaidhoo |
20-Jan-20 |
270 days |
_ |
- |
53 |
ASCON BUILDERS PRIVATE LIMITED |
M.Irudevi, Feerozu Magu, Male' |
Local |
CONSTRUCTION OF R.VAADHOO MOSQUE |
Government |
GC01 &GC02 |
R.Vaadhoo |
16-Dec-19 |
150 days |
_ |
- |
54 |
A MAN MALDIVES PVT LTD |
Ground Floor,M.Noothari, Male' |
Local |
CONSTRUCTION OF NEW COUNCIL BUILDING - GA.KONDEY |
Government |
GC01 &GC02 |
GA.Kondey |
25-Jan-20 |
365 days |
_ |
- |
55 |
BOSKALIS WESTMINSTER CONTRACTING LIMITED |
06th Floor H,Aage, Boduthakurufanu Magu, Male' |
Foreign |
DREDGING,LAND RECLAMATION AND REVETMENT WORKS -GULHIFALHU |
Government |
HC01,HC02 &HC03 |
K.Gulhifalhu |
20-Feb-20 |
06 months |
365 days |
- |
56 |
AAKEY'S INTERNATIONAL PRIVATE LIMITED |
6th Floor, Endheri, Unimaa Higun, Hulhumale' |
Local |
CONSTRUCTION & FINISHING WORKS OF 2 BED ROOM WATER VILLA,OVER WATER RESTAURANT,SUNSET BAR,2BED ROOMSEMI-WATER PRESIDENT SUITE AND GM BUILDING -V.KUNAVASHI |
Resort |
GC01 &GC02 |
V.Kunaavashi |
20-Nov-19 |
06 months |
_ |
- |
57 |
INTER OCEAN PTE LTD |
M.Roselin, Jambu Magu, Male' |
Local |
REPAIRING DAMAGED BEAMS OF 32 VILLAS AT TAJ CORAL RESORT & SPA |
Resort |
GC01 |
Taj Coral Reef Resort and Spa |
5-Sep-19 |
365 days |
- |
- |
58 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 15 STOREY BUILDING AT M.RANA TOWER |
Private |
GC01 &GC02 |
Ma. Rana Tower, Male' |
1-Dec-19 |
36 months |
365 days |
- |
59 |
COAST LINE PILING& CONSTRUCTION PRIVATE LIMITED |
M.Irufuheyge, Maaveyo Magu, Male' |
Local |
CONSTRUCTION OF 11 FLOOR BUILDING AT M.THULHAADHOOGE |
Government |
GC01 |
M.Thulhaadhooge, Male' |
15-May-19 |
36 months |
12 months |
- |
60 |
RAINBOW CONSTRUCTION PRIVATE LIMITED |
G.Maarana, Alikilegefaanu Magu |
Local |
CONSTRUCTION OF 11 STOREY BUILDING AT G.MANZARUGE |
Private |
GC01 &GC02 |
G.Manzaruge, Male' |
4-Dec-19 |
15 Months |
365 days |
- |
61 |
IMA GROUP PVT LTD |
1st Floor, M.Blue Sea,Kanbaaisha Ranihingun,Male' |
Local |
CONSTRCUTION OF ADDITIONAL FLOOR (9TH FLOOR), CONCERETE WORKS OF 8TH FLOOR, GARBAGE AREA AND PARKING, LIFT INSTALLATION, FINISING WORKS AT M.BLUE SEA |
Private |
GC01 &GC02 |
M.Bluesea, Male' |
1-Apr-20 |
18 months |
_ |
- |
62 |
MAZIYA CONSTRUCTION PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
CONSTRUCTION OF 11 STOREY BUILDIN AT M.GULISTHAANUGE |
Private |
GC01&GC02 |
M.Gulisthaanuge, Male' |
3-Apr-20 |
6 months |
12 months |
- |
63 |
CAPITAL INVESTMENT AND FINACE PRIVATE LIMITED |
4B,H.Melain,Boduthakurufaanu Magu,Male' |
Foreign |
REVETMENT WORKS AT GULHIFALHU (SUB-CONTRACT WORKS OF THE PROJECT DREDGING, LAND RECLAMATION AND REVETMENT AT K.GULHIFALHU AWARDED TO BOSKALIS WESTMINISTER CONTRCATING LIMITED (FC00142019) |
Government |
GC01&HC01 |
K.Gulhifalhu |
4-Feb-20 |
24 Months |
1 year |
- |
64 |
MAZIYA CONSTRUCTION PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
CONSTRUCTION OF 11 STOREY BUILDING AT M.MAALIMEEGE |
Private |
GC01&GC02 |
M.Maalimeege , Male' |
4-Feb-20 |
24 Months |
1 year |
- |
65 |
K.I.M GROUP PRIVATE LIMITED |
M.Fathaha,Fandiyaaru Magu,Male |
Local |
CONSTRUCTION OF 4 STOREY BUILDING AT G.TINU VEHI (SUBCONTRACTED BY LAND BUILDERS PRIVATE LIMITED (C-740/2008)) |
Private |
GC01 &GC02 |
G.Tinuvehi Male' |
30-Apr-20 |
24 Months |
_ |
- |
66 |
PRECISION ENGINEERING SERVICES (PRIVATE) LIMITED in JV with P.E.S MARINE SERVICE PRIVATE LIMITED |
M.Fulhafi,Gulhazaaru Goalhi,Male' |
JV |
DESIGN AND BUILD OF 100 HOUSING UNITS AT M.KOLHUFUSHI |
Government |
GC01 &GC02 |
M.Kolhufushi, Male' |
15-Jul-20 |
350 days |
365 days |
- |
67 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTON OF 10 STOREY FOUNDATION AND CONSTRUCTION OF 4 STOREY AT M.ZARF |
Private |
GC01 &GC02 |
M.Zarf , Male' |
8-Apr-20 |
12 months |
- |
- |
68 |
ALIA CONSTRUCTION PVT LTD |
3th Floor,M. Alia Building, Gandha koalhi Magu, Male' |
Local |
CONSTRUCTION AND DEVELOPMENT OF 2 STOREY MOSQUE AT HULHUMALE', C3-1 (LOT NO:11592) |
Private |
GCO1 |
Hulhumale' Lot no: C3-1 11592 |
20-Aug-19 |
24 months |
_ |
- |
69 |
HEAVY FORCE PRIVATE LIMITED |
2nd Floor, H.Fulidhooge,Kalaafaanu Higun, Male' |
Local |
DESIGN AND BUILD OF JETTY AND HARBOUR UPGRADE IN R.RASGETHEEMU |
Government |
HC01 |
R.Rasgetheemu |
28-Jun-20 |
420 days |
_ |
- |
70 |
HEAVY FORCE PRIVATE LIMITED |
2nd Floor, H.Fulidhooge,Kalaafaanu Higun, Male' |
Local |
DESIGN AND BUILD OF ADH.DHIDHOO HARBOUR |
Government |
HC01 |
Adh.Dhidhoo |
8-Jun-20 |
300 days |
_ |
- |
71 |
MAZIYA CONSTRUCTION PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
CONSTRUCTION OF MALE' SWIMMING TRACK SHED |
Private |
GC01&GC02 |
Male Swimming Track, Male |
23-Feb-20 |
190 days |
- |
- |
72 |
SANKEN OVERSEAS (PRIVATE) LIMITED |
8th Floor, Aagadhage Building, Boduthakurufaanu Magu, Male' |
Foreign |
DESIGN AND BUILD OF THE PROPOSED 80-ROOM AT ALILA RESORT |
Resort |
GC01 |
Kothaaifaru Island, R.Atoll |
1-Dec-19 |
17 months |
_ |
- |
73 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTON OF 11 STOREY FOUNDATION AND CONSTRUCTION OF 10 STOREY AT M.TITIAN |
Private |
GC01&2 |
M.Titian, Male' |
1-Jul-20 |
12 months |
_ |
- |
74 |
AWASMAGU CONSTRCUTION PRIVATE LIMITED |
M.Alakaa, Handhuvaree Hingun, Male' |
Local |
CONSTRUCTION OF 10 STOREY FOUNDATION AND 1ST FLOOR STRUCTURAL WORK AT G.RIDHAA |
Private |
GC01 |
G.Ridhaa, Male' |
25-Jun-20 |
2 months |
_ |
- |
75 |
CHINA STATE CONSTRUCTION ENGINEERING COREPORATION CORPORATION LIMITED |
6th Floor H.Aage' |
Foreign |
CONSTRUCTION OF 7000 HOUSING UNITS AT HULHUMALE PHASE II |
Government |
GC01 |
Hulhumale Phase II |
19-Dec-17 |
828 Days |
- |
- |
76 |
M.N INVESTMENT |
H.Rankokaafehi, Raivilla Higun ,Male' |
Local |
CONSTRCUTION OF 7 STOREY FOUNDATION AND FIRST 3 FLOOR STRUCTURAL WORKS AT G.ARUTHA |
Private |
GC01&2 |
G.Arutha, Male' |
15-Feb-20 |
8 Months |
- |
- |
77 |
URBIST PRIVATE LIMITED |
Flat 94-01-04, Rabarugas Magu,Hulhumale |
Local |
FINISHING WORKS OF 6TH FLOOR BUILDING AT HULHUMALE' LOT 10084 |
Private |
GC01 |
Hulhumale' Lot 10084 |
20-Jan-20 |
09 Months |
7 Days |
- |
78 |
FAF CONSTRUCTION & TRADING PRIVATE LIMITED |
Ma.Foniluboage, Kurikeela Magu, Male' |
Local |
CONSTRUCTION OF 11 STOREY BUILDING AT H.HEYN BEYN, MALE' |
Private |
GC01 |
H.Heyn Beyn, Male' |
1-Aug-20 |
30 months |
- |
- |
79 |
W CONSTRUCTION COMPANY PRIVATE LIMITED |
3rd Floor, H.Sheesha Vehi, Muthee Goalhi,Male |
Local |
CONSTRUCTION OF 15 STOREY BUILDING WITH BASEMENT AND 2/3 TERRACE AT H.SHEESHA BUILDING |
Private |
GC01 |
H.Sheesha Building, Male' |
28-Jul-20 |
36 Months |
- |
- |
80 |
PROPOSE CONSTRUCTION PRIVATE LIMITED |
Ground Floor, Ma.Double Eight, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF STRUCTURAL WORKS OF FLOOR 7, 8 & 9 AT G.GARNET |
Private |
GC01 |
G.Garnet, Male' |
13-Jul-20 |
6 Months |
- |
- |
81 |
K.I.M GROUP PRIVATE LIMITED |
M.Fathaha,Fandiyaaru Magu,Male |
Local |
CONSTRUCTION OF TEN STOREY RESIDENTIAL BUILDING AT G. TINY WAVES |
Private |
GC01 |
G.Tiny Waves, Male' |
1-Apr-19 |
18 months |
- |
- |
82 |
HIKAWI CONSTRUCTION PRIVATE LIMITED |
Ground Floor, Lot 11178, Chabeylee Magu, Goalhi 06, Hulhumale' |
Local |
CONSTRUCTION OF STRUCTURAL WORKS OF FLOOR 7, 8 & 9 AT G.GARNET |
Private |
GC01 |
M.Medalmaage Aage,Male' |
1-Mar-20 |
4 Years |
- |
- |
83 |
REXON BUILDERS PRIVATE LIMITED |
H.Aazaadhewaadhee, Dhunkuri Magu, Male' |
Local |
CONSTRUCTION OF CONCRETE WORSKS AND FINISHING WORK OF 10 STOREY BUILDING AT M.MEDALMAAGE AAGE, MALE' |
Private |
GC01 |
M. Kanamadhu, Male' |
15-Jul-20 |
18 months |
- |
- |
84 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRCUTION OF GROUND AND 1ST FLOOR CONCRETE AND FINISHING WORKS AT G.GURAHAAGE 12 STOREY BUILDING |
Private |
GC01 |
G.Gurahaage, Male' |
15-Jul-20 |
7 months |
1year |
- |
85 |
NEW LAYA CONSTRUCTION PRIVATE LIMITED |
M.Kuribee Lodge,Ihzuhdheen Magu, Male' |
Local |
CONSTRUCTION OF STRUCTURAL WORKS OF 4TH AND 5TH FLOOR AT G.HERETHERE 12 STOREY BUILDING |
Private |
GC01 |
G.Herethere, Male' |
5-Jul-20 |
92 days |
- |
- |
86 |
TAG CONSTRUCTION & SUPPLY PRIVATE LIMITED |
Block 6, Hulhumale Ferry Terminal, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION OF 5 STOREY BUILDING AT M.ALIVILUN |
Private |
GC01 |
M.Alivilun |
1-Jan-20 |
15 Months |
- |
- |
87 |
SCHEMATIC PRIVATE LIMITED |
Flat 120-02-04, Boaganvilla Magu,Hulhumale |
Local |
CONSTRUCTION OF 10 STOREY BUILDING WITH TERRACE AT G.OTTARU (PHASE 1) |
Private |
GC01 |
G.Ottaru, Male' |
1-Feb-20 |
10 Months |
- |
- |
88 |
MAAS INVESTMENT PRIVATE LIMITED |
10th Floor, M.Haagirige, Kanba Aisa Rani Hingun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H.DHIGGAAMAAGE |
Private |
GC01 |
H.Dhiggaamaage |
1-Apr-20 |
36 months |
- |
- |
89 |
PEARL TRAVEL SERVICE PRIVATE LIMITED |
H.Hirifushi, Asrafee Magu, Male' |
Local |
CONSTRUCTION OF FOUNDATTION OF 9 STOREY BUILDING AND CONSTRUCTION OF FIRST 6 FLOORS AT H. FENVILLA PALACE |
Private |
GC01 |
H.Fenvilla Palace |
1-Mar-20 |
1 Year |
- |
- |
90 |
WELVAART COMPANY PRIVATE LIMITED |
Ma.Baabulavaalee 1, Chandhanee Magu,Male' |
Local |
CONSTRCUTION OF FOUR STOREY FOUNDATION AND FISRT FLOOR AT MA.BAABUL AVAALEE 1 |
Private |
GC01 |
Ma.Baabul Avaalee1 |
10-Jul-20 |
90 Days |
- |
- |
91 |
CHAMPALARS HOLDINGS PRIVATE LIMITED |
4th Floor, Champaa Building , Bandidhon Maniku Goalhi, Male' |
Local |
CONSTRUCTION OF TOURIST RESORT AT LH.DHERUFFINOLHU |
Resort |
GC01&2 |
LH.Dheruffinolhu |
24-Jul-14 |
2345 days |
- |
- |
92 |
KIYOTO REEF PRIVATE LIMITED |
V.Kiyoto, Veshi Magu, Villimale |
Local |
CONSTRUCTION OF 5 STOREY BUILDING AND TERRACE AT M.ALUNTHILA 2 |
Private |
GC01 |
M.Alunthila 2 |
1-Aug-20 |
24 Months |
- |
- |
93 |
NEW LAYA CONSTRUCTION PRIVATE LIMITED |
M.Kuribee Lodge,Ihzuhdheen Magu, Male' |
Local |
CONSTRUCTION OF STRUCTURAL WORKS OF 4TH, 5TH, 6TH AND 7TH FLOOR AT M.MILET 10 STOREY BUILDING |
Private |
GC01 |
M.Milet, Male' |
10-Jun-20 |
180 days |
- |
- |
94 |
NEW LAYA CONSTRUCTION PRIVATE LIMITED |
M.Kuribee Lodge,Ihzuhdheen Magu, Male' |
Local |
CONSTRUCTION OF STRUCTURAL WORKS OF 2ND AND 3RD FLOOR AT MA.SYBOOGE 10 STOREY BUILDING |
Private |
GC01 |
Ma.Seybooge, Male' |
1-Jul-20 |
120 days |
- |
- |
95 |
MULTI ROUTE PRIVATE LIMITED |
M.Ali Havaa, Badharumathi Higun, Male' |
Local |
CONSTRUCTION OF STRUCTURAL WORKS OF 8 STOREY BUILDING WITH ROOFTOP AT MA.SHAADHU |
Private |
GC01 |
Ma.Shaadhu |
30-Jun-20 |
10 Months |
- |
- |
96 |
K.I.M GROUP PRIVATE LIMITED |
M.Fathaha,Fandiyaaru Magu,Male |
Local |
CONSTRUCTION OF STRUCTURE FOR 10 STOREY BUILDING AT H.FUJEYRA |
Private |
GC01 |
H.Fujeyraa |
1-Feb-20 |
18 Months |
2 Months |
- |
97 |
S.R PRO PRIVATE LIMITED |
Malas, Sh.Funadhoo |
Local |
CONSTRUCTION OF STURUCTURAL WORKS OF 2 SLABS AT M.MAGARA |
Private |
GC01 |
M.Magara, Male' |
10-Jul-20 |
3 Months |
1 year |
- |
98 |
CHINA STATE CONSTRUCTION MALDIVES PRIVATE LIMITED |
6th Floor, H.Aage, Boduthakurufaanu Magu, Male' |
Foreign |
CONSTRUCTION OF CHANNEL BETWEEN PHASE 1 & 2 IN HULHUMALE' |
Government |
GC02 |
Hulhumale Phase II |
1-Jan-20 |
488 days |
- |
- |
99 |
ALIA CONSTRUCTION PVT LTD |
3rd Floor,M. Alia Building, Gandha koalhi Magu, Male |
Local |
CONSTRUCTION 6 STOREY (& TERRACE) BUILDING AT HULHUMALE LOT NO: 11055 |
Private |
GC01 |
Lot 11055, Hulhumale |
22-Aug-20 |
18 months |
1 year |
- |
100 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION OF 13 STOREY BUILDING AT M.THREE A VILLA |
Private |
GC01 |
M.Three A Villa, Male' |
1-Aug-20 |
19 months |
1 Year |
- |
101 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION OF 10 STOREY FOUNDATION AND CONSTRUCTION AND FINISHING OF FIRST THREE FLOOR WORKS AT MA.HANDHUVAREE VILLA |
Private |
GC01 |
Ma. Handhuvaree Villa, Male' |
1-Aug-20 |
08 months |
1year |
- |
102 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION OF 13 STOREY BUILDING FOUNDATION WORKS AND CONSTRCUTION OF GROUND AND FIRST FLOOR AT M.SAILA |
Private |
GC01 |
M.Saila, Male' |
1-Mar-20 |
7 Months |
1year |
- |
103 |
W CONSTRUCTION COMPANY PRIVATE LIMITED |
3rd Floor, H.Sheesha Vehi, Muthee Goalhi,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT G.ZIHU |
Private |
GC01 |
G.Zihu, Male' |
15-Feb-20 |
12 Months |
- |
- |
104 |
RAPID CONSTRUCTION PRIVATE LIMITED |
G.Lux Villa,Dhonadhaaraada Higun |
Local |
CONSTRUCTION OF CONCERETE SLAB ON 3RD FLOOR AT MA. BLUE CORAL |
Private |
GC01 |
Ma. M.Blue Coral, Male' |
30-Aug-20 |
60 days |
- |
- |
105 |
BOSKALIS WESTMINSTER CONTRACTING LIMITED |
06th Floor H,Aage, Boduthakurufanu Magu, Male |
Foreign |
DREDGING,LAND RECLAMATION AND REVETMENT WORKS -GULHIFALHU |
Government |
GC01 |
Gulhifalhu |
14-Jun-20 |
06 months |
1year |
- |
106 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT G.ASTERS TOWER |
Private |
GC01 |
G.Asters Tower, Male' |
1-Jan-20 |
18 Months |
1year |
- |
107 |
YUAAN COMPANY PRIVATE LIMITED |
Azaaliya, Lot 11322, Rabarugas Magu Goalhi 07, Hulhumale |
Local |
08 FLOORS FOUNDATION WORKS OF 06 STOREY BUILDING AT HULHUMALE' LOT 10382 |
Private |
GC01 |
Hulhumale' Lot 10382 |
5-Sep-20 |
01 month |
- |
- |
108 |
YUAAN COMPANY PRIVATE LIMITED |
Azaaliya, Lot 11322, Rabarugas Magu Goalhi 07, Hulhumale |
Local |
STRUCTURAL AND FINISHING WORKS OF 03 FLOORS AT HULHUMALE' LOT 10579 |
Private |
GC01 |
Hulhumale' Lot 10579 |
3-Sep-20 |
3years 03 Months |
- |
- |
109 |
DEPICT PRIVATE LIMITED |
H.Woodland Aage, Kaani Goalhi,Male' |
Local |
CONCRETE WORKS OF 4TH FLOOR OF 10 STOREY BUILDING AT H.PAAYAL |
Private |
GC01 |
H.Paayal |
15-Aug-20 |
35 Days |
- |
- |
110 |
THE SECUMO PRIVATE LIMITED |
H.Port Side,Boduthakurufaanu Magu,Male' |
Local |
BUILDING 27 WATER VILLAS IN SONEVA JANI(N.MEDHUFARU ISLAND) UNDER SONEVA JANI RESORT DEVELOPMENT PROJECT,PHASE 2 |
Private |
GC01 |
N.Medhufaru |
26-Jul-20 |
153 days |
- |
- |
111 |
ABC CONSTRUCTION PVT LTD |
1st Floor,G.Niooranfini, Kalhuhura Magu,Male' |
Local |
CONSTRUCTION OF 8 STOREY BUILDING AT G.VAIJEHEYGE AAGE,MALE |
Private |
GC01 |
G.Vaijeheyge Aage |
10-Aug-20 |
300 days |
- |
- |
112 |
ABC CONSTRUCTION PVT LTD |
1st Floor,G.Niooranfini, Kalhuhura Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT M.SAVARIN,MALE' |
Private |
GC01 |
M.Savarin,Male' |
25-Aug-20 |
396 days |
- |
- |
113 |
ABC CONSTRUCTION PVT LTD |
1st Floor,G.Niooranfini, Kalhuhura Magu,Male' |
Local |
CONCRETE AND FINISHING WORKS OF 5TH TO 10TH FLOOR(TERRACE FLOOR) INCLUDING LIFT INSTALLATION AT MA.FANAARU,MALE' |
Private |
GC01 |
Ma.Fanaaru,Male' |
19-Mar-20 |
14 months |
- |
- |
114 |
HAIMAN CONSTRUCTION PVT LTD |
G.Green House, Dhonadharaadha Hingun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT MA.RIHIFASHUVIGE,MALE' |
Private |
GC01 |
M.Rihifashuvige,Male' |
1-Jan-19 |
36 Months |
- |
- |
115 |
MAZIYA SERVICES PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male |
Local |
CONSTRUCTION WORKS OF THE PENDING 5 FLOORS OF 10 STOREY BUILDING AT M.ENZIYAN,MALE |
Private |
GC01 |
M.Enziyan,Male |
2-Aug-20 |
7 Months |
- |
- |
116 |
MICRON PRIVATE LIMITED |
M.Nice Dream, Kanbaa Aisa Rani Hingun, Male' |
Local |
SLAB WORK OF 3RD- 6TH FLOOR OF H.MAABANDEYRIAAGE |
Private |
GC01 |
H.Maabandeyriaage |
1-Aug-20 |
90 Days |
- |
- |
117 |
GLUT INVESTMENTS PRIVATE LIMITED |
G.Blue Whale, Alikilegefaanu Magu,Male |
Local |
CONCRETE WORKS OF 16 STOREY BUILDING AT MA.HAIVAKARUGE (PHASE 1) |
Private |
GC01 |
Ma.Haivakaruge |
1-Jul-19 |
561 Days |
1 year |
- |
118 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CASTING FOUNDATION FOR 10 STOREY BUILDING AND CONSTRUCTION AND FINISHING OF GROUND FLOOR TO FORTH FLOOR AT M.ZAMEEN |
Private |
GC01 |
M.Zameen |
9-Sep-20 |
18 months |
1 year |
- |
119 |
JIAZ-MALDIVES PRIVATE LIMITED |
M.Dhahaaab, Nikagas Magu, Male' |
Local |
CONSTRUCTON OF 10 STOREY FOUNDATION AND CONCRETE AND FINISHING WORKS OF GROUND, 1ST, AND SECOND FLOOR AT MA.VINAMA |
Private |
|
Ma. Vinama |
15-Dec-19 |
09 months |
- |
- |
120 |
STATIC COMPANY PRIVATE LIMITED |
M.Huraa Fareedheemagu, Male |
Local |
DESIGN AND BUILD OF WATER SUPPLY AND SEWERAGE FACILITIES IN SH.NARUDHOO,SH.MAAUNGOODHOO, N.LOLHI AND DESIGN AND BUILD OF WATER SUPPLY SYTEM AIN N.HOLHUDHOO (PACKAGE 2) |
Government |
GC01 &UC |
SH.Narudhoo,SH.Maaungoodhoo, N.Lolhi, N.Holhudhoo |
29-Sep-19 |
24 months |
1 year |
- |
121 |
AMANAT |
V.Translvania, Kandoomaa Goalhi, Male' |
Local |
CONSTRUCTION OF FOUR FLOOR BUILDING AT M.RAHADHOO |
Private |
GC01 |
G.Rahadhoo |
15-Mar-20 |
322 Days |
- |
- |
122 |
FAF CONSTRUCTION & TRADING PRIVATE LIMITED |
Ma.Foniluboage, Kurikeela Magu, Male' |
Local |
CONCRETE WORKS OF 09 STOREY BUILDING AT MA.SENTRITA |
Private |
GC01 |
Ma.Sentrita |
16-Aug-20 |
2 Months |
- |
- |
123 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION WORK OF 10 STOREY AND CONSTRUCTION OF 02 STOREY AT H.JANAVAREE VILLA |
Private |
GC01 |
H. Janavaree Villa |
1-Aug-20 |
9 Months |
- |
- |
124 |
DEPICT PRIVATE LIMITED |
H.Woodland Aage, Kaani Goalhi,Male' |
Local |
CONCRETE WORKS OF 4TH FLOOR OF 10 STOREY BUILDING AT M.AARO |
Private |
GC01 |
M.Aaro |
21-Aug-20 |
28 Days |
- |
- |
125 |
SCHEMATIC PRIVATE LIMITED |
Flat 120-02-04, Boaganvilla Magu,Hulhumale |
Local |
CONSTRUCTION OF 10 STOREY BUILDING WITH TERRACE AT G.OTTARU (PHASE 1) |
Private |
GC01 |
G.Ottaru, Male' |
1-Feb-20 |
18 Months |
- |
- |
126 |
FEDO PRIVATE LIMITED
|
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT G.RANGIREEGE,MALE' |
Private |
GC01 |
G.Rangireege |
13-May-19 |
22 Months |
- |
- |
127 |
FEDO PRIVATE LIMITED
|
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING WITH TERRACE AT MA.ZEPLIN |
Private |
GC01 |
Ma.Zeplin |
15-Sep-19 |
26 Months |
- |
- |
128 |
MARUKAB PRIVATE LIMITED |
H.Rihi,Ameer ahmed Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING WITH TARRACE AT H.MAAVADIGE |
Private |
GC01 |
H.Maavadige |
1-Oct-18 |
3 Years |
- |
- |
129 |
BORN TO BUILD PRIVATE LIMITED |
M.Viludholhi, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION OF 13 STOREY BUILDING AT M.FINIFARU |
Private |
GC01 |
M.Finifaru |
1-Jan-19 |
36 Months |
- |
- |
130 |
MAALAA HIGH RISING CONSTRUCTION PVT LTD |
G.Miles,Koimalaa Hingun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING WITH BASEMENT AT H.RIHIDHOOLAGE |
Private |
GC01 |
H.Rihidhoolage |
22-Jun-18 |
30 Months |
- |
- |
131 |
MAZIYA SERVICES PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
CONSTRUCTION OF 09 STOREY BUILDING AND TARRACE AT G.NOORANGE |
Private |
GC01 |
G.Noorange |
1-Jan-20 |
20 Months |
- |
- |
132 |
TLT CONSTRUCTION PRIVATE LIMITED |
M.Beach Flat, Sabudheli Magu, Male' |
Local |
CONSTRUCTION OF SEVEN STOREY BUILDING AT M.AHLAM VILLA |
Private |
GC01 |
M.Ahlam Villa |
15-Mar-20 |
24 months |
- |
- |
133 |
Aima Construction Company Pvt Ltd |
H.Woodland Aage, Kaani Goalhi,Male' |
Local |
CONCRETE WORKS OF 4TH FLOOR OF 10 STOREY BUILDING AT M.AARO |
Private |
GC01 |
Ma.Felina |
1-Feb-20 |
467 Days |
- |
- |
134 |
JIAZ-MALDIVES PRIVATE LIMITED |
M.Dhahaaab, Nikagas Magu, Male' |
Local |
CONSTRUCTION OF 08 FLOOR BUILDING WITH TARRACE AT MA.HATHUVAA |
Private |
GC01 |
Ma. Hathuvaa |
1-Nov-19 |
24 Months |
- |
- |
135 |
STATIC COMPANY PRIVATE LIMITED |
M.Huraa Fareedheemagu, Male |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY AND SEWERAGE FACILITIES IN SH.MAROSHI,MALDIVES |
Private |
GC01 |
Sh.Maroshi |
12-Jun-19 |
24 Months |
- |
- |
136 |
FEDO PRIVATE LIMITED
|
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT MA.KANDUBALAAGE,MALE' |
Private |
GC01 |
Ma.Kandubalaage |
1-Sep-20 |
486 Days |
- |
- |
137 |
VANQUISHER CONSTRUCTION COMPANY PVT LTD |
Ma. Maaranga, Dhaburu Magu, Male' |
Local |
FOUNDATION WORKS, CONCRETE AND FINISHING WORKS OF 13 STOREY BUILDING AT M.MARCORNI |
Private |
GC01 |
M.Marconi |
5-Apr-18 |
36 Months |
- |
- |
138 |
TAG CONSTRUCTION & SUPPLY PRIVATE LIMITED |
Block 6, Hulhumale Ferry Terminal, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION WORKS OF 4TH AND 5TH FLOOR AT G.VELAGALAA |
Private |
GC01 |
G.Velagala |
1-Jul-20 |
183 Days |
- |
- |
139 |
ALITHO INVESTMENT MALDIVES PRIVATE LIMITED |
M.Love Nest, Kanba Aisa Rani Hingun,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT MA.ALIFU |
Private |
GC01 |
Ma.Alifu |
13-Jun-20 |
24 Months |
- |
- |
140 |
PEARL WORKS PRIVATE LIMITED |
Ma.Raiy Endheri, Badifasgandu Magu, Male' |
Local |
CONSTRUCTION AND FINISHING WORKS OF 3 STOREY BUILDING AT RIVELI, TH.MADIFUSHI |
Private |
GC01 |
Riveli , Th.Madifushi |
31-Oct-20 |
3 Years |
- |
- |
141 |
VANQUISHER CONSTRUCTION COMPANY PVT LTD |
Ma. Maaranga, Dhaburu Magu, Male' |
Local |
CONSTRUCTION OF 6 STOREY BUILDING AT HULHUMALE' PHASE 2 , LOT 20056 |
Private |
GC01 |
Hulhumale , Phase 2, Lot: 20056 |
21-Jul-20 |
13 Months |
- |
- |
142 |
SAS E CONSTRUCTION PRIVATE LIMITED |
1st Floor,M.Ebage, Irumaa Magu,Male' |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY AND SEWERAGE FACILITIES IN HA.FILLADHOO, HD.FINEY AND HD.NAIVAIDHOO (PACKAGE 1 ) |
Government |
UC01 &03 |
Ha.Filladhoo, Hd.Finey and Hdh,Naivaadhoo |
20-Oct-19 |
752 Days |
- |
- |
143 |
DEPICT PRIVATE LIMITED |
H.Woodland Aage, Kaani Goalhi,Male' |
Local |
CONCRETE WORKS OF 5TH AND 6TH FLOOR OF 10 STOREY BUILDING AT H.PAAYAL |
Private |
GC01 |
H.Paayal |
15-Sep-20 |
90 Days |
- |
- |
144 |
MAALAA HIGH RISING CONSTRUCTION PVT LTD |
G.Miles,Koimalaa Hingun, Male' |
Local |
CONSTRUCTION WORKS OF 10 STOREY BUILDING AT MALE HIGHER SECONDRY SCHOOL (TOWER 2) |
Private |
GC01 |
Male Higher Secondry School, Male' |
1-Jan-20 |
15 Months |
1 Year |
- |
145 |
NALAHIYA CONSTRUCTION AND DEVELOPMENT PRIVATE LIMITED |
M.Nalahiya, Fareedhee Magu, Male' |
Local |
CONCERETE WORKS OF 10 STOREY BUILDING AT G.MAAGAHAA |
Private |
GC01 |
G.Maagaha |
25-May-19 |
2 years |
- |
- |
146 |
TAG CONSTRUCTION & SUPPLY PRIVATE LIMITED |
Block 6, Hulhumale Ferry Terminal, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION OF CONCRETE WORKS AT 10TH FLOOR & LIFT ROOM WORKS OF 10 STOREY BUILDING AY MA. NOOMAS |
Private |
GC01 |
Ma. Noomas, Male' |
1-Jul-20 |
06 Months |
- |
- |
147 |
SHIRMEENA CONSTRUCTION PRIVATE LIMITED |
G. Zamaaneege, Alikaleygefaanu Magu, Male' |
Local |
FOUNDATION AND CONCERETE WORKS OF 7 STOREY BUILDING AT MA.FUNAMAAGE |
Private |
GC01 |
Ma.Funamaage |
8-Nov-19 |
419 Days |
- |
- |
148 |
MAALAA HIGH RISING CONSTRUCTION PVT LTD |
G.Miles,Koimalaa Hingun, Male' |
Local |
CONSTRUCTION OF 15 STOREY BUILDING AT M.BEYDHANAAGE |
Private |
GC01 |
M.Beydhanaa |
25-Sep-19 |
24 Months |
- |
- |
149 |
PEARL TRAVEL SERVICE PRIVATE LIMITED |
admin@peartravelservice.com |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT M.MADITHILA |
Private |
GC01 |
M.Madithila |
1-Oct-20 |
2 Years |
- |
- |
150 |
VANQUISHER CONSTRUCTION COMPANY PVT LTD |
Ma. Maaranga, Dhaburu Magu, Male' |
Local |
FOUNDATION AND CONCRETE WORKS OF 6 FLOOR BUILDING AT HULHUMALE' LOT 10992 |
Private |
GC01 |
Hulhumale' Lot 10992 |
15-Mar-20 |
09 Months |
- |
- |
151 |
VAALY CONSTRUCTION PRIVATE LIMITE |
5th Floor, Vaaly Villa, Majeedheemagu |
Local |
CONCRETE WORKS OF 3 FLOORS (3RD, 4TH AND 5TH) AT H.JOINTER |
Private |
GC01 |
H.Jointer, Male' |
1-Sep-20 |
04 months |
- |
- |
152 |
CHINA STATE CONSTRUCTION MALDIVES PRIVATE LIMITED |
6th Floor, H.Aage, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION OF 11 STOREY COMMERCIAL OFFICE BUILDING FOR OOREDOO MALDIVES PLC |
Private |
GC01 |
Ooredoo Maldives Plc |
10-Sep-20 |
600 Days |
- |
- |
153 |
PEARL MILLET CONSTRUCTION PRIVATE LIMITED |
2nd Floor, H.Kandoomaage, Apt 2, Mushtharee Magu, Male' |
Local |
CONCRETE AND FINISHING WORKS AT 4TH TO 7TH FLOORS OF 8 STOREY BUILDING AT H.KAN'DOOMAAGE |
Private |
GC01 |
H.Kan'doomaage, Male' |
15-Aug-20 |
504 Days |
- |
- |
154 |
PEARL MILLET CONSTRUCTION PRIVATE LIMITED |
2nd Floor, H.Kandoomaage, Apt 2, Mushtharee Magu, Male' |
Local |
CONCRETE WORKS OF 5TH FLOOR SLAB AND CONCERET, MASONARY WORKS OF 6TH TO 9TH FLOOR & TARRACE AND PLASTERING WORKS OF 10 FLOOR BUILDING AT M.BEACH ROADGE |
Private |
GC01 |
M.Beach Roadge, Male' |
1-Sep-20 |
175 Days |
- |
- |
155 |
RENOCON PRIVATE LIMITED |
Ma. Kufraa, Kameenee Magu, Male' |
Local |
CONSTRUCTION WORKS OF FIRST 4 FLOORS oF 6 STOREY BUILDING AT HULHUMALE LOT 11330 |
Private |
GC01 |
Hulhumale' Lot 11330 |
10-Sep-20 |
3 Years |
- |
- |
156 |
RENOCON PRIVATE LIMITED |
Ma. Kufraa, Kameenee Magu, Male' |
Local |
CONSTRUCTION WORKS OF 04 STOREY OF 10 STOREY & TERRACE BUILDING AT MA.ROCKS DALE |
Private |
GC01 |
Ma.Rocks Dale, Male' |
10-Sep-20 |
11 Months |
- |
- |
157 |
3DA CONSTRUCTION PRIVATE LIMITED |
Ma.Rabeeuge, Javaahiru Magu, Male' |
Local |
CONSTRUCTION OF 9TH AND 10TH FLOOR SLAB WORKS OF 10TH STOREY BUILDING AT H.ACROPOLICE |
Private |
GC01 |
H.Acropolice, Male' |
1-Sep-20 |
5 Months |
- |
- |
158 |
FENMULI CONSTRUCTIONS PRIVATE LIMITED |
H.Shark, Mustharee Magu, Male' |
Local |
CONSTRUCTON OF 10 STOREY BUILDING AT G.FINIHIYA VIEW |
Private |
GC01 |
G.Finihiya View, Male' |
1-Feb-20 |
16 Months |
- |
- |
159 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION WORKS , CONSTRUCTION OF 1ST 2 FLOORS OF 10 STOREY BUILDING AT MA.MILAKOARAAGE |
Private |
GC01 |
Ma.Milkoaraage |
1-Aug-20 |
12 Months |
- |
- |
160 |
AGMA MALDIVES PTE LTD |
1st Floor, M.Green Eye, Javaahiru Magu, Male' |
Local |
CONCRETE CASTING WORKS OF 2ND FLOOR OF 10 STOREY BUILDING WITH TERRACE AT M.SILVER BEACH |
Private |
GC01 |
M.Silver Beach, Male' |
15-Sep-20 |
1 Months |
- |
- |
161 |
NEW CONSTRUCTION PTE LTD |
Ma. Maafolheyge, Nikagas Magu, Male' |
Local |
FOUNDATION WORKS AND CONSTRUCTION OF FIRST TWO FLOORS OF 07 STOREY (WITH TERRACE) BUILDING AT MA.CHANBEYLEE AAGE |
Private |
GC01 |
Ma. Chambeylee Aage, Male' |
1-Feb-20 |
18 Months |
- |
- |
162 |
B BUILDERS PRIVATE LIMITED |
2nd Floor, H.Hani Dhoadhi, Boduthakurufaanu Magu, Male' |
Local |
CONCERETE WORKS OF 6-9 FLOOR OF 10 STOREY BUILDING AT M.BEACH ROADGE (Sub-contract work from Pearl Millet Construction Private Limited (C-0110/2013)) |
Private |
GC01 |
M.Beach Roadge, Male' |
10-Sep-20 |
04 Months |
- |
- |
163 |
MULTI SKILL COMPANY PVT LTD |
G.Finivilu, Dhomaidharaadha Higun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDNG AT G.ALLPARISE |
Private |
GC01 |
G.All Paris |
3-Apr-19 |
36 Months |
- |
- |
164 |
INNF CONSTRUCTION COMPANY PVT LTD |
G.Finivilu, Dhomaidharaadha Higun, Male' |
Local |
FOUNDATION WORKS 10 STOREY BUILDING AND CONSTRUCTION OF FIRST 3 FLOORS AT MA.THARAADHU |
Private |
GC01 |
Ma. Tharaadhu |
19-Sep-20 |
9 months |
- |
- |
165 |
NELKE' COMPANY PVT LTD |
H.Roasan View, Vaijehey Maage, Male' |
Local |
FOUNDATION WORKS OF 10 STOREY BUILDING AND CONCRETE WORKS OF FIRST 4 FLOORS AND FINISHING WORKS OF 2ND AND 3RD FLOOR AT H.VINOLIYA |
Private |
GC01 |
H.Vinoliya, Male' |
20-Aug-20 |
27 Months |
08 Months |
- |
166 |
AMIN CONSTRUCTION PRIVATE LIMITED |
2nd Floor,M.World Dream, Handhuvaree Hingun, Male' |
Local |
DEVELOPMENT OF AMINGIRI RESORT - PHASE 2 |
Private |
GC01 |
K.Kohdhipparu |
4-Sep-19 |
2 Years |
- |
- |
167 |
VIEW CONSTRUCTION PRIVATE LIMITED |
G.New Sharaaz, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION WORKS OF 10 STOREY BUILDING AND CONSTRUCTION OF FIRST THREE FLOORS AT MA.DANITY |
Private |
GC01 |
Ma.Danity, Male' |
1-Aug-17 |
1248 Days |
- |
- |
168 |
K.I.M GROUP PRIVATE LIMITED |
M.Fathaha,Fandiyaaru Magu,Male |
Local |
CONCERETE WORKS OF 5TH TO 08TH FLOOR OF 8 STOREY BUILDING AT MA.KHATHUVAA (Sub-contract work from Jiaz-Maldives Private Limited (C-22/2005)) |
Private |
GC01 |
Ma. Hathuvaa |
9-Sep-20 |
153 Days |
- |
- |
169 |
ALAAF PRIVATE LIMITED |
7B, Ma.Dhilkushaage, Dhilkushaa Goalhi, Male' |
Local |
ROOF SLAB WORKS OF 11 FLOOR BUILDING AT H.CARRIBIAN |
Private |
GC01 |
H.Carribian, Male' |
15-Sep-20 |
45 Days |
12 months |
- |
170 |
DONBE'Z PRIVATE LIMITED |
H.Sheeraz, Mustharee Magu, Male' |
Local |
CONCRETE WORKS OF TARRACE FLOOR OF 10 STOREY BUILDING AT H.SHEERAZ |
Private |
GC01 |
H.Sheeraz, Male' |
25-Aug-20 |
02 Month |
- |
- |
171 |
LITUS CONSTRUCTION PRIVATE LIMITED |
3rd Floor M. Faaroshige, Orchid Magu, Male' |
Local |
CONSTRCUTION OF 4TH AND 5TH FLOOR OF 7 STOREY BUILDING AT H.AM HOUSE |
Private |
GC01 |
H.A.M. House , Male' |
15-Sep-20 |
46 Days |
- |
- |
172 |
BUILT SPACES PRIVATE LIMITED |
M.Pole Star, Jambu Magu |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT MA.LIVAAZAA HOUSE |
Private |
GC01 |
Ma. Liwaza House |
10-Oct-20 |
18 Months |
6 Months |
- |
173 |
E.W. CONSTRUCTION PRIVAET LIMITED |
M.Aasmaa Villa, Dhakadha Magu, Male' |
Local |
FOUNDATION WORKS OF 10 STOREY BUILDING, CONCRETE WORKS OF FIRST 3 FLOORS AND FINISHING WORKS OF 2ND FLOOR AT M.ISVAARU |
Private |
GC01 |
M. Isvaaru |
15-Jan-20 |
365 Days |
- |
- |
174 |
MAZIYA SERVICES PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
CONSTRUCTION OF 2ND AND 3RD FLOOR OF 10 STOREY BUILIDNG AT M.BANANA LEAF |
Private |
GC01 |
M.Banana Leaf, Male' |
1-Sep-20 |
7 Months |
- |
- |
175 |
VANQUISHER CONSTRUCTION COMPANY PVT LTD |
Ma. Maaranga, Dhaburu Magu, Male' |
Local |
CONSTRUCTION OF FOUNDATION & STRUCTURAL WORKS OF 6 STOREY BUILDING AT HULHUMALE LOT 11053 |
Private |
GC01 |
Hulhumale Lot: 11053 |
20-Jun-19 |
29 Months |
- |
- |
176 |
CHINA MACHINERY ENGINEERING CORPORATION |
8th Floor,H.Suez,Ameer Ahmed Magu,Male' |
Local |
CONSTRUCTION OF 1530 HOUSING UNIT PROJECT PHASE III AT HULHUMALE' |
Private |
GC01 |
Hulhumale Phase II |
15-Mar-18 |
1460 Days |
- |
- |
177 |
TWO A COMPANY PVT LTD |
2nd Floor, H.Alcove, Roashanee Magu, Male' |
Local |
CONSTRCUTION OF 6TH TO 10TH FLOOR (WITH TERRACE) OF 10 STOREY BUILDING AT H.AAGARAA HOSUE |
Private |
GC01 |
H.Aagaraa House |
27-Aug-20 |
20 Months |
- |
- |
178 |
DOMUS PVT LTD |
M. Rosyside, Janbumagu, Male' |
Local |
FOUNDATION WORKS, CONCRETE AND EXTERNAL WALLS WORKS OF 5 STOREY BUILIDNG WITH TERRACE AT M.FRESCO |
Private |
GC01 |
M. Fresco, Male' |
3-Oct-20 |
8 Months |
- |
- |
179 |
AWASMAGU CONSTRUCTION PRIVATE LIMITED |
M.Alakaa, Handhuvaree Hingun, Male' |
Local |
CONCRETE AND FINISHING WORKS OF 4TH AND ABOVE FLOORS UP TO TERRACE FLOOR OF 12 STOREY BUILDING AT MA.SHAHEEN |
Private |
GC01 |
Ma.Shaaheen |
17-Oct-20 |
24 months |
- |
- |
180 |
AWASMAGU CONSTRUCTION PRIVATE LIMITED |
M.Alakaa, Handhuvaree Hingun, Male' |
Local |
CONCRETE WORKS OF FLOORS 2 TO 10 AND TARRACE AT 10 FLOOR BUILDING AT G.RIDHAA |
Private |
GC01 |
G.Ridhaa |
25-Oct-20 |
11 months |
- |
- |
181 |
NUGA CONSTRUCTION COMPANY PRIVATE LIMITED |
Dharuma, Havitha Magu, Hoadhandu, Fuvahmulah City |
Local |
CONCRETE AND FINISHING WORKS OF GROUND FLOOR AND FIRST FLOOR AT MA.ANBARAA |
Private |
GC02 |
Ma.Anbara |
18-Oct-20 |
4 Months |
- |
- |
182 |
FENMULI CONSTRUCTIONS PRIVATE LIMITED |
H.Shark, Mustharee Magu, Male' |
Local |
STRUCTURE WORKS OF 2ND AND ABOVE SHEETS UP TO 9TH FLOOR WITH TERRACE OF 12 STOREY BUILDING AT MA.MAAVELAAVARU |
Private |
GC01 |
Ma.Maavelaavaru |
7-Apr-20 |
12 Months |
- |
- |
183 |
MAZIYA SERVICES PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
CONSTRUCTION OF 7TH AND 8TH FLOORS AT M.BANANA LEAF |
Private |
GC01 |
M.Banana Leaf, Male' |
1-Sep-20 |
7 Months |
- |
- |
184 |
DEPICT PRIVATE LIMITED |
H.Woodland Aage, Kaani Goalhi,Male' |
Local |
CONCRETE WORKS OF 06 STOREY BUILDING AT MA.ZELEETHAN,MALE' |
Private |
GC01 |
Ma.Zeleethan |
18-Sep-20 |
12 Months
|
- |
- |
185 |
MICRO BUILDERS PVT LTD |
H. Kurumbaa Villa (GA), Seasan Magu, Male' |
Local |
CONCRETE AND EXTERNAL WALLS MASONARY WORKS OF 9 FLOORS (FLOORS ABOVE 1ST FLOOR) OF 10 STORY BUILDING AT M.HUDHU ASURUMAAGE |
Private |
GC01 |
M. Hudhuasurumaage, Male' |
11-Jul-20 |
12 Months |
- |
- |
186 |
VANQUISHER CONSTRUCTION COMPANY PVT LTD |
Ma. Maaranga, Dhaburu Magu, Male' |
Local |
STRUCTURAL AND FINISHING WORK OF 4TH FLOOR TO 9TH FLOOR AND TERRACE OF 10 STORY BUILDING AT H.ALANAASIMAAGEAAGE |
Private |
GC01 |
H. Alanaasimaage Aage |
14-Oct-20 |
15 Months |
- |
- |
187 |
ANGELIQUE INTERNTIONAL |
7th Floor, M.Sendrose, Koarukendi Magu, Male' |
Foreign |
PROVISION OF WATER SUPPLY FACILITIES IN DH.KUDAHUVADHOO,TH.GURAIDHOO, AND GA.VILLINGILI |
Government |
GC01, UC01-3 |
DH.KUDAHUVADHOO, TH.GURAIDHOO AND GA.VILLIGILLI, MALDIVES |
4-May-17 |
1277 Days |
- |
- |
188 |
FENMULI CONSTRUCTIONS PRIVATE LIMITED |
H.Shark, Mustharee Magu, Male' |
Local |
CONSTRUCTION OF 3RD, 4TH & 5TH FLOOR OF 5 STOREY BUILDING AT H.SAMAN VILLA |
Private |
GC01 |
H.Saman Villa 4 |
15-Nov-20 |
24 Months |
- |
- |
189 |
MAALAA HIGH RISING CONSTRUCTION PVT LTD |
G.Miles,Koimalaa Hingun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H.SEA SPEED |
Private |
GC01 |
H.Sea Speed |
30-Aug-20 |
20 Months |
- |
- |
190 |
MULTI SKILL COMPANY PVT LTD |
G.Finivilu, Dhomaidharaadha Higun, Male' |
Local |
CONSTRUCTION OF 5 STOREY BUILDING AT M.MOONBEENS |
Private |
GC01 |
M.Moon Beams |
5-Jan-20 |
20 Months |
- |
- |
191 |
MULTI SKILL COMPANY PVT LTD |
G.Finivilu, Dhomaidharaadha Higun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING WITH TERRACE AT H.HAMEEDHEE MANZIL |
Private |
GC01 |
H.Hameedhe Manzil |
1-Aug-20 |
2 Years |
- |
- |
192 |
SUNWORLD HOLIDAY PVT LTD |
H, Vifilaage. Janavaree Magu, Male' |
Local |
FOUNDATION WORK OF 8 STOREY BUILDING AND CONCRETE WORKS OF FIRST TWO FLOORS AT G.RAVI |
Private |
GC01 |
G.Ravi |
1-Oct-20 |
5 Months |
- |
- |
193 |
VIEW CONSTRUCTION PRIVATE LIMITED |
G.New Sharaaz, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION OF 13 STOREY BUILDING AT MA.RAAGUNDAAGE |
Private |
GC01 |
Ma.Raagundaage |
1-Jul-19 |
884 Days |
- |
- |
194 |
INNF CONSTRUCTION COMPANY PVT LTD |
G.Finivilu, Dhomaidharaadha Higun, Male' |
Local |
CONSTRUCTION OF 5-10 FLOORS WITH TERRACE AND LIFT MACHINE ROOM OF 10 STOREY BUILDING AT G.BODUGAA VILAA |
Private |
GC01 |
G.Bodugaa Villa |
1-Sep-20 |
367 Days |
- |
- |
195 |
DEPICT PRIVATE LIMITED |
H.Woodland Aage, Kaani Goalhi,Male' |
Local |
CONCRETE WORKS OF 06 STOREY BUILDING AT MA.ZELEETHAN,MALE' |
Private |
GC01 |
Ma.Zeleethan |
18-Sep-20 |
12 Months |
- |
- |
196 |
ATOLL ARCH PRIVATE LIMITED |
2nd Floor, H.Melaim, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION AND CONCRETE WORKS OF GROUND, FIRST FLOOR AND SECOND FLOOR OF 09 FLOOR BUILDING AT H.KULHITHULHAAGE |
Private |
GC01 |
H.Kulhithulhaage |
15-Jan-20 |
360 Days |
- |
- |
197 |
STANDARD & ORIGIN PRIVATE LIMITED |
5th Floor,H.Sifa, Boduthakurufaanu Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING WITH TERRACE AT MA.NIMERI |
Private |
GC01 |
Ma.Nimeri |
1-Sep-20 |
2 Years |
- |
- |
198 |
M.T HOJGAARD PRIVATE LIMITED |
5th Floor, H.filigasdhoshuge Building, Ameeru Ahmed Magu, Male' |
Local |
SURVEY, DESIGN AND HARBOUR RECONSTRUCTION OF 3 ISLANDS (B.KUDARIKILU, B.DHONFANU & B.KIHAADHOO) |
Government |
GC01 ,HC,UC |
B.Kudarikilu, B.Dhonfanu, B.Kihaadhoo |
10-Sep-22 |
365 Days |
- |
- |
199 |
WOA MALDIVES PRIVATE LIMITED |
H.Meri Side 4, Boduthakuru Faanu Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H.MAAFAAGAA |
Private |
GC01 |
H.Maafaagaa |
6-Aug-20 |
370 Days |
- |
- |
200 |
AGMA MALDIVES PTE LTD |
1st Floor, M.Green Eye, Javaahiru Magu, Male' |
Local |
CONCRETE CASTING WORKS OF 9TH FLOOR OF H.SANDHALEEGE |
Private |
GC01 |
H.Sandhaleege |
20-Oct-20 |
30Days |
- |
- |
201 |
AFAMI MALDIVES PVT LTD |
M.Lily Pool, 2nd Floor |
Local |
CONSTRUCTION OF NEW OFFICE BLOCK AT GA GEMANAFUSHI |
Private |
GC01 |
GA Gemanafushi |
2-Mar-20 |
271 Days |
- |
- |
202 |
ALITHO INVESTMENT MALDIVES PRIVATE LIMITED |
M.Love Nest, Kanba Aisa Rani Hingun,Male' |
Local |
CONCRETE AND FINISHING WORKS OF 10 STOREY BUILDING AT H.NEW SORE SHINE |
Private |
GC01 |
H.New SoreShine, Male' |
10-Apr-19 |
24 Months |
- |
- |
203 |
K.I.M GROUP PRIVATE LIMITED |
M.Fathaha,Fandiyaaru Magu,Male |
Local |
CONSTRUCTION OF SEVEN STORY BUILDING AT MA. MONTROVIA |
Private |
GC01 |
Ma. Montrovia |
10-Jan-20 |
508 Days |
- |
- |
204 |
DHIVEHI COMPANY PRIVATE LIMITED |
H. Haali, 2nd Floor, Majeedhee Magu, Male' |
Local |
CONSTRUCTION AND FINISHING WORKS OF 7 FLOORS INCLUDING FOUNDATION AT H. FEERUMURANGAMAA |
Private |
GC01 |
H. Feerumurangamaa |
1-Jan-20 |
15 Months |
- |
- |
205 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
local |
CONCRETE AND FINISHING WORKS FROM 4TH FOOR TO 10TH FLOOR OF 10 STORY BUILDING AT H. FAIYKURI |
Private |
GC01 |
H. Faiykuri |
24-Apr-19 |
1155 Days |
- |
- |
206 |
ABC CONSTRUCTION PVT LTD |
1st Floor,G.Niooranfini, Kalhuhura Magu,Male' |
local |
CONCRETE WORKS OF FOUNDATION, GROUND FLOOR AND 1ST FLOOR AT H.KAROAGE AGE. |
Private |
GC01 |
H.Karoage Aage |
20-Nov-20 |
137 days |
- |
- |
207 |
GLOBIN PRIVATE LIMITED |
H. Reethi Maakoani, Sosan Magu, Mlae' |
Local |
CONSTRUCTION WORK OF 10 STORY BUILDING AT H. SOASAN MEAD |
Private |
GC01 |
H. Soasan Mead |
15-Sep-20 |
2 Years |
- |
- |
208 |
JAAH INVESTMENTS PRIVATE LIMITED |
5th Floor, Unit202,H.Davinci, Sosun Magu, Male |
Local |
CONSTRUCTION OF 06 STOREY BUILDING AT H.NIBOOGE |
Private |
GC01 |
H.Nibooge, Male' |
27-Oct-19 |
24months |
- |
- |
209 |
E.W. CONSTRUCTION PRIVAET LIMITED |
M.Aasmaa Villa, Dhakadha Magu, Male' |
Local |
CONSTRUCTION OF 04 STORY BUILDING AT H.SUNNY PARK |
Private |
GC01 |
H.Sunny Park, Male' |
10-Nov-20 |
140 Days |
20 Days |
- |
210 |
HIKAWI CONSTRUCTION PRIVATE LIMITED |
Ground Floor, Lot 11178, Chabeylee Magu, Goalhi 06, Hulhumale' |
Local |
CONSTRUCTION OF 7 STORY BUILDING AT MA.HINNAVARU |
Private |
GC01 |
Ma.Hinnavaru |
5-Mar-20 |
12 Months |
- |
- |
211 |
CONSYNC PRIVATE LIMITED |
M. Ever Rest, 1st Floor, Javaahiru Magu, Male' |
Local |
CONCRETE AND FINISHING WORKS OF SECOND FLOOR TO NINTH FLOOR (INCLUDING TERRACE FLOOR SLAB) OF 10 FLOOR BUILDING AT AT MA. FINAA |
Private |
GC01 |
Ma. Finaa |
25-Nov-19 |
456 Days |
6 Months |
- |
212 |
ZAAN CONSTRUCTION COMPANY PVT LTD |
H. Blue Jay, First Floor, Karanka Magu, Male' |
Local |
CONSTRUCTION OF 10 STORY BUILDING AT MA. BEENA |
Private |
GC01, GC02 |
Ma. Beena |
15-Nov-20 |
18 Months |
12 Months |
- |
213 |
TRACK EARTH PRIVATE LIMITED |
3F,H.Sheereen Villa 01, Burevi Magu, Male' |
Local |
CONCRETE WORKS OF 8TH, 9TH, 10TH FLOOR AND ROOF SLAB AT H. DHENOO |
Private |
GC01 |
H. Dhenoo, Male' |
11-Oct-20 |
90 Days |
1 Year |
- |
214 |
PROPOSE CONSTRUCTION PRIVATE LIMITED |
Ground Floor, Ma.Double Eight, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 10TH FLOOR SLAB AND CONCRETE WORKS OF TERRACE WITH LIFT OF G.GARNET |
Private |
GC01 |
G.Garnet, Male' |
10-Nov-20 |
3 Months |
- |
- |
215 |
AMANAT |
V.Translvania, Kandoomaa Goalhi, Male' |
Local |
CONCRETE AND FOUNDATION WORKS OF 4 FLOORS AND FINISHING WORKS OF 2ND AND 3RD FLOOR AT M.DHIJULATH KAORU |
Private |
GC01 |
M.Dhijulath Koaru, Male' |
7-Feb-20 |
18 Months |
12 Months |
- |
216 |
3DA CONSTRUCTION PRIVATE LIMITED |
Ma.Rabeeuge, Javaahiru Magu, Male' |
Local |
CONCRETE WORKS OF 3RD AND 4TH FLOOR AND FINISHING WORKS OF GROUND TO 4TH FLOOR OF 8 STOREY BUILDING AT MA.THOONUVELI |
Private |
GC01 |
MA.Thoonuveli |
1-Oct-20 |
30 months |
- |
- |
217 |
SENOK TRADE COMBINE (PRIVATE) LIMITED |
Ma. Rangiri, Rahdhebai Magu, Male |
Local |
DESIGN AND BUILD OF HA.MOLHAHDOO HARBOUR |
Government |
HC01 |
Ha.Molhadhoo |
16-Nov-19 |
540 days |
- |
- |
218 |
VANQUISHER CONSTRUCTION COMPANY PVT LTD |
Ma. Maaranga, Dhaburu Magu, Male' |
Local |
CONCRETE WORK OF 03RD FLOOR OF 10 STORY BUILDING AT H.FARUMA |
Private |
GC01 |
H. Faruma |
21-Sep-20 |
60 days |
- |
- |
219 |
SMALL MALDIVES PVT LTD |
H.Nasmee, Bodufungandu Magu , Male' |
Local |
CONSTRUCTION WORK OF 10 STORY BUILDING AT G. NOORANGE |
Private |
GC01, GC02, OB01,OB02,OB03, OB04, OB05, OB06, OB07, OB08 |
G. Noorange |
5-Sep-19 |
2 Years |
- |
- |
220 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONCRETE AND FINISHING WORKS OF 09 STORY BUILDING AT M. AMAZON |
Private |
GC01 & GC02 |
M. Amazon |
10-Oct-20 |
16 Months |
6 Months |
- |
221 |
COLOUR IMAGE MALDIVES PRIVATE LIMITED |
G.Lamaison, Neeloafaru Magu, Male' |
Local |
CONSTRUCTION AND INTERIOR WORKS OF 5 STOREY BUILDING AT H.DHANBUMAAGE |
Private |
GC01 |
H.Dhanbumaage |
26-Nov-20 |
90 Days |
- |
- |
222 |
AIMA CONSTRUCTION COMPANY PVT LTD |
G.Aima, Banafsaa Magu, Male' |
Local |
CONSTRUCTION OF 10 STOREY RESIDENTIAL BUILDING AT G. VIOLIN |
Private |
GC01 |
G. Violin |
1-Dec-20 |
395 Days |
- |
- |
223 |
SENIOR INTERNATIONAL PRIVATE LIMITED |
1st Floor, M.Gallandhoo, Asaree Higun |
Local |
CONSTRUCTION OF A WAREHOUSE AT MA.MAARAADHAAGE,MALE' |
Private |
GC01 |
Ma.Maaraadhage |
1-Nov-16 |
06 Years |
- |
- |
224 |
L.F CONSTRUCTION PRIVATE LIMITED |
M.Fanari,Keneree Magu, Male' |
Local |
CONSTRUCTION OF 5TH TO 11TH FLOOR OF11 STOREY BUILDING AT M.NINE HOUSE |
Private |
GC01 |
M.Ninehouse |
29-Oct-20 |
42 Months |
- |
- |
225 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 12 STOREY BUILDING AT G. PYRAMIDS |
Private |
GC01 & GC02 |
G. Pyramids |
1-Nov-20 |
300 Days |
365 Days |
- |
226 |
FLEXINC CONSTRUCTION PRIVATE LIMITED |
6B. H.Fahaage, Muthee Goalhi |
local |
CONSTRUCTION OF 3RD FLOOR OF 10 FLOOR BUILDING AT H. THANBURUVILLA |
Private |
GC01 |
H. Thanburuvilla |
4-Aug-20 |
6 Months |
6 Months |
- |
227 |
METALLURGICAL CORPORATION OF CHINA LTD |
Lot 11 444 Hithigas Magu, Hulhumale, Maldives |
Foreign |
CONSTRUCTION OF SANDHURA RESIDENCES LUXURY APARTMENT COMPLEX |
Private |
GC01 |
Hulhumale' Plot S1-1, S1-2, S1-3, S1-4 |
26-Aug-18 |
1039 Days |
365 Days |
- |
228 |
W & A OVERSEAS PTE.LTD |
7th Floor,H.Fusthulhaamaage,Ameer Ahmed Magu, Male' |
Foreign |
CONSTRUCTION OF SOCIAL HOUSING 14 STOREY RESIDENTAL TOWERS HULHUMALE PHASE II NO:N3-20(D),N3-20(E) AND N3-20(F) |
Private |
GC01 |
Hulhumale',Phase II |
21-Feb-18 |
44 months |
365 Days |
- |
229 |
RENOCON PRIVATE LIMITED |
Ma. Kufraa, Kameenee Magu, Male' |
Local |
FOUNDATION OF 10 FLOORS AND CONSTRUCTION AND FINISHING WORKS OF GROUND AND FIRST FLOOR AT M. MOISHAA |
Private |
GC01, GC02, OB01,OB02,OB03, OB04, OB05, OB06, OB07, OB08, OT05 |
M. Moishaa |
30-Nov-20 |
12 Months |
1 Year |
- |
230 |
A MAN MALDIVES PVT LTD |
Ground Floor,M.Noothari, Male' |
Local |
FINISHING WORKS OF EXTENSION BUILDING AT GDH. MADAVELI HEALTH CENTER |
Government |
GC01 |
GDh. Madaveli Health Center |
1-Dec-20 |
259 Days |
12 Months |
- |
231 |
PRECISION ENGINEERING SERVICES (PRIVATE) LIMITED in JV with FLEXINC PRIVATE LIMITED |
M.Fulhafi,Gulhazaaru Goalhi,Male' |
Local |
COMPLETION OF 100 HOUSING UNITS PROJECTS AT B. THULHAADHOO |
Government |
GC01 |
B. Thulhaadhoo |
10-Jul-19 |
651 Days |
365 Days |
- |
232 |
I CONSTRUCTION PRIVATE LIMITED |
M.Nalahiya, Buruzu Magu, male' |
Local |
CONCRETE WORKS OF 10 STOREY BUILDING AT M.USA -1 |
Private |
GC01 |
M.Usa-1 |
1-Nov-20 |
250 Days |
366 Days |
- |
233 |
VELOCITY CONSTRUCTION COMPANY PRIVATE LIMITED |
4th Floor, M.Kurinbee Lodge, Izzudheen Magu, Male' |
Local |
CONCRETE STRUCTURE WORKS OF 5TH FLOOR AND ABOVE FLOORS OF 9 STOREY BUILDING AT H. VAVOI |
Private |
GC01 |
H. Vavoi |
1-Dec-20 |
365 Days |
- |
- |
234 |
VELOCITY CONSTRUCTION COMPANY PRIVATE LIMITED |
4th Floor, M.Kurinbee Lodge, Izzudheen Magu, Male' |
Local |
CONCRETE STRUCTURE WORKS OF 7TH FLOOR AND ABOVE FLOORS OF 10 STOREY BUILDING AT M. MILLET |
Private |
GC01 |
M. Milet |
1-Dec-20 |
365 Days |
- |
- |
235 |
VENZA COMPANY PRIVATE LIMITED |
1st Floor,10073 Hulhumale lot, Nirolhu Magu, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H. RASMAADHOOGE |
Private |
GC01 |
H. Rasmaadhooge |
1-Nov-20 |
520 Days |
6 Months |
- |
236 |
ALITHO CONSTRUCTION PRIVATE LIMITED |
H.New Sore Shine |
Local |
CONSTRUCTION OF 10 STOREY BUILDING WITH TERRACE FLOOR AT M.POOL COPEEGE MALE' |
Private |
GC01 |
M.Pool Copeege |
12-Dec-20 |
24 Months |
6 Months |
- |
237 |
COASTLINE INVESTMENTS PTE LTD |
M. Irufuheyge, Maaveyo Magu, Male' |
Foreign |
CONSTRUCTION OF 10 STOREY BUILDING AT H.THULUSDHOOGE |
Private |
GC01 |
B. Maamaduvari |
1-Jan-19 |
603 Days |
- |
- |
238 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 08 STOREY MIXED RESIDENTIAL BUILDING (PHASE 01) AT M. RANA PLAZA |
Private |
GC01 |
M. Rana Plaza |
1-Feb-21 |
365 Days |
364 Days |
- |
239 |
ATOLL ARCH PRIVATE LIMITED |
2nd Floor, H.Melaim, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION WORKS OF 10 STOREY BUILDING WITH CONCRETE WORKS OF 7 FLOORS AND FINISHING WORKS OF 6 FLOORS AT G. JELEENA |
Private |
GC01 |
G. Jeleena |
21-Nov-20 |
375 Days |
6 Months |
- |
240 |
OLLA PRIVATE LIMITED |
Ma.Snowlight, Rahdhebai Magu, Male' |
Local |
CONSTRUCTION OF 07 STOREY BUILDING AT G.LIGHT GREEN |
Private |
GC01 |
G. Light Green |
1-Apr-16 |
1826 Days |
- |
- |
241 |
INFINITY BUILDERS |
H.Happy Villa, Violet Magu, Male' |
Local |
CONSTRUCTION OF 12 STOREY BUILDING AT M.PISTHAAGE |
Private |
GC01, GC02 |
M.Pisthaage |
25-Nov-20 |
12 Months |
12 months |
- |
242 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H. FONIFONIMAAGE - PHASE 3 |
Private |
GC01 |
H. Fonifonimaage |
20-Dec-20 |
12 Months |
- |
- |
243 |
NALAHIYA CONSTRUCTION AND DEVELOPMENT PRIVATE LIMITED |
M.Nalahiya, Fareedhee Magu, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT M.SANGUFAREEDHUGE |
Private |
GC01 |
M.Sangufareedhuge |
30-Aug-20 |
36 Months |
12 Months |
- |
244 |
GK DEVELOPMENTS PRIVATE LIMITED |
No.42 North Phase Industrial Estate, Ekkattuthangal, Chennai -006032 |
Foreign |
DESIGN AND BUILT OF TH.THIMARAFUSHI MAJOR ROADS |
Government |
GC01&02, HC01,02,03 UC 01 |
Th.Thimarafushi |
12-Feb-20 |
290 Days |
290 Days |
- |
245 |
ATOLL ARCH PRIVATE LIMITED |
2nd Floor, H.Melaim, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION AND CONCRETE WORKS OF GROUND, FIRST FLOOR AND SECOND FLOOR OF 09 FLOOR BUILDING AT H.KULHITHULHAAGE |
Private |
GC01 |
H.Kulhithulhaage |
15-Jan-20 |
360 Days |
- |
- |
246 |
VIEW CONSTRUCTION PRIVATE LIMITED |
G.New Sharaaz, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION OF 13 STOREY BUILDING AT MA.RAAGUNDAAGE |
Private |
GC01 |
Ma.Raagundaage |
1-Jul-19 |
884 Days |
- |
- |
247 |
LAMINA PRIVATE LIMITED |
M.Wooden Park |
Local |
CONSTRUCTION OF 12 SOREY BUILDING AT M.WOODEN PARK |
Private |
GC01 |
M.Wooden Park |
20-Dec-20 |
24 Months |
1 year |
- |
248 |
SEVEN WEEKS PVT LTD |
Ma.Chilhiya Villa, Ameenee Magu, Male' |
Local |
CONCRETE WORKS OF 2/3 TERRACE SLAB OF 10 STOREY BUILDING AT G.MAKHMAAGE |
Private |
GC01 |
G. Makhmaage |
28-Dec-20 |
10 Days |
- |
- |
249 |
KANBALIFARU DEVELOPMENT PVT LTD |
M.Fehigiri ,1st Floor,Handhuvaree Higun, Male' |
local |
DEVELOPMENT OF TOURIST RESORT AT SH.KANBALIFARU |
Resort |
GC01 |
Sh. Kanbalifaru |
6-Nov-14 |
06 Years, 13 Months, 20 Days |
- |
- |
250 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
local |
CONSTRUCTION OF 07 STOREY BUILDINIG AT HULHUMALE LOT 11100 |
Private |
GC01 &GC02 |
Hulhumale Lot 11100 |
9-Apr-19 |
1034 Days |
365 Days |
- |
251 |
SANDAL MAURITIUS PVT LTD |
M.Roslin, Jambu Magu |
local |
DEVELOPMENT OF 150 HOUSING UNITS , ASSOCIATED COMMERCIAL AREAS AND 15 LUXURY VILLAS IN MALDIVES - PHASE II |
Government |
GCO1 |
D1-1 Reethigas Magu, Hulhumale Phase I |
7-Jan-21 |
27 Months |
6 Months |
- |
252 |
LANDMARK DEVELOPMENT PRIVATE LIMITED |
Lot11269, Hulhumale' Boakarumaa Hingun |
local |
CONSTRUCTION OF 06 STOREY BUILDING AT HULHUMALE LOT 11192 |
Private |
GCO1 |
Hulhumale' LOT 11192 |
1-Nov-17 |
60 Months |
180 Days |
- |
253 |
ROAD DEVELOPMENT CORPORATION LIMITED |
1st Floor,MNSL Building,Orchid Magu,Male' |
Local |
LANDSCAPE DEVELOPMENT FOR THE SOCIAL HOUSING UNITS SITE AT S. HITHADHOO |
Government |
GC01 & GC02 |
S. Hithadhoo |
11-Mar-20 |
330 Days |
365 Days |
- |
254 |
SHIRMEENA CONSTRUCTION PRIVATE LIMITED |
G. Zamaaneege, Alikaleygefaanu Magu, Male' |
Local |
CONCRETE WORKS OF 6TH,7TH AND 8TH FLOOR OF 08 FLOOR BUILDING AT G.RANGIREEGE 2 |
Private |
GC01 |
G.Rangirige 2 |
26-Nov-20 |
6 Months |
6 Months |
- |
255 |
DEL GRAND PRIVATE LIMITED |
Ground Floor,H.Del Rio, Raiyy Villa Higun |
Local |
CONSTRUCTION OF 7 STORY BUILDING WITH TARRACE AT G. UFANVEHI |
Private |
GC01 |
G. Ufanvehi |
15-Jan-21 |
690 Days |
09 Months |
- |
256 |
IDREES TRADING PRIVATE LIMITED |
H.Asfaru, Kinbigas Magu, Male' |
Local |
FOUNDATION WORKS OF 7 FLOOR BUILDING AND CONSTRUCTION WORKS OF GROUND FLOOR, FIRST FLOOR AND SECOND FLOOR AT H. MEMORY |
Private |
GC01 |
H. Memory |
1-Jan-21 |
24 Months |
36 Months |
- |
257 |
RISER PRIVATE LIMITED |
H.Melins,Gulisthaanu Goalhi,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING MA.SHAINEE |
Private |
GC01 |
Ma.Shainee |
14-Dec-20 |
24 Months |
6 months |
- |
258 |
VAALY CONSTRUCTION PRIVATE LIMITED |
5th Floor, Vaaly Villa, Majeedheemagu |
Local |
CONCRETE WORKS OF 6TH,7TH AND 8TH FLOOR OF 08 STOREY BUILDING AT H.JOINTER |
Private |
GC01 |
H.Jointer |
5-Jan-21 |
4 Months |
6 Months |
- |
259 |
RAINBOW CONSTRUCTION PRIVATE LIMITED |
G.Maraana,Alikileygefaanu magu, Male' |
Local |
CONSTRUCTION OF MINISTRY OF DEFENCE NEW BUILDING |
Government |
GC01 & GC02 |
Bandaarakoshi |
1-Jan-21 |
618 Days |
- |
- |
260 |
OAK DEVELOPMENT PVT LTD |
G.Goldfin house,halaveli goalhi, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT G.LACE |
Private |
GC01 |
G.Lace |
1-Jan-18 |
36 Months |
12 Months |
- |
261 |
BAA INVESTMENT PRIVATE LIMITED |
Ma. Naheedhee Manzil, Badifasgandu Magu, Male' |
Local |
SUPPLY AND INSTALLATION OF 4 TELECOMMUNICATION TOWERS IN HULHUMALE', PHASE II |
Government |
GC01 & GC02 |
Hulhumale', Phase II |
3-Jan-21 |
80 Days |
12 Months |
- |
262 |
L.F CONSTRUCTION PRIVATE LIMITED |
M.Fanari,Keneree Magu, Male' |
Local |
EXTENSION AND RENNOVATION WORKS OF R. UNGOOFAARU REGIONAL HOSPITAL DENTIAL DEPARTMENT |
Government |
GC01 |
R. Ungoofaaru Regional Hospital Dental Deartment |
20-Dec-20 |
74 Days |
6 Months |
- |
263 |
NEW CONSTRUCTION PVT LTD |
Ma. Maafolheyge, Nikagas Magu, Male' |
Local |
CONSTRUCTION OF 7 STOREY BUILDING AT MA. CHAMBEYLEE AAGE |
Private |
GC01 |
Ma. Chabeylee Aage |
1-Mar-20 |
504 Days |
365 Days |
- |
264 |
TLT CONSTRUCTION PRIVATE LIMITED |
M.Beach Flat, Sabudheli Magu, Male' |
Local |
CONCRETE WORKS OF 4 FLOORS 10 STOREY BUILDING AT MA.SENAKA |
Private |
GC01 |
Ma.Senaka |
3-Jan-21 |
6 Months |
- |
- |
265 |
SUN CONSTRUCTION AND ENGINEERING PVT LTD |
H.Sun Siyam Building,Boduthakurufaanu Magu,Male' |
Local |
CONSTRUCTION OF 102 ROOMS AND OTHER SUPPORT STRUCTURES AT OLHUVELI BEACH AND SPA MALDIVES PHASE 4 (ROMANCE ISLAND) |
Private |
GC01 |
Romance Island, Sun Siyam Olhuveli Maldives (K.Olhuveli) |
1-Jun-19 |
2 Year 29 days |
12 Months |
- |
266 |
VANQUISHER CONSTRUCTION COMPANY PVT LTD |
Ma.Maaranga,Dhanburu Magu, Male'. |
Local |
CONCRETE AND FINISHING WORKS OF 4TH AND 5TH FLOOR OF 8 STOREY BUILDING AT M. RAALHUVELI |
Private |
GC01 |
M.Raalhuveli |
9-Dec-20 |
6 months |
- |
- |
267 |
SHANGHAI CONSTRUCTION GROUP CO.,LTD |
No.33, Fushan Road, China (shanghai) Pilot Trade Zone, China |
Local |
CHINA -AID RENOVATION PROJECT OF MALDIVES MINISTRY OF FOREIGN AFFAIRS BUILDING |
Private |
GC01 |
Ministry of Foreign Affairs |
30-Jun-19 |
565 days |
- |
- |
268 |
PROPOSE CONSTRUCTION PRIVATE LIMITED |
Ground Floor, Ma.Double Eight, Buruzu Magu,Male' |
Local |
FOUNDATION AND CONCRETE WORKS OF THE FIRST 2 FLOORS OF 6 AT HULHUMALE LOT 10351 |
Private |
GC01 |
Hulhumale lot 10351 |
10-Jan-21 |
105 Days |
30 Days |
- |
269 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION AND COMPLETION OF 15 STOREY BUILDING AT MA.ALIDHOOGE |
Private |
GC01 |
Ma. Alidhooge, Male' |
15-Jul-20 |
12 Months |
- |
- |
270 |
I.N.A MALDIVES PVT LTD |
H.Venus, Vaijehey Magu, Male' |
Local |
CONSTRUCTION OF 3 STOREY BUILDING AT SUBSTATION 51 |
Government |
GC01 &GC02 |
Substation 51 (Majeedhee Magu- Sosun Magu Corner) |
12-Oct-20 |
90 days |
12 Months |
- |
271 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 11 STOREY BUILDING AT H.SP VILLA- (PHASE 2) |
Private |
GC01 &GC02 |
H.SP Villa |
7-Jan-21 |
159 Days |
365 Days |
- |
272 |
GSK & CO PRIVATE LIMITED |
H.Sunny Way, Filigas Magu, Male' |
Local |
CONSTRUCTION OF 10 STORY BUILDING AT M. SAAFUVESHI |
Private |
GC01 |
M. Saafuveshi |
23-Nov-20 |
3 Years |
6 Months |
- |
273 |
FUTUREHOME PRIVATE LIMITED |
M.Raula, Male' |
Local |
CONCRETE AND FINSHING WORKS OF GROUND, FIRST, SECOND AND THIRD FLOOT AT G.MIRZAN |
Private |
GC01 |
G.Mirzan |
1-Jan-21 |
24 Months |
- |
- |
274 |
SEVEN WEEKS PVT LTD |
Ma.Chilhiya Villa, Ameenee Magu, Male' |
Local |
FOUNDATION WORKS OF 10 STOREY BUILDING, CONCRETE WORKS OF FIRST 3 SLABS AND CONSTRUCTION OF FIRST TWO FLOORS AT M.FIG |
Private |
GC01 |
M.Fig |
1-Nov-2020 |
7 months |
- |
- |
275 |
MILLION TRADING & CONTRACTING COMPANY PRIVATE LIMITED |
G.Mugoo, Kashimaa Higun, |
Local |
CONSTRUCTION OF 11 STOREY BUILDING AT H.NOORANMAAGE |
Private |
GC01 |
H.Nooranmaage |
20-Dec-20 |
24 months |
- |
- |
276 |
ALIA CONSTRUCTION PVT LTD |
3th Floor,M. Alia Building, Gandha koalhi Magu, Male'
|
Local |
CONSTRUCTION OF A 6 STORY BUILDING WITH TERRACE AT LOT NO:10053, HULHUMALE" |
Private |
GC01 |
Lot no: 10053 - Hulhumale' |
14-Jul-19 |
901 days |
365 days |
- |
277 |
ATOLL ARCH PRIVATE LIMITED |
2nd Floor, H.Melaim, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION, CONCRETE WORKS AND FINISHING WORKS OF 11 STOREY BUILDING AT G.DHUGETHI |
Private |
GC01 |
G.Dhugethi |
6-Dec-20 |
42 months |
- |
- |
278 |
TLT CONSTRUCTION PRIVATE LIMITED |
M.Beach Flat, Sabudheli Magu, Male' |
Local |
CONCRETE AND FINISHING WORKS OF 1st , 2nd, 3rd, 4th AND TERRACE FLOOR AT M.GULROOMGE |
Private |
GC01 |
M.Gulroomge |
25-Dec-20 |
12 months |
- |
- |
279 |
MAZIYA SERVICES PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
CONSTRUCTION OF 9TH AND 10TH FLOORS AT M.BANANA LEAF |
Private |
GC01 |
M.Banana Leaf, Male' |
10-Jan-21 |
7 Months |
- |
- |
280 |
ARISCO MALDIVES PVT LTD |
M.Starynight, Sameemeemagu,Male' |
Local |
CONSTRUCTION OF 6 STOREY BUILDING AND TERRACE AT HULHUMALE PLOT 10374 |
Private |
GC01 |
Hulhumale PLot 10374 |
1-Dec-20 |
360 Days |
- |
- |
281 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
FOUNDATION WORKS, CONSTRUCTION OF GROUND AND FIRST FLOOR AND CONCERETE WORKS OF SECOND FLOOR OF 10 STOREY BULDING AT H.KUDARIKILU AAGE |
Private |
GC01 |
H.Kudarikiluge Aage |
1-Jan-21 |
8 Months |
12 Months |
- |
282 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONCRETE WORKS ON 3RD, 4TH AND 5TH FLOOR, FINISHING WORKS ON 3RD FLOOR, CONSTRUCTION OF OUTERWALLS AND CEMENT WORKS ON 4TH AND 5TH FLOOR OF M. SHAMROCK |
Private |
GC01 |
M. Shamrock |
12-Dec-20 |
5 Months |
- |
- |
283 |
SILVER RAYS PRIVATE LIMITED |
M.Lavrest, Kanbaaaishaa Rani Hingun,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H.FURAMMA |
Private |
GC01 |
H.Furamma |
17-Jan-21 |
18 Months |
6 Months |
- |
284 |
K.I.M GROUP PRIVATE LIMITED
|
M.Fathaha,Fandiyaaru Magu,Male |
Local |
CONSTRUCTION OF FOUNDATION, GROUND, FIRST AND SECOND FLOOR STRUCTURE OF 10 STOREY BUILDING AT H.DHANBUFIYA |
Private |
GC01 & GC02 |
H.Dhanbufiya |
7-Feb-21 |
17 Months |
3 Months |
- |
285 |
AWASMAGU CONSTRUCTION PRIVATE LIMITED |
M.Alakaa, Handhuvaree Hingun, Male' |
Local |
CONCRETE WORKS OF 4TH TO 11TH FLOOR OF 11 STORY BUILDING AT M. LOOVER |
Private |
GC01 |
M. Loover |
1-Dec-21 |
210 Days |
- |
- |
286 |
BALOA PRIVATE LIMITED |
Hulhumale' Lot 10568, Handhuvaree Hingun, Hulhumale' |
Local |
CONSTRUCTION OF 06 STOREY BUILDING WITH TARRACE AT HULHUMALE' LOT 11199 -PHASE 2. |
Private |
GC01 |
Hulhumale' Lot 11199 |
15-Jan-21 |
14 months |
- |
- |
287 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
CONSRUCTION OF 10 STOREY BUILDING - MA.HITHTHALAGE (Renewal) |
Private |
GC01 &GC02 |
Ma.Hiththalage Male' |
7-Dec-20 |
12 months and 24 days |
12 months |
- |
288 |
ZHONGTIAN CONSTRUCTION GROUP CO. LTD |
2b,H.Finiunimaage,Sosun Magu,Male' |
Local |
PROPOSED NASANDHURA HOTEL AND APARTMENT COMPLEX (Renewal) |
Private |
GC01 |
Nasandhura Project Site Office, Male' |
31-Mar-16 |
65 months |
- |
- |
289 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION AND COMPLETION OF 15 STOREY BUILDING AT MA.ALIDHOOGE (Renewal) |
Private |
GC01 |
Ma. Alidhooge, Male' |
15-Jul-20 |
534 days |
12 months |
- |
290 |
LITUS CONSTRUCTION PRIVATE LIMITED |
3rd Floor M. Faaroshige, Orchid Magu, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT M.LOVELY GARDEN |
Private |
Gc01 |
M.Lovely Garden |
10-Nov-20 |
24 Months |
- |
- |
291 |
LITUS CONSTRUCTION PRIVATE LIMITED |
3rd Floor M. Faaroshige, Orchid Magu, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT MA.KURIBEEGE |
Private |
GC01 |
Ma.Kuribeege |
15-Nov-20 |
24 Months |
12 Months |
- |
292 |
CHINA COMMUNICATIONS CONSTRUCTION COMPANY PRIVATE LIMITED |
6th Floor, H.Orchid, Ameer Ahamed Magu, Male' |
Foreign |
CONCRETE AND FINISHING WORKS OF FLOORS 1ST TO 5TH OF 5 STOREY BUILDING AT M.GULROOGE |
Resort |
GC01 |
N. Dhigurah |
30-Jan-16 |
1923 Days |
12 Months |
- |
293 |
CHINA STATE CONSTRUCTION MALDIVES PRIVATE LIMITED |
6th Floor, H.Aage, Boduthakurufaanu Magu, Male' |
Foreign |
CONSTRUCTION OF CHANNEL BETWEEN HULHUMALE PHASE I AND II |
Government |
GC01 |
Hulhumale Phase II |
1-Jan-20 |
762 Days |
12 Months |
- |
294 |
TRUSTENG MALDIVES PRIVATE LIMITED |
Lot10541,Filigas Magu,Male |
Local |
CONSTRUCTION 6 STOREY BUILDING AT HULHUMALE' LOT 11260 |
Private |
GC01 |
Hulhumale' Lot 11260 |
5-Jan-21 |
12 months |
- |
- |
295 |
DEPICT PRIVATE LIMITED |
H.Woodland Aage, Kaani Goalhi,Male' |
Local |
CONSTRUCTION OF SEVENTH FLOOR OF 10 STOREY BUILDING AT H.PAAYAL |
Private |
GC01 |
H.Paayal |
4-Jan-21 |
55 Days |
- |
- |
296 |
VASHUGIRI PRIVATE LIMITED |
M.Anchorage,1 floor,Shaheed Ali hingun,Male' |
Local |
DEVELOPMENT OF V. VASHUGIRI ISLAND RESORT (Renewal) |
Resort |
GC01 |
V. Vashugiri |
19-Aug-15 |
2052 Days |
44287 |
- |
297 |
ALIA CONSTRUCTION PVT LTD |
3th Floor,M. Alia Building, Gandha koalhi Magu, Maldives |
Local |
DESIGN DEVELOPMENT, IMPLEMENTATION OF CUSTOM DESIGNED PRE-FAB/PRE-CAST SYSTEMS, CONSTRUCTION, COMPLETION, TESTING COMMISSIONING AND MAINTANENCE OF PILING WORKS, JETTIES, GUEST VILLAS AND STANDARD ROOMS INCLUDING MEP WORKS AT AVANI FARES, BAA. ATOLL |
Private |
GC01 |
Fares Island B.Atoll |
14-Oct-19 |
1009 days |
2 Years |
- |
298 |
JAUSA RESORTS & INFRASTRUCTURE CONSTRUCTION PRIVATE LIMITED |
M. Reena, Carnation Magu, Male', Republic of Maldives |
Local |
HARDSCAPE WORKS AT M. MADIFUSHI |
Resort |
GC02 |
M. Madifushi |
10-Jan-21 |
4 Months |
12 Months |
- |
299 |
AXEN PARTNERS |
Ma.Ameenee Villa,Ameenee Magu,Male' |
Local |
CONSTRUCTION AND FINISHING WORK OF MA.AMEENEE VILLA 10 STOREY BUILDING |
Private |
GC01 |
Ma.Ameenee Villa |
7-Jan-21 |
36 months |
- |
- |
300 |
B BUILDERS PRIVATE LIMITED |
2nd Floor, H.Hani Dhoadhi, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION OF 5,6,7,8,9TH FLOORS AND TERRACE OF 10 STOREY BUILDING AT H.OASIS LODGE |
Private |
GC01 & GC02 |
H.Oasis Lodge |
12-Sep-19 |
1209 Days |
12 Months |
- |
301 |
TAG CONSTRUCTION & SUPPLY PRIVATE LIMITED |
Block 6, Hulhumale Ferry Terminal, Boduthakurufaanu Magu, Male' |
Local |
SLAB WORKS OF 2ND & 3RD FLOOR OF H.MARATHON |
Private |
GC01 |
H.Marathon |
20-Jan-21 |
132 Days |
- |
- |
302 |
NUGA CONSTRUCTION COMPANY PRIVATE LIMITED |
Dharuma, Havitha Magu, Hoadhandu, Fuvahmulah City |
Local |
CONCRETE AND FINISHING WORKS OF 4TH AND 5TH FLOOR AT M.ASURUKURI |
Private |
GC01 |
M.Asurukuri |
9-Jan-21 |
100 Days |
- |
- |
303 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION OF 6 STOREY BUILDING AT MA. ENDHERIAAGE |
Private |
GC01 |
Ma. Endheriaage |
31-Jan-21 |
11 Months |
- |
- |
304 |
RENOCON PRIVATE LIMITED |
Ma. Kufraa, Kameenee Magu, Male' |
Local |
CONSTRUCTION OF 06 STOREY BUILDING (WITH TARRACE) AT M.HONEY VILLA |
Private |
GC01, GC02 |
M. Honey Villa |
1-Dec-20 |
8 Months |
8 Months |
- |
305 |
APOLLO HOLDING PVT LTD |
2nd Floor, M.Marine Villa, Varudhee Higun, |
Local |
CONSTRUCTION OF 13 FLOOR BUILDING AT H.SADY SIDE |
Private |
GC01 |
H. Shady Side |
5-Aug-19 |
42 Months |
12 Months |
- |
306 |
ALIA CONSTRUCTION PVT LTD |
3th Floor,M. Alia Building, Gandha koalhi Magu, Male |
Local |
CONSTRUCTION OF EXTENTION BUILDING AT R.UNGOOFAARU REGIONAL HOSPITAL |
Government |
GC01 |
R.Ungoofaaru Hospital |
27-Jan-21 |
240 Days |
365 Days |
- |
307 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION AND FINISHING WOPRKS OF 11 STOREY MIXED- UES BUILDING AT M. OCEANIC VILLA |
Private |
GC01 |
M. Oceanic Villa |
11-Jan-21 |
10 Months |
- |
- |
308 |
SADHAN MART |
Dhuveli,Finimagu,Hdh.Nolhivaran |
Local |
CONSTRUCTION OF TWO STOREY BUILDING AT VINARES, H.DH.NOLHIVARAM |
Private |
GC01 |
Vinares, H.Dh.Nolhivaram |
1-Dec-20 |
365 Days |
- |
- |
309 |
INTER OCEAN PTE LTD |
M.Roselin, Jambu Magu, Male' |
Local |
REPAIRING DAMAGED BEAMS OF 32 VILLAS AT TAJ CORAL RESORT & SPA |
Private |
GC01 |
TAJ CORAL REEF RESORT&SPA |
5-Sep-19 |
849 days |
- |
- |
310 |
AMIN CONSTRUCTION PRIVATE LIMITED |
2nd Floor,M.World Dream, Handhuvaree Hingun, Male' |
Local |
CONSTRUCTION OF S'ALAAH'UDHDHEEN SCHOOL AT HULHUMALE PHASE II |
Private |
GC01 |
Ministry of Education |
7-Feb-21 |
390 Days |
365 Days |
- |
311 |
AYYABEY PARTNERS |
Vaijeheyge, Izzudheen Magu, Dh.Kudahuvadhoo |
Local |
CONSTRUCTION FROM 1ST FLOOR TO 5TH FLOOR AND TERRANCE ROOM AT MA. NEW HEART |
Private |
GC01 |
Ma. New Heart |
13-Dec-20 |
1 Year |
- |
- |
312 |
HUNAN NO.6 ENGINEERING CO.LTD |
Hulhumale Row House No:16/7, No:05 Goalhi, Hithigas Magu, Male' |
Foreign |
DESIGN AND BUILD OF HULHUMALE' OFFICE BUILDING ON E.P.C TURNKEY BASIS |
Government |
GC01, GC02 |
K.Hulhumale' |
13-Feb-20 |
365 days |
- |
- |
313 |
SENOK TRADE COMBINE (PRIVATE) LIMITED |
Ma. Rangiri, Rahdhebai Magu, Male' |
Foreign |
ESTABLISHMENT OF FLOOD MITIGATION MEASURES AT G.DH.THINADHOO |
Government |
HC01, UC01 |
G.Dh.Thinadhoo |
2-Nov-20 |
393 Days |
365 Days |
- |
314 |
PEARL ATOLL PRIVATE LIMITED |
1 floor, Bulding 3.5, Feydhoo Finolhu Island |
Foreign |
K. FEYDHOO FINOLHU RESORT DEVELOPMENT |
Resort |
GC01,GC02 |
K.Feydhoo Finolhu |
10-Feb-18 |
1642 Days |
- |
- |
315 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION, CONSTRUCTION AND FINISHING WORKS OF 10 STOREY BUILDING AT MA.GOGALI |
Private |
GC01 & GC02 |
Ma. Gongali |
1-Jan-20 |
730 Days |
- |
- |
316 |
DOMUS PVT LTD |
M. Rosyside, Janbumagu, Male' |
Local |
FOUNDATION WORKS, CONCRETE WORKS AND CONSTRUCTION FROM GROUND FLOOR TO 4TH FLOOR WITH TERRANCE AT H. ZINC |
Private |
GC01, GC02 |
H. Zinc |
1-Feb-21 |
248 Days |
- |
- |
317 |
JAZEERA BUILDERS PRIVATE LIMITED |
G, Javaahirumaage Aage, Kalhu Huraa Magu, Male' |
Local |
CONCRETE WORKS FROM 6TH FLOOR TO 10TH FLOOR OF 10 STOREY BUILDING AT M.FLAMINGO |
Private |
GC01 |
M.Flamingo |
8-Feb-21 |
24 Months |
- |
- |
318 |
CAD CONSTRUCTION |
2nd floor,M.Shuraamanzil, Fareedhee Magu, |
Local |
CONSTRUCTION WORK OF 4TH TO 7TH FLOOR OF 10 STOREY BUILDING AT MA. NASEEB |
Private |
GC01, GC02 |
Ma. Naseeb |
2-Sep-19 |
12 Months |
06 Months |
- |
319 |
AIDIA |
Orchid Maage, V.Felidhoo |
Local |
CONSTRUCTION OF 3 STOREY BUILDING AT RIVARIN, VAAVU FELIDHOO |
Private |
GC01 |
Rivarin, Vaavu Fulidhoo |
1-Apr-21 |
24 Months |
- |
- |
320 |
ECONMARK TRADING PVT LTD |
M.Ruvaakuri, Izzudin magu, Male' |
Local |
CONCERETE WORKS OF 4TH FLOOR AT M.AIRISAS |
Private |
GC01 |
M.Airisas |
15-Feb-21 |
1 Month |
- |
- |
321 |
CHINA HARBOUR ENGINEERING COMPANY LTD |
6th Floor, H.Orchid, Ameer Ahmed Magu, Male' |
Local |
CONSTRUCTION OF MOSQUE AT B.EYDHAFUSHI |
Private |
GC01 |
B.Eydhafushi |
14-Feb-21 |
18 Months |
12 months |
- |
322 |
NORTH WEST MALDIVES PRIVATE LIMITED |
Ma.Fas Eri, Male |
Foreign |
THE EXPANSION OF VELANA INTERNATIONAL AIRPORT (VIA), MALDIVES |
Government |
GC01 |
Velana International Airport |
7-Aug-19 |
1023 Days |
18 Months |
- |
323 |
TRUSTENG MALDIVES PRIVATE LIMITED |
Lot10541,Filigas Magu,Male |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT M. HAVEEREE UFAA |
Private |
GC01 & GC02 |
M. Haveeree Ufaa |
1-Feb-21 |
12 Months |
12 Months |
- |
324 |
AFAMI MALDIVES PRIVATE LIMITED |
M.Lilly Pool, 2nd Floor |
Local |
CONSTRUCTION OF OFFICE BLOCK AT GDH. GADHOO SCHOOL |
Government |
GC01 |
GDH. GADHOO SCHOOL |
5-Jan-21 |
240 Days |
365 Days |
- |
325 |
ABC CONSTRUCTION PVT LTD |
1st Floor,G.Niooranfini, Kalhuhura Magu,Male' |
Local |
CONSTRUCTION WORKS OF 5TH TO TERRACE FLOOR OF 10 STOREY BUILDING AT H.SELEENA |
Private |
GC01 |
H.Seleena |
1-Dec-20 |
212 Days |
- |
- |
326 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION OF 5 STOREY BUILDING (GO- DOWN) AT LOT 10264 |
Private |
GC01 |
Lot 10264, Hulhumale' |
15-Mar-21 |
8 Months |
12 Months |
- |
327 |
ALTEC MALDIVES PRIVATE LIMITED |
H.Alihuras, Lonuziyaarai Magu, Male' |
Local |
CONSTRUCTION OF WATER SUPPLY AND SEWERAGE FACILITIES IN K.GULHI |
Government |
GC01 |
K.Gulhi |
29-Sep-19 |
24 Months |
365 Days |
- |
328 |
ROTIME ENGINEERING AND TECHNOLOGY CO.LTD |
RM 1501(669), FSPACTR 53-55, Wanchai Lockatrd, Hong Kong |
Local |
CONSTRUCTION OF 02 BUILDING TOWERS OF STELCO HIYA PROJECT- HULHUMALE' PHASE 2 |
Government |
GC01 |
Hulhumale',Phase II |
1-Feb-18 |
1307 Days |
- |
- |
329 |
HINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED |
6th Floor H.Aage' |
Local |
CONSTRUCTION OF 7000 HOUSING UNITS AT HULHUMALE PHASE II |
Government |
GC01 |
Hulhumale Phase II |
19-Dec-17 |
1289 Days |
338 Days |
- |
330 |
DOMUS PVT LTD |
M. Rosyside, Janbumagu, Male' |
Local |
CONSTRUCTION WORKS OF GROUND AND FIRST FLOOR OF THE 10 STOREY BUILDING AT M. ALIGAA |
Private |
GC01, GC02 |
M. Aligaa |
2-Feb-21 |
5 Months |
- |
- |
331 |
IDEALESTATE PRIVATE LIMITED |
Kimbimaage,Raiyvilla Magu, Male' |
Local |
CONSTRUCTION OF VECHICLE SECURITY CHECK POST AT VELANA INTERNATIONAL AIRPORT |
Government |
GC01 |
Velana International Airport |
10-Feb-20 |
573 Days |
365 Days |
- |
332 |
VASHUGIRI PRIVATE LIMITED |
M.Anchorage,1 floor,Shaheed Ali hingun,Male' |
Local |
DEVELOPMENT OF V. VASHUGIRI ISLAND RESORT |
Resort |
GC01 |
Vashugiri, Vaavu Atoll |
19-Aug-15 |
2143 Days |
- |
- |
333 |
SEAGULL GROUP PRIVATE LIMITED |
M. Narugis, Chaandhanee Magu, Male', Maldives |
Local |
CONSTRUCTION OF ADH.INNAFUSHI RESORT |
Resort |
GC01 |
Adh. Innafushi |
30-Mar-23 |
1424 Days |
24 months |
- |
334 |
TRUSTENG MALDIVES PRIVATE LIMITED |
Lot10541,Filigas Magu,Male |
Local |
DESIGN AND BUILT OF PROPOSED 5 STOREY COMMERCIAL BUILDING AT HULHUMALE LOT 11621 |
Private |
GC01 |
Hulhumale Lot 11621 |
15-Feb-21 |
12 Months |
12 Months |
- |
335 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
CONCRETE AND FINISHING WORKS OF 07 FLOORS OF THE 10 FLOOR BUILDING AT MA. FAVOURITE |
Private |
GC01 & GC02 |
Ma. Favourite |
15-Mar-21 |
24 Months |
12 Months |
- |
336 |
SEVEN WEEKS PVT LTD |
Ma.Chilhiya Villa, Ameenee Magu, Male' |
Local |
FOUNDATION WORKS AND CONCERETE WORKS OF 04 FLOORS OF THE 10 STOREY BUILDING AT M.LUCK |
Private |
GC01 |
M.Luck |
1-Mar-21 |
9 Months |
- |
- |
337 |
CHINA HARBOUR ENGINEERING COMPANY LTD |
6th Floor, H.Orchid, Ameer Ahmed Magu, Male' |
Local |
THE EXPANSION OF VELANA INTERNATIONAL AIRPORT (VIA), MALDIVES |
Government |
GC01 & GC02 |
Velana International Airport |
7-Aug-19 |
1023 Days |
18 Months |
- |
338 |
INNF CONSTRUCTION COMPANY PVT LTD |
G.Finivilu, Dhomaidharaadha Higun, Male' |
Local |
CONSTRUCTION OF 6TH FLOOR, 7TH FLOOR, 8TH FLOOR, 9TH FLOOR AND 10TH FLOOR OF 10 STOREY BUILDING AT G. NELIVARUAAGE |
Private |
GC01 |
G. Nelivaruaage |
10-Jan-21 |
300 Days |
365 Days |
- |
339 |
ALTEC MALDIVES PRIVATE LIMITED |
H.Alihuras, Lonuziyaarai Magu, Male' |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY AND SEWERAGE FACILITIE IN F. MAGOODHOO |
Government |
GC01 |
F. Magoodhoo |
29-Sep-19 |
24 Months |
365 Days |
- |
340 |
FLEXINC PRIVATE LIMITED |
6B. H.Fahaage, Muthee Goalh |
Local |
DESIGN AND BUILD OF PROVISION OF WATER SUPPLY AND SEWERAGE FACILITIES IN HA.MOLHADHOO |
Government |
UC01 |
Ha.Molhadhoo |
28-Feb-21 |
780 Days |
365 Days |
- |
341 |
W CONSTRUCTION COMPANY PRIVATE LIMITED |
3rd Floor, H.Sheesha Vehi, Muthee Goalhi,Male' |
Local |
CONCRETE AND FINISHING WORK OF GROUND, FIRST AND SECOND FLOOR OF 10 STORE BULDING AT G. MAAVAS |
Private |
GC01 |
G.Maavas, K.Male' |
10-Feb-21 |
9 Months |
6 Months |
- |
342 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT G.RANGIREEGE,MALE |
Private |
GC01 |
G.Rangireege |
13-May-19 |
1297 Days |
365 Days |
- |
343 |
CT AT THILAMAFUSHI |
4th Floor, Asters Building , Ameer Ahmed Magu, Male |
Foreign |
DEVELOPMENT OF A RESORT AT THILAMAFUSHI |
Government |
GC01 |
Lh.Thilamafushi |
15-Nov-18 |
958 Days |
6 Months |
- |
344 |
SUN WORLD HOLIDAYS PVT LTD |
H, Vifilaage. Janavaree Magu, Male' |
Local |
FOUNDATION AND CONCRETE WORKS OF 2 FLOORS OF THE 10 STOREY BUILDING AT M.HIRUNDHUMNAAGE |
Private |
GC01 |
M.Hirudhumaage |
31-Mar-21 |
5 Months |
12 Months |
- |
345 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
FOUNDATION AND CONCRETE WORKS OF GROUND TO 4TH FLOOR OF THE 10 FLOOR BUILDING AT MA.ENZO |
Private |
GC01 |
Ma.Enzo |
1-Feb-21 |
11 Months |
- |
- |
346 |
FLEXINC PRIVATE LIMITED |
1st Floor(B), H.Mauwi, Block no: 20, Lansimoo Goalhi, Male' |
Local |
DESIGN AND BUILD OF PROVISION OF WATER SUPPLY AND SEWERAGE FACILITIES IN M.VEYVAH - LOT 5 |
Government |
UC01 |
M.Veyvah |
28-Feb-21 |
780 Days |
12 Months |
- |
347 |
RENOCON PRIVATE LIMITED |
Ma. Kufraa, Kameenee Magu, Male' |
Local |
CONCRETE AND CONSTRUCTION WORK OF SECOND, THIRD AND FORTH FLOOR OF 11 STOREY BUILDING AT H. DHIGGAMAAGE AAGE |
Private |
GC01 |
H. Dhiggamaage Aage |
19-Mar-21 |
07 Months |
3 Months |
- |
348 |
ROAD DEVELOPMENT CORPORATION LIMITED |
1st Floor,MNSL Building,Orchid Magu,Male' |
Local |
DESIGN AND BUILD OF HDH. KULHUDUFFUSHI MAJOR ROADS PHASE 02 |
Government |
GC01 & GC02 |
Hdh. Kulhuduffushi |
25-Feb-21 |
510 Days |
365 Days |
- |
349 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION WORK OF CHSE A BLOCK AT HULHUMALE PHASE 2 |
Government |
GC01 |
Hulhumale Phase II |
23-Dec-20 |
14 Months |
- |
- |
350 |
ZAAN CONSTRUCTION COMPANY PVT LTD |
H. Blue Jay, First Floor, Karanka Magu, Male' |
Local |
CONSTRUCTION OF 8 STOREY BUILDING AT M.LIGHT BLUE, MALE' MALDIVES |
Private |
GC01 |
Male' |
1-Mar-19 |
33 Months |
6 Months |
- |
351 |
SAS E CONSTRUCTION PRIVATE LIMITED |
1st Floor,M.Ebage, Irumaa Magu,Male' |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY FACILITIES IN DH.HULHUDHELI- LOT 10 |
Government |
UC01 |
Dh.Hulhudheli |
18-Mar-21 |
600 Days |
365 Days |
- |
352 |
SJ CONSTRUCTION PRIVATE LIMITED IN JV WITHNORTH COAST CONTRACTORS PRIVATE LIMITED |
H.Fusthulaamaage, Ameeru Ahmed Magu,Male' |
Local |
LABOUR CONTRACT WORKS OF PROVISION OF SEWERAGE FACILITIES IN HA.BAARAH |
Government |
UC01 |
Ha.Baarah |
2-Mar-18 |
1440 Days |
- |
- |
353 |
TLT CONSTRUCTION PRIVATE LIMITED |
M.Beach Flat, Sabudheli Magu, Male' |
Local |
CONCERETE WORKS OF TWO STOREY BUILDING AT M.MALFIYA |
Private |
GC01 |
M.Malfiya |
15-Apr-21 |
5 Months |
- |
- |
354 |
ALITHO CONSTRUCTION PRIVATE LIMITED |
H. New Shore Shine |
Local |
CONSTRUCTION OF 10 STOREY BUILDING WITH TERRACE AT H. OCEAN GREEN |
Private |
GC01 |
H. Ocean Green |
27-Mar-21 |
18 Months |
12 Months |
- |
355 |
CHINA MACHINERY ENGINEERING CORPORATION |
8th Floor,H.Suez,Ameer Ahmed Magu,Male' |
Foreign |
DESIGN AND CONSTRUCTION OF ELECTRICITY SYSTEM AND OPEN ACCESS NETWORK OF HULHUMALE PHASE 2 |
Government |
UC01 |
Hulhumale Phase II |
18-Jan-21 |
510 Days |
365 Days |
- |
356 |
IMA GROUP PRIVATE LIMITED |
1st Floor, M.Blue Sea,Kanbaaisha Ranihingun,Male' |
Local |
CONSTRUCTION OF ADDITIONAL FLOOR (9TH FLOOR), CONCRETE WORKS OF 8TH FLOOR, GARBAGE AREA AND PARKING, LIFT INSTALLATION, FINISING WORKS AT M.BLUE SEA |
Private |
GC01&GC02 |
M. Blue Sea |
1-Apr-20 |
1004 Days |
- |
- |
357 |
L.F CONSTRUCTION PRIVATE LIMITED |
M.Fanari,Keneree Magu, Male' |
Local |
CONSTRUCTION OF GA.KANDUHULHUDHOO NEW OFFICE BUILDING AND BOUNDARY WALL AT GA KANDUHULHUDHOO |
Government |
GC01 |
Ga.Kanduhulhudhoo |
13-Apr-21 |
180 Days |
365 Days |
- |
358 |
CHAMPALARS HOLDINGS PRIVATE LIMITED |
4th Floor, M.Champa Building, Kandi Donmaniku Goalhi, Male' |
Foreign |
CONSTRUCTION OF TOURIST RESORT AT LH.DHERUFFINOLHU |
Resort |
GC01 & GC02 |
Lh.Dheruffinolhu |
24-Jul-14 |
2719 Days |
- |
- |
359 |
MICRON PRIVATE LIMITED |
M.Nice Dream, Kanbaa Aisa Rani Hingun, Male' |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY FACILITIES IN R.RASMAADHOO - LOT 15 |
Government |
UC01 |
R.Rasmaadhoo |
18-Mar-21 |
19 Months |
365 Days |
- |
360 |
B BUILDERS PRIVATE LIMITED |
2nd Floor, H.Hani Dhoadhi, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION AND CONSTRUCTION WORKS OF 5 FLOORS AND TERRACE OF THE 5 STOREY BUILDING AT G.GOALHITHEREYGE |
Private |
GC01 |
G.Goalhithereyge |
1-Apr-21 |
12 Months |
12 Months |
- |
361 |
HIMAA INTERIORS PRIVATE LIMITED |
H.Rihithalhaage, Janavaree Magu, Male' |
Local |
CONSTRUCTION OF SINGLE BUILDING AT HILL CREST , S. HULHUDHOO, ADDU CITY |
Private |
GC01 |
Hill Crest , S.Hulhudhoo |
1-Jan-21 |
120 Days |
2 years |
- |
362 |
ASIA ESTATE PVT LTD |
H.Omadhoo Fannu, Haveereee Higun , K.Male |
Local |
CONSTRUCTION OF 04TH SLAB OF THE 10 SOREY BUILDING AT MA.WHITE VIEW |
Private |
GC01 & GC02 |
Ma. White View |
13-Feb-21 |
96 Days |
- |
- |
363 |
IMARAT HOLDING PVT LTD |
2nd Floor, H.Kafurutholhige, K.Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT G. BATHALA (PHASE 1) |
Private |
GC01 |
G.Bathala |
15-Mar-21 |
12 Months |
12 Months |
- |
364 |
B BUILDERS PRIVATE LIMITED |
2nd Floor, H.Hani Dhoadhi, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION AND CONSTRUCTION WORKS OF 5 FLOORS AND TERRACE OF THE 5 STOREY BUILDING AT G.GOALHITHEREYGE |
Private |
GC02 |
G.Goalhithereyge |
1-Apr-21 |
12 Months |
12 Months |
- |
365 |
TLT CONSTRUCTION PRIVATE LIMITED |
M.Beach Flat, Sabudheli Magu, Male' |
Local |
CONCRETE WORKS OF TWO SLABS OF THE 10 STOREY BUILDING AT M. WHITE BELL |
Private |
GC01 |
M. White Bell |
5-Feb-21 |
104 Days |
75 Days |
- |
366 |
RPI PRIVATE LIMITED |
3rd Floor ,M.Marble,Kan'ba ais rani hingun,Male' |
Local |
DEVELOPMENT OF LHAVIYANI HUDHUFUSHI ISLAND |
Private |
GC01 |
Lh. Hudhufushi |
1-Jun-21 |
632 Days |
365 Days |
- |
367 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
DEMOLITION & CONCRETE WORKS OF 15 STOREY RESIDENTIAL BUILDING AT MA.SEERAAZEEGE |
Private |
GC01 &GC02 |
Ma.Seeraazeege |
5-Nov-19 |
780 Days |
365 Days |
- |
368 |
W CONSTRUCTION COMPANY PRIVATE LIMITED |
3rd Floor, H.Sheesha Vehi, Muthee Goalhi,Male' |
Local |
FOUNDATION WORKS AND CONSTRUCTION OF FIRST SLAB OF THE 12 STOREY BUILDING AT M.GOLDEN VALLEY |
Private |
GC01 |
M.Golden Valley |
15-Feb-21 |
110 Days |
6 Months |
- |
369 |
FAF CONSTRUCTION & TRADING PRIVATE LIMITED |
Ma.Foniluboage, Kurikeela Magu, Male' |
Local |
FOUNDATION,CONSTRUCTION AND FINISHING WORKS OF FIRST 5 FLOORS AND CONCRETE WORKS OF 6TH TO 10TH FLOOR OF G.MALAREETHIGE |
Private |
GC01 |
G.MALAREETHIGE |
1-May-21 |
18 Months |
12 Months |
- |
370 |
ABC CONSTRUCTION PVT LTD |
1st Floor,G.Niooranfini, Kalhuhura Magu,Male' |
Local |
CONSTRUCTION OF 12 STOREY BUILDING AT G. VAFFUSHI |
Private |
GC01 |
G.Vaffushi |
1-Apr-21 |
518 Days |
- |
- |
371 |
SUN HAVEN PRIVATE LIMITED |
1st Floor, V.Pavilion, Rahvehi Hingun, Vilimale' |
Local |
CONCRETE WORKS OF SLAB 7, 8, 9 AND 10TH FLOOR OF 10 STOREY BUILDING AT H. TRANQUIL LODGE |
Private |
GC02 |
H. Tranquil Lodge |
5-Dec-20 |
36 Months |
12 Months |
- |
372 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT M. JAYMUGE |
Private |
GC01 &GC02 |
M. Jaymuge |
15-Apr-21 |
670 Days |
364 Days |
- |
373 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF PROPOSED 6 STOREY BUILDING AT LOT 11050 |
Private |
GC01 &GC02 |
Hulhumale' Lot 11050 |
12-Apr-21 |
11 Months |
365 Days |
- |
374 |
ALTEC MALDIVES PRIVATE LIMITED |
H.Alihuras, Lonuziyaarai Magu, Male' |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY FACILITIES IN TH. VEYMANDOO- LOT 17 |
Government |
UC01 |
Th. Veymandoo |
18-Mar-21 |
20 Months |
365 Days |
- |
375 |
BUILDERS MAX |
M.Areej,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H LILAC HOUSE |
Private |
GC01 |
H.Lilac House 3 |
4-Jul-17 |
66 Months |
324 Months |
- |
376 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION OF 12 STOREY BUILDING (WITH TERRACE) AT M. KANDUFUSHI |
Private |
GC01 |
M. Kandufushi |
26-Jan-21 |
48 Months |
- |
- |
377 |
DESIGN BUILT SOLUTIONS PRIVATE LIMITED |
H.Amaani, sikka Goalhi, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT G.MOONIMAAGE PHASE 2 |
Private |
GC01 |
G.Moonimaage |
1-Oct-16 |
2281 days |
12 Months |
- |
378 |
SAS E CONSTRUCTION PRIVATE LIMITED |
1st Floor,M.Ebage, Irumaa Magu,Male' |
Local |
SHORE PROTECTION AND BEACHWORKS AT EAST SIDE AND WEST SIDE OF BODUFUSHI , RAA ATOLL |
Resort |
HC03 |
Bodufushi |
18-Feb-21 |
180 Days |
365 Days |
- |
379 |
HAZA CONSTRUCTION PRIVATE LIMITED |
2nd Floor, H.Nareen, Majeedhee Magu, |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT M. COTTAGE |
Private |
GC01 |
M. Cottage |
1-Sep-18 |
1398 Days |
365 Days |
- |
380 |
AFCONS INFRASTRUCTURE LIMITED |
Hithigas Golhi 5, Hulhumale' |
Foreign |
DESIGN AND BUILD OF CONSTRUCTION OF ROADS AND DRAINAGE SYSTEM IN ADDU CITY |
Government |
GC02 |
Addu City |
1-May-21 |
730 Days |
365 Days |
- |
381 |
VAALY CONSTRUCTION PVT LTD |
5th Floor, Vaaly Villa, Majeedheemagu |
Local |
CONCRETE WORKS OF 9TH,10TH AND 11TH FLOOR OF H.JOINTER |
Private |
GC01 |
H. Jointer |
4-Apr-21 |
67 Days |
- |
- |
382 |
DONBE'Z PRIVATE LIMITED |
H.Nemo, Sosun Magu, Male' |
Local |
REMEDIAL WORKS & COMPLETION OF 105 HOUSING UNIT AT HDH. KULHUDHUFFUSHI |
Government |
GC01 |
HDh. Kulhudhuffushi |
6-Apr-21 |
240 Days |
365 Days |
- |
383 |
MICRON PRIVATE LIMITED |
M.Nice Dream, Kanbaa Aisa Rani Hingun, Male' |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY FACILITIES IN F.Feeali - Lot 12 |
Government |
UC01 |
F. Feaali |
18-Mar-21 |
19 Months |
365 Days |
- |
384 |
MICRON PRIVATE LIMITED |
M.Nice Dream, Kanbaa Aisa Rani Hingun, Male' |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY FACILITIES IN TH.BURUNEE - LOT18 |
Government |
UC02 |
Th.Burunee |
18-Mar-21 |
19 Months |
365 Days |
- |
385 |
K.I.M GROUP PRIVATE LIMITED |
M.Fathaha,Fandiyaaru Magu,Male |
Local |
CONSTRUCTION OF 6 SLABS STRUCTURE (FOURTH, FIFTH, SIXTH, SEVENTH, EIGHTH AND NINTH SLAB) OF 10 STOREY BUILDING AT MA. CAMPUS CORNER |
Private |
GC01 &GC02 |
Ma. Campus Corner |
15-May-21 |
24 Months |
6 Months |
- |
386 |
MARKETECH MALDIVES PRIVATE LIMITED |
M.Iramaa, Fareedhee Magu, K. Male' |
Local |
DESIGN AND BUILD OF PROVISION OF WATER SUPPLY AND SEWERAGE FACILITIES AT GA.KONDEY-LOT 1 |
Government |
UC01 |
Ga. Kondey |
18-Mar-21 |
26 Months |
365 Days |
- |
387 |
MARKETECH MALDIVES PRIVATE LIMITED |
M.Iramaa, Fareedhee Magu, K. Male' |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY FACILITIES IN R. MAAKURATHU LOT-16 |
Government |
UC01 |
R. Maakurathu |
18-Mar-21 |
20 Months |
365 Days |
- |
388 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION OF 12 STOREY BUILDING AT M. SISIL GARDEN |
Private |
GC01 |
M. Sisil Garden |
30-May-19 |
1278 Days |
- |
- |
389 |
SANKEN OVERSEAS (PRIVATE) LIMITED |
8th Floor, Aagadhage Building, Boduthakurufaanu Magu, Male' |
Foreign |
DESIGN AND BUILD OF THE PROPOSED 80-ROOM ALILA RESORT |
Resort |
GC01 |
Kothaifaru Island,Raa.Atoll |
1-Dec-19 |
761 Days |
12 months |
- |
390 |
HIMAA INTERIORS PRIVATE LIMITED |
H.Rihithalhaage, Janavaree Magu, Male' |
Local |
CONSTRUCTION OF SINGLE BUILDING AT HILL CREST , S. HULHUDHOO, ADDU CITY |
Private |
GC01 |
Hill Crest , S.Hulhudhoo |
1-Jan-21 |
365 Days |
485 Days |
- |
391 |
K.I.M GROUP PRIVATE LIMITED |
M.Fathaha,Fandiyaaru Magu,Male |
Local |
CONSTRUCTION FIFTH &SIXTH FLOOR STRUCTURE OF 10 STROREY BUILDING AT G.IRAANUGE, MALE' |
Private |
GC02 |
G. Iraanuge Age |
15-May-21 |
168 Days |
6 Months |
- |
392 |
GLUT INVESTMENTS PRIVATE LIMITED |
G.Blue Whale, Alikilegefaanu Magu,Male' |
Local |
CONSTRUCTION OF 7TH FLOOR, 8TH FLOOR, 9TH FLOOR AND TERRACE OF 10 STOREY BUILDING AT H. HIRIFINOLU |
Private |
GC01 & GC02 |
H. Hirifinolhu |
1-Mar-21 |
20 Months |
- |
- |
393 |
RAPID CONSTRUCTION PRIVATE LIMITED |
G.Lux Villa,Dhonadhaaraada Higun |
Local |
FOUNDATION WORK AND CONCRETE WORK ON 1ST FLOOR, 2ND FLOOR AND 3RD FLOOR OF THE 08 STOREY BUILDING AT H. KIWILODGE |
Private |
GC01 |
H. Kiwilodge |
11-May-21 |
195 Days |
- |
- |
394 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
FOUNDATION AND CONCRETE WORKS OF 7 STOREY BUILDING AT H. GREEN LIGHT IRUMATHI |
Private |
GC01 &GC02 |
H. Green Light Irumathi |
1-May-21 |
61 Days |
21 Days |
- |
395 |
JAAH INVESTMENTS PRIVATE LIMITED |
5th Floor, Unit202,H.Davinci, Sosun Magu, Male |
Local |
DEVELOPMENT OF MIXED USE RESIDENTIAL COMPLEXES IN HULHUMALE, |
Government |
GC01 |
Lot no:10905-D2-1(a),Hulhumale' |
1-Nov-17 |
1521 days |
365 Days |
- |
396 |
MAZIYA CONSTRUCTION PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
CONSTRUCTION OF 2X1300M³ TANK FOUNDATION, PUMP BUILDING & BOUNDARY WALL AT BLOCK 378, K.MALE' |
Government |
GC01 |
BLOCK 378, K.MALE' |
6-Jun-21 |
172 Days |
365 Days |
- |
397 |
SOUTHNORTH PROPERTY DEVELOPMENT PRIVATE LIMITED |
Ma.Light Corner 3, Kenereemagu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT M. FALAK |
Private |
GC01 |
M. Falak |
1-May-21 |
24 Months |
24 Months |
- |
398 |
TRIVENI ENGINEERING AND INDUSTRIES LTD |
8th Floor, H.Filaa Building 2, Boduthakurufaanu Magu, Male' |
Foreign |
DESIGN AND BUILD FOR CONSTRUCTION OF WATER AND SEWERAGE FACILITIES IN GA. DHAANDHOO, GA. GEMANAFUSHI, GA. MAAMENDHOO, GDH. FARESMAATHODA AND GDH. HOADEHDHOO |
Government |
GC02 |
Ga. Dhaandhoo, Ga. Gemanafushi, Ga. Maamendhoo, Gdh. Madaveli, Gdh. Faresmaathoda, Gdh. Hoadehdhoo |
22-Jul-21 |
26 Months |
365 Days |
- |
399 |
BIZ KING PRIVATE LIMITED |
M.Fairy Villa, Shaheed Ali Hingun |
Local |
FOUNDATION OF 08 STOREY , CONSTRUCTION AND FINISHING WORK OF 08 STOREY BUILDING AT HULHUMALE LOT 11363 |
Private |
GC01 |
Hulhumale' Lot 11363 |
1-Jul-20 |
24 Months |
6 Months |
- |
400 |
MAZIYA CONSTRUCTION PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
CONSTRUCTION OF 10,000 M³ WATER TANK FOUNDATION IN K. HULHUMALE' PHASE-01 |
Government |
GC01&GC02 |
P1 MWSC Site, Hulhumale' |
6-Jun-21 |
76 Days |
365 Days |
- |
401 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONCRETE AND FINISHING WORKS OF 2ND AND 3RD FLOOR OF 12 STOREY BUILDING AT G.GURAHAAGE |
Private |
GC01&GC02 |
G.Gurahaage, Male' |
1-Apr-21 |
7 Months |
12 Months |
- |
402 |
SJ TRADE PRIVATE LIMITED |
Ma.Newyork House, Dhilbahaaru Magu, Male' |
Local |
CONSTRUCTION OF 6 CLASSROOMS AT TH. ATOLL EDUCATION CENTRE |
Government |
GC01 |
Th. Atoll Education Centre |
6-Jun-21 |
365 Days |
365 Days |
- |
403 |
AWASMAGU CONSTRUCTION PRIVATE LIMITED |
M.Alakaa, Handhuvaree Hingun, Male' |
Local |
CONSTRUCTION OF SEVEN STOREY BUIDING AT H.RUDHDHOSHUGE |
Private |
GC01 |
H.Ruhdhdhoshuge |
14-Mar-21 |
15 Months |
- |
- |
404 |
STAUNCH COMPANY PRIVATE LIMITED |
1st Floor, M.Rivelivilaa,Muiveyo magu, K. Male' |
Local |
CONSTRUCTION AND FINISHING WORKS OF 3RD FLOOR OF 10 STOREY BUILDING AT MA. VINAFEHI |
Private |
GC01 |
Ma. Vinafehi |
15-Feb-21 |
4 Months |
2 Months |
- |
405 |
MECO PRIVATE LIMITED |
1st Floor, M.Iramaa, Fareedhee Magu, Male' |
Local |
DESIGN, BUILD & OPERATION OF NEIGHBOURHOOD FISH FACTORY IN HULHUDHOO MEEDHOO, ADDU |
Government |
GC01 |
Addu City |
25-Feb-21 |
330 Days |
365 Days |
- |
406 |
ABC CONSTRUCTION PVT LTD |
1st Floor,G.Niooranfini, Kalhuhura Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT MA. FATHANGUGE |
Private |
GC01 |
Ma. Fathanguge |
6-Jun-21 |
150 Days |
- |
- |
407 |
HAIMAN CONSTRUCTION PVT LTD |
G.Green House, Dhonadharaadha Hingun, Male |
Local |
COMPLETION OF UNFINISHED WORKS OF AA. BODUFULHADHOO MOSQUE |
Government |
GC01 |
AA.Bodufulhadhoo |
22-Dec-20 |
180 Days |
- |
- |
408 |
SMC INFRASTRUCTURES PRIVATE LIMITED |
06 R 14-04 Row House, Hithigas Magu, Hulhumale'
|
foreign |
DESIGN AND BUILD FOR CONSTRUCTION OF WATER AND SEWERAGE FACILITIES IN M.KOLHUFUSHI, M.MADUVVARI, M.MULI, F.BILEHDHOO, F.DHARABOODHOO, DH.BANDIDHOO AND DH.MEEDHOO |
Government |
UC01 |
M.Kolhufushi, M.Maduvvari, M.Muli, F.Bilehdhoo, F.Dharaboodhoo, Dh.Bandidhoo and Dh.Meedhoo |
9-Jul-21 |
26 Months |
- |
- |
409 |
SMC INFRASTRUCTURES PRIVATE LIMITED |
06 R 14-04 Row House, Hithigas Magu, Hulhumale'
|
foreign |
DESIGN AND BUILD FOR CONSTRUCTION OF WATER AND SEWERAGE FACILITIES IN TH. HIRILANDHOO, L.GAN, L.ISDHOO, L.MAAMENDHOO AND L.MAABAIDHOO |
Government |
UC01 |
Th. Hirilandhoo, L.Gan, L.Isdhoo, L.Maamendhoo and L.Maabaidhoo |
9-Jul-21 |
26 Months |
- |
- |
410 |
K.I.M GROUP PRIVATE LIMITED |
M.Fathaha,Fandiyaaru Magu,Male |
Local |
CONSTRUCTION OF 6TH TO 9TH FLOOR OF THE 10 STOREY BUILDING AT G.LEMINA |
Private |
GC01 |
G.Lemina |
1-Jul-21 |
25 Months |
- |
- |
411 |
RAINBOW CONSTRUCTION PRIVATE LIMITED |
G.Maraana,Alikileygefaanu magu, Male' |
Local |
CONSTRUCTION OF 6 STOREY BUILDING AT HULHUMALE' LOT 10673 (M3-30) |
Private |
GC02 & GC02 |
Hulhumale' Lot 10673 (M3-30) |
5-Nov-20 |
906 Days |
- |
- |
412 |
JMC PROJECTS (INDIA) LIMITED |
A-104, Shapath-4.OPP.Karnavan Club, S.G Road, Ahmedabad, Gujarat, India |
foreign |
DESIGN AND CONSTRUCTION OF 2000 SOCIAL HOUSING UNITS IN HULHUMALE’ |
Government |
GC01 , UC01 |
Hulhumale' |
15-Jul-21 |
37 Months |
12 Months |
Terminated on 10th May 2023 |
413 |
JMC PROJECTS (INDIA) LIMITED |
A-104, Shapath-4.OPP.Karnavan Club, S.G Road, Ahmedabad, Gujarat, India |
foreign |
DESIGN AND BUILD FOR CONSTRUCTION OF WATER AND SEWERAGE FACILITIES IN LH.KURENDHOO, K.GAAFARU, K.KAASHIDHOO, AA. MAALHOS AND AA.THODDOO - PACKAGE 2 |
Government |
GC01 , UC01 |
Lh.Kurendhoo, K.Gaafaru, K.Kaashidhoo, Aa. Maalhos,Aa.Thoddoo |
30-Jun-21 |
26 Months |
12 Months |
Terminated on 10th May 2023 |
414 |
JMC PROJECTS (INDIA) LIMITED |
A-104, Shapath-4.OPP.Karnavan Club, S.G Road, Ahmedabad, Gujarat, India |
foreign |
DESIGN AND BUILD FOR CONSTRUCTION OF WATER AND SEWERAGE FACILITIES IN ADH.DHANGETHI , ADH.DHIGURAH, V.FELIDHOO, V.FULIDHOO AND V.THINADHOO - PACKAGE 3 |
Government |
GC01 , UC01 |
Adh.Dhangethi , Adh.Dhigurah, V.Felidhoo, V.Fulidhoo, V.Thinadhoo |
30-Jun-21 |
26 Months |
12 Months |
Terminated on 10th May 2023 |
415 |
NBCC (INDIA) LIMITED |
NBCC Bawan, Lodhi Road, New Delhi, India |
foreign |
ENGINEERING PROCUMENT AND CONSTRUCTION WORKS OF 2000 HOUSING UNITS AT HULHUMALE’ |
Government |
GC01 |
Hulhumale' |
1-Oct-21 |
900 Days |
12 Months |
- |
416 |
VISHVARAJ ENVIRONMENT PVT LTD |
2A, Neyhaa Building, Neerumathin Hingun, Male |
foreign |
DESIGN AND BUILD FOR CONSTRUCTION OF WATER AND SEWERAGE FACILITIES IN HA.KELAA, HA.BAARAH, HDH.VAIKARADHOO, SH.FUNADHOO, SH.LHAIMAGU AND N.MANADHOO - PACKAGES 1 |
Government |
GC01 , UC01 |
Ha.Kelaa, Ha.Baarah, Hdh.Vaikaradhoo, Sh.Funadhoo, Sh.Lhaimagu and N.Manadhoo |
27-Jul-21 |
26 Months |
12 Months |
- |
417 |
OAK DEVELOPMENT PVT LTD |
G.Goldfin house,halaveli goalhi, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT G.LACE |
Private |
GC01 |
G.LACE |
1-Jan-19 |
36 Months |
12 Months |
- |
418 |
ATOLL LINK PRIVATE LIMITED |
M.Fairy Villa, Shaheed Ali Hingun, Male |
Local |
FOUNDATION OF 08 FLOORS AND CONSTRUCTION OF 06 FLOORS AND TERRACE AT LOT 11254, HULHUMALE' |
Private |
GC01 |
LOT 11254, HULHUMALE' |
1-Apr-21 |
18 Months |
- |
- |
419 |
SILVER RAYS PRIVATE LIMITED |
M.Lavrest, Kanbaaaishaa Rani Hingun,Male' |
Local |
CONSTRUCTION OF 06 STOREY BUILDING WITH TARRACE AT G.ALIFUSHIGE |
Private |
GC01 |
G.Alifushige |
1-Jun-21 |
12 Months |
6 Months |
- |
420 |
DOMUS PVT LTD |
M. Rosyside, Janbumagu, Male' |
Local |
CONCRETE WORKS OF 7TH FLOOR TO TERRACE AND FINISHING WORKS FROM 6TH FLOOR TO TERRACE OF 8 STOREY BUILDING AT M.MINAA |
Private |
GC01 |
M.Minaa |
23-May-21 |
371 Days (excluding weekends) |
6 Months |
- |
421 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 5TH TO 9TH FLOOR WITH TERRACE OF THE 10 STOREY BUILDING AT H. FONIFONIMAAGE - PHASE 3 |
Private |
GC01 |
H.Fonifonimaage |
5-May-21 |
546 Days |
365 Days |
- |
422 |
KUDAKURATHU ISLAND RESORT PRIVATE LIMITED |
Ma.Dawn Shine , Zamaanee Goalhi , |
Local |
DEVELOPMENT OF RAA. KUDAKURATHU TOURIST RESORT -REMAINING WORKS OF THE PROJECT (CR(PL)19319-001) ISSUED TO SANKEN OVERSEAS (PRIVATE) LIMITED |
Private |
GC01 |
Raa. Kudakurathu |
26-Sep-19 |
715 Days |
365 Days |
- |
423 |
FAAHI CONSTRUCTION PRIVATE LIMITED |
Ma, Evening Rose , Enboogoalhi, K.Male |
Local |
REMAINING CONCRETE WORKS OF 05 STOREY BUILDING MA. VNIDHIFAN |
Private |
GC01 |
Ma. Vidhifan |
23-Jun-21 |
7 Months |
15 Days |
- |
424 |
N.R CONSTRUCTION (N.R.C) PRIVATE LIMITED |
Hulhmale' Lot No 11318 G.F, Rabarugas Magu, K, HulhuMale |
Local |
CONSTRUCTION OF 3RD TO 5TH FLOOR OF SIX FLOOR BUILDING AT HULHUMALE LOT 11304 |
Private |
GC01 |
Hulhumale 11304 |
1-May-21 |
15 Months |
360 Days |
- |
425 |
MAALAA HIGH RISING CONSTRUCTION PVT LTD |
G.Miles,Koimalaa Hingun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT G. AANU |
Private |
GC01 |
G. Aanu |
1-Jun-21 |
16 Months |
6 Months |
- |
426 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION AND FINISHING WORKS OF 10 STOREY BUILDING WITH TARRACE AT G.ZAMAANEE KULA |
Private |
GC01 |
G.Zamaaneekula |
1-Apr-21 |
18 Months |
- |
- |
427 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
Ma.Kelavi |
Local |
REMAINING CONCRETE & FINISHING WORKS OF 10 STOREY BUILDING AT MA. KELAVI |
Private |
GC01 |
Ma.Kelavi |
1-July-21 |
18 Months |
- |
- |
428 |
VAAVAA GROUP PRIVATE LIMITED |
2nd Floor,M.Dhoonifushi, Orchid Magu, Male' |
Local |
CONCRETE WORKS OF 4TH AND 5TH FLOOR OF 5 STOREY BUILDING AT MA.SILVER BEAM |
Private |
GC01 |
MA.SILVER BEAM |
1-Jul-21 |
100 Days |
- |
- |
429 |
KLAY LLP |
108-2-2, Rabarugas magu, Hulhumale' |
Local |
CONSTRUCTION OF 12 STOREY BUILDING AT G.FUNFALHU |
Private |
GC01 |
G.Funfalhu, Male' |
12-Jul-21 |
30 Months |
6 Months |
- |
430 |
SEVEN WEEKS PVT LTD |
Ma.Chilhiya Villa, Ameenee Magu, Male' |
Local |
FOUNDATION WORKS AND CONCERETE WORKS OF 03 FLOORS OF THE 05 STOREY BUILDING AT M.FENMAA |
Private |
GC01 |
M.Fenmaa, Male' |
20-Feb-21 |
210 Days |
- |
- |
431 |
DOMUS PVT LTD |
M. Rosyside, Janbumagu, Male' |
Local |
CONCRETE WORKS AND FINISHING WORKS OF 3RD FLOOR OF A 10 STORY BUILDING AT M.NADHEE |
Private |
GC01 |
M.Nadhee, Male' |
1-Nov-21 |
425 Days |
6 Months |
- |
432 |
PEARL TRAVEL SERVICE PRIVATE LIMITED |
H.Hirifushi, Asrafee Magu, Male' |
Local |
CONSTRCUTION OF 10 STOREY BUILDING (WITH TERRACE) AT M.FORD |
Private |
GC01 |
M.Ford, Male' |
1-Jun-21 |
24 Months |
12 Months |
- |
433 |
ALCAZAR PRIVATE LIMITED |
H.Dhubugas Dhoshuge, kurathi Goalhi, Male' |
Local |
CONSTRUCTION OF PUBLIC WASHROOMS AND MANAGEMENT OFFICES IN BUILDINGS NO. 1,3,4,5,8 OF HIYA HOUSING PROJECT IN HULHUMALE PHASE 2 |
Government |
GC01 |
Hiya Housing Project- Hulhumale Phase 2 |
25-May-21 |
90 Days |
365 days |
- |
434 |
CAUTION CONSTRUCTION PVT LTD |
M.Izdhihaaru, Koarukendi Magu, Male' |
local |
CONCRETE WORKS OF 10 FLOORS AND FINISHING WORKS OF 5 FLOORS AT MA. VAIMATHEEGE |
Private |
GC01 &GC02 |
MA. Vaimatheege |
27-May-21 |
730 Days |
180 Days |
- |
435 |
REGIONAL BUILDERS PRIVATE LIMITED |
Nares, Orchid Magu, Aa.Ukulhas |
local |
CONSTRUCTION OF 3 STOREY BUILDING AT WHITE PEARL, AA.UKULHAS |
Private |
GC01 |
White Pearl, AA.Ukulhas |
15-Dec-20 |
24 Months |
- |
- |
436 |
BEIJIN URBAN CONSTRUCTION GROUP CO., LTD |
H. Shabnam Residency, Majeedhee Magu, Male' |
local |
EXPANSION AND UPGRADING OF VELANA INTERNATIONAL AIRPORT, HULHULE' |
Government |
GC01, GC02 |
Ibrahim Nasir International Airport, Hulhule 22000 |
11-Dec-14 |
1841 Days |
12 Months |
- |
437 |
RUBIX PVT LTD |
M.Kudaveyomatheege, Sabdheli magu, Male' |
local |
Construction of N.Holhudhoo Health Centre Extension |
Government |
GC01, GC02 |
N.Holhudhoo |
5-Jul-21 |
120 Days |
10 Months |
- |
438 |
ABC Construction Private Limited |
G. Moonlight view, Handhuvarudhey Higun, Male' |
local |
CONSTRUCTION OF 4 STOREY BUILDING AT MA.HONEY |
Government |
GC01 |
MA. Honey |
1-Aug-21 |
304 Days |
- |
- |
439 |
RENOCON PRIVATE LIMITED |
Ma. Kufraa, Kameenee Magu, Male' |
local |
CONSTRUCTION WORKS OF 4TH SLAB OF MA.CARNATION VIEW DHEKUNUBAI |
Private |
GC01, GC02, |
Ma. Carnation View Dekunubai |
1-Jul-21 |
2 Months |
2 Months |
- |
440 |
RADHUN RESORTS & INVESTMENT PRIVATE LIMITED |
H.Ranrinbudhoo,Ameer Ahmed Magu, Male' |
local |
RECLAMATION AND DEVELOPMENT OF MAADHUNIFARU LAGOON |
Government |
GC01 &GC02 |
K.Maadhunifaru Lagoon |
5-Oct-15 |
86 Months |
- |
- |
441 |
RADHUN RESORTS & INVESTMENT PRIVATE LIMITED |
H.Ranrinbudhoo,Ameer Ahmed Magu, Male' |
local |
CONSTRUCTION AND DEVELOPMENT OF MAARAN FUSHI ISLAND AT K.MAADHUNIFARU LAGOON |
Government |
GC01 &GC02 |
K.Maadhunifaru Lagoon |
3-Feb-19 |
46 Months |
- |
- |
442 |
ABC CONSTRUCTION PVT LTD |
1st Floor,G.Niooranfini, Kalhuhura Magu,Male' |
local |
CONCRETE AND FINISHING WORKS OF 4TH & 5TH FLOOR OF 10 STOREY BUILDING MA. ISPANJUGE |
Private |
GC01 |
Ma. Ispanjuge |
1-Aug-21 |
80 Days |
- |
- |
443 |
ALAAF PRIVATE LIMITED |
7B, Ma.Dhilkushaage, Dhilkushaa Goalhi, Male' |
local |
CONCRETE WORKS OF 3 SLABS AND LIFT VOID OF THE 05 FLOOR BUILDING AT M.FORESTA |
Private |
GC01 |
M. Foresta |
8-Jul-21 |
100 Days |
365 Days |
- |
444 |
DONBE'Z PRIVATE LIMITED |
H.Sheeraz, Mustharee Magu, Male' |
local |
REMEDIAL WORKS & COMPLETION OF 52 HOUSING UNITS & DESIGN & CONSTRUCTION OF 48 HOUSING UNITS AT HDH. HANIMAADHOO. |
Government |
GC01 |
HDH. Hanimaadhoo |
18-Jul-21 |
330 Days |
365 Days |
- |
445 |
GREEN UNIVERSAL PRIVATE LIMITED |
Daily Work, Ha.Filladho |
local |
CONSTRUCTION OF NEW OFFICE BUILDING AND BOUNDARY WALL AT GDH.FIYOREE |
Private |
GC01 |
Gdh.Fiyoree |
24-May-21 |
180 Days |
- |
- |
446 |
SUN WORLD HOLIDAYS PVT LTD |
H, Vifilaage. Janavaree Magu, Male' |
local |
FOUNDATION WORKS OF 10 STOREY BUILDING AT H. LUXURY VIEW |
Private |
GC01, GC02 |
H. Luxury View |
15-Aug-21 |
5 Months |
356 Days |
- |
447 |
W CONSTRUCTION COMPANY PRIVATE LIMITED |
3rd Floor, H.Sheesha Vehi, Muthee Goalhi,Male' |
local |
FOUNDATION WORKS AND CONCRETE WORKS OF FIRST SLAB OF THE 10 STOREY BUILDING AT H. MAAIRAA |
Private |
GC01 |
H. Maairaa |
1-Sep-21 |
105 Days |
180 Days |
- |
448 |
ELITE CONSTRUCTION PRIVATE LIMITED |
3rd floor, Ma.Hudhugaa, Kigas magu, Male' |
local |
CONCRETE WORKS FROM 1ST TO 4TH FLOOR OF 10 STOREY BUILDING H. LUXURY VIEW |
Private |
GC01 |
H. Luxury View |
20-Sep-21 |
6 Month |
12 Months |
- |
449 |
W CONSTRUCTION COMPANY PRIVATE LIMITED |
3rd Floor, H.Sheesha Vehi, Muthee Goalhi,Male' |
local |
CONCERETE WORKS (1ST FLOOR - TERRACE FLOOR) OF THE 12 STOREY BUILDING AT M.GOLDEN VALLEY |
Private |
GC01 |
M.Golden Valley |
4-Sep-21 |
280 Days |
6 Month |
- |
450 |
SJ TRADE PRIVATE LIMITED |
Ma.Newyork House, Dhilbahaaru Magu, Male' |
local |
CONSTRUCTION OF CUSTOMS SOUTH REGIONAL HEAD OFFICE BUILDING AT ADDU CITY MARADHOO |
Government |
GC01 |
Addu City Maradhoo
|
8-Sep-21 |
411 Days |
356 Days |
- |
451 |
PROPOSE CONSTRUCTION PRIVATE LIMITED |
Ground Floor, Ma.Double Eight, Buruzu Magu,Male' |
local |
FOUNDATION AND CONCERETE WORKS OF 1ST AND 2ND FLOOR OF THE 10 STOREY BUILDING MA. LUXURY VILLA |
Private |
GC01 |
Ma. Luxury Villa |
20-Sep-21 |
145 Days |
6 Month |
- |
452 |
MOHAN MUTHA ASHOKA BUILDCON LLP |
R14-01A, Hithigas Magu, Hulhumale |
Foreign |
DEVELOPMENT OF HULHUMALE' PHASE 1 REMAINING ROADS & DEVELOPMENT OF PHASE 2 STAGE 2 ROADS |
Government |
GC02 |
Hulhumale',Phase 1 & 2 |
21-Apr-21 |
548 Days |
356 Days |
- |
453 |
REGIONAL BUILDERS PRIVATE LIMITED |
Nares, Orchid Magu, Aa.Ukulhas |
local |
CONSTRUCTION OF 5 STOREY BUILDING AT , BASHIMAA VILLA, AA. UKULHAS |
Private |
GC01 |
AA. Ukulhas
|
20-Sep-20 |
5 Years |
- |
- |
454 |
BLINDA PRIVATE LIMITED |
1st floor, G.Golden House,Bodurasgefaanu Magu, |
local |
CONSTRUCTION OF NEW POWERHOUSE AT V. FELIDHOO |
Government |
GC01 |
V. Felidhoo |
18-Aug-21 |
235 Days |
356 Days |
- |
456 |
PERFECT MALAFEHI MALDIVES PRIVATE LIMITED |
Kasthoorige, HA. Maarandhoo |
local |
EXTENTION OF HD. VAIKARADHOO HEALTH CENTER |
Government |
GC01 |
HD. Vaikaradhoo |
5-Aug-21 |
120 Days |
6 Month |
- |
458 |
TAG CONSTRUCTION & SUPPLY PRIVATE LIMITED |
Hulhumale Ferry Terminal, Boduthakurufaanu Magu, K. Male' |
local |
CONCRETE WORKS OF 4TH & 5TH FLOOR OF THE 10 STOREY BUILDING AT H. MARATHON |
Private |
GC01 |
H. Marathon |
1-Sep-21 |
6 Months |
6 Months |
- |
460 |
VANQUISHER CONSTRUCTION COMPANY PVT LTD |
Ma.Maaranga,Dhanburu Magu, Male'. |
local |
FOUNDATION WORKS AND CONSTRUCTION OF GROUND, FIRST & SECOND FLOOR AT 10 STOREY BUILDING G RIVERIN |
Private |
GC01 |
G. Riverin |
30-Sep-21 |
8 Month |
- |
- |
461 |
BUILT SPACES PRIVATE LIMITED |
M.Pole Star, Jambu Magu |
local |
CONSTRUCTION OF 7TH TO 10TH FLOOR AT 10 STOREY BUILDING H. FEHIVINAMAAGE |
Private |
GC01 |
H. Fehivinamaage |
16-Jan-20 |
18 Month |
- |
- |
462 |
HIZO CONSTRUCTION PRIVATE LIMITED |
G.Oakum Building 03 Floor, Hadheeba Magu, Male' |
local |
CONSTRUCTION OF 8 STOREY BUILDING AT H. HUMAIRA MANZIL |
Private |
GC01 |
H. Humaira Manzil |
1-Aug-21 |
30 Month |
6 Months |
- |
463 |
ALTEC MALDIVES PRIVATE LIMITED in JV with RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
H.Alihuras, Lonuziyaarai Magu, Male, M.Nectar, Asaree Hingun, Male' |
JV |
SURVEY, DESIGN AND CONSTRUCTION OF WATER SUPPLY AND SEWERAGE NETWORKS IN HDH. NELLAIDHOO, HDH. NEYKURENDHOO, HDH. MAKUNUDHOO AND SH. FEYDHOO |
Government |
UC01 & UC01 |
HDh. Nellaidhoo,HDh. Neykurendhoo, HDh. Makunudhoo & Sh. Feydhoo |
27-May-21 |
660 Days |
356 Days |
- |
464 |
WEE HOUR INVESTMENT PRIVATE LIMITED |
M.Merry Weather, Binma Goalhi, Male' |
local |
CONSTRUCTION OF DH. KUDAHUVADHOO JUVENILE CENTER |
Government |
GC01 |
Dh. Kudahuvadhoo |
27-Sep-21 |
450 Days |
- |
- |
465 |
ZHONGTIAN CONSTRUCTION GROUP CO. LTD
|
2b,H.Finiunimaage,Sosun Magu,Male' |
Foreign |
CONSTRUCTION OF NASANDHURA PALACE HOTEL AND COMPLEX,- EXTENTION |
Private |
GC01 |
Nasandhura Project Site office,Ameeru Ahmed Magu Street, Male' City,Maldives.20026 |
31-Mar-16 |
77 Months |
356 Days |
- |
466 |
NASA LINK PRIVATE LIMITED |
H.Lucky Shade 2, Dhillee Magu, Male' |
local |
CONSTRUCTION OF BUS STOPS IN HULHUMALE' PHASE II |
Government |
GC01, GC02 |
Hulhumale, Phase 2 |
17-Dec-21 |
120 Days |
- |
- |
467 |
NASA LINK PRIVATE LIMITED |
H.Lucky Shade 2, Dhillee Magu, Male' |
local |
CONSTRUCTION OF MULTIPURPOSE HALL R. ALIFUSHI SCHOOL |
Government |
GC01, GC02 |
R. Alifushi |
11-May-21 |
330 Days |
- |
- |
468 |
NASA LINK PRIVATE LIMITED |
H.Lucky Shade 2, Dhillee Magu, Male' |
local |
CONSTRUCTION OF 12 CLASSROOMS AT L. ATOLL EDUCATION CENTER |
Government |
GC01 |
L. Atoll Education Center ، L.Fonadhoo |
18-Aug-21 |
360 Days |
- |
- |
469 |
NASA LINK PRIVATE LIMITED |
H.Lucky Shade 2, Dhillee Magu, Male' |
local |
CONSTRUCTION OF 10 CLASSROOMS AT TH. GAADHIFFUSHI SCHOOL |
Government |
GC01 |
Th. Gaadhiffushi |
18-Aug-21 |
360 Days |
- |
- |
470 |
NASA LINK PRIVATE LIMITED |
H.Lucky Shade 2, Dhillee Magu, Male' |
local |
CONSTRUCTION OF 3 STOREY BUILDING AT TH. VEYMANDOO SCHOOL |
Government |
GC01 |
Th. Veymandoo |
18-Aug-21 |
360 Days |
- |
- |
471 |
NASA LINK PRIVATE LIMITED |
H.Lucky Shade 2, Dhillee Magu, Male' |
local |
CONSTRUCTION OF MULTIPURPOSE HALL BUILDING AT DH. ATOLL SCHOOL, DH. MEEDHOO |
Government |
GC01 |
Dh. Meedhoo |
18-Aug-21 |
360 Days |
- |
- |
472 |
CONBIZZ PRIVATE LIMITED |
Ground Floor,G.Ihaa,Sithithimaavaa Higun, Male' |
local |
FINISHING WORKS AT 5TH & 6TH FLOOR OF G. VERONA |
Private |
GC01 & GC02 |
G. Verona |
10-Oct-21 |
6 Months |
12 Months |
- |
473 |
BLUE COAST MALDIVES PRIVATE LIMITED |
2nd Floor 2B, Ma.Fahi'alha, Shaheed Kudanevi Thuththu Manik Hingun
|
local |
CONSTRUCTION OF BOUNDARY WALL OF EXTENTION BUILDING AT F. MAGOODHOO SCHOOL |
Government |
GC01 |
F. Magoodhoo |
5-Oct-21 |
105 Days |
- |
- |
474 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
local |
CONSTRUCTION OF 9 STOREY BUILDING AT MA. GULAABEEGE (PHASE 2) |
Private |
GC01 &GC02 |
Ma. Gulaabeege |
1-Nov-21 |
122 Days |
356 Days |
- |
475 |
SHIRMEENA CONSTRUCTION PRIVATE LIMITED |
G. Zamaaneege, Alikaleygefaanu Magu, Male' |
local |
CONSTRUCTION OF 3 STOREY BUILDING G. GADGAFEHI |
Private |
GC01 |
G. Gadhafehi |
16-Sep-21 |
12 Months |
- |
- |
476 |
MAALAA HIGH RISING CONSTRUCTION PVT LTD |
G.Miles,Koimalaa Hingun, Male' |
local |
CONSTRUCTION OF 12 STOREY BUILDING WITH BASEMENT AT H.RIHIDHOOLAGE |
Private |
GC01 |
H.Rihidhoolage |
22-Jun-18 |
48 Months |
12 Months |
- |
477 |
NASA LINK PRIVATE LIMITED |
H.Lucky Shade 2, Dhillee Magu, Male' |
local |
CONSTRUCTION WORKS OF NEW POWER HOUSE AND OFFICE AT SH. FEYDHOO |
Private |
GC01 |
Sh. Feydhoo |
20-Oct-20 |
360 Days |
- |
- |
478 |
LYCO CONSTRUCTION COMPANY PRIVATE LIMITED |
Ma.Daizy Villa,Anona Gaolhi,Male' |
local |
CONSTRUCTION OF 4 STOREY BUILDING AT H. GLORIOSA
|
Private |
GC01 |
H. Gloriosa |
1-Jun-21 |
24 Months |
- |
- |
479 |
ALBA INTERNATIONAL PVT LTD |
H.The Cyprea, Boduthakurufaanu Magu, Male' |
local |
CONSTRUCTION OF WAREHOUSING FACILITY AT HULHUMALE LOT NO. 10631 |
Private |
GC01 |
Lot 10631, Hulhumale |
25-Sep-16 |
1923 Days |
12 Months |
- |
480 |
AZZROVA MALDIVES PRIVATE LIMITED |
H.Maafaagaa, Ameeru Ahmed Magu, |
local |
CONSTRUCTION OF WASTE MANAGEMENT BUILDING AT HDh. NELLAIDHOO. |
Government |
GC01 &GC02 |
HDh. Nellaidhoo |
17-Oct-21 |
120 Days |
180 Days |
- |
481 |
KNOCK DOWN PRIVATE LIMITED |
M. Fathaha, Fandiyaaru Magu, 'Male |
local |
CONSTRUCTION OF 5 STOREY RESIDENTIAL BUILDING AT MA. RINSO |
Private |
GC01 |
Ma. Rinso |
10-Oct-21 |
25 Months |
6 Months |
- |
482 |
MARINEDO PRIVATE LIMITED |
M.Medhufalhu, Buruzu Magu, |
local |
REPAIR WORKS AT K. FUNADHOO OIL TERMINAL |
Government |
GC01 |
K. Funadhoo |
26-Aug-21 |
60 Days |
- |
- |
483 |
W CONSTRUCTION COMPANY PRIVATE LIMITED |
3rd Floor, H.Sheesha Vehi, Muthee Goalhi,Male' |
local |
CONCRETE WORKS FROM GROUND FLOOR TO 3RD FLOOR OF 10 STOREY BUILDING AT M. PETTY VILLA |
Private |
GC01 |
M. petty Villa |
1-Oct-21 |
5 Months |
- |
- |
484 |
MAALAA HIGH RISING CONSTRUCTION PVT LTD |
G.Miles,Koimalaa Hingun, Male' |
local |
FOUNDATION WORKS AND CONCRETE WORKS OF FIRST 4 FLOORS AND FINISHING WORKS OF 3 FLOORS OF 12 STOREY BUILDING AT G. DAILY WORK |
Private |
GC01 |
G. Daily work |
22-Sep-21 |
465 Days |
6 Months |
- |
485 |
MARUKAB PRIVATE LIMITED |
H.Maakolhige, 7th Floor, Feligas Magu, Male' |
local |
CONSTRUCTION OF 3 STOREY BUILDING AT GDH. VAADHOO, ASSEYRI |
Private |
GC01 |
GDh. Vaadhoo |
1-Oct-21 |
36 Months |
6 Months |
- |
486 |
SUN WORLD HOLIDAYS PVT LTD |
H.Vifilaage, Janavaree Magu, Male' |
local |
CONCRETE WORKS OF 9TH AND 10TH FLOORS OF THE 10 STOREY BUILDING AT M.HIRUNDHUMNAAGE |
Private |
GC01 &GC02 |
M.Hirudhumaage, Male' |
23-Oct-21 |
5 Months |
12 Months |
- |
487 |
KNOCK DOWN PRIVATE LIMITED |
M. Fathaha, Fandiyaaru Magu, 'Male |
local |
CONSTRUCTION OF 5 FLOORS OF 8 STOREY BUILDING AT MA. FERIDHOO HIYA |
Private |
GC01 |
Ma. Feridhoo Hiya |
1-Nov-21 |
24 Months |
6 Months |
- |
488 |
KNOCK DOWN PRIVATE LIMITED |
M. Fathaha, Fandiyaaru Magu, 'Male |
local |
CONSTRUCTION OF EIGHTH, NINETH AND AND TENTH FLOOR OF 10 STOREY BUILDING AT G. LEMINA |
Private |
GC01 |
G. Lemina |
1-Nov-21 |
24 Months |
6 Months |
- |
489 |
SAS E CONSTRUCTION PRIVATE LIMITED |
1st Floor,M.Ebage, Irumaa Magu,Male' |
local |
CONSTRUCTION OF WATER SUPPLY AND SEWERAGE FACILITY IN V. KEYODHOO |
Government |
GC01 &GC02 |
V. Keyodhoo |
5-Jun-21 |
540 Days |
365 Days |
- |
490 |
KANBALIFARU DEVELOPMENT PRIVATE LIMITED |
M.Fehigiri ,1st Floor,Handhuvaree Higun, Male' |
local |
CONSTRUCTION AND DEVELOPMENT OF TOURIST RESORT AT SH.KANBALIFARU |
Private |
GC01 |
Sh.Kanbalifaru, Maldives |
6-Nov-14 |
3682 days |
- |
- |
491 |
GLORIOUS TRADING AND SHIPPING CO, PRIVATE LIMTED |
M.Faamdheyrige 4/3, Faamdheyri Magu, Male' |
local |
FINISHING WORKS OF BONTHI GUESTHOUSE AT S. FEYDHOO. |
Private |
GC01 |
S. Feydhoo |
1-Sep-21 |
471 Days |
420 Days |
- |
492 |
ALIA CONSTRUCTION PVT LTD |
3th Floor,M. Alia Building, Gandha koalhi Magu, Male' |
local |
CONSTRUCTION OF A 6 STORY BUILDING WITH TERRACE AT LOT NO:10053, HULHUMALE" |
Private |
GC01 |
Lot no: 10053 - Hulhumale' |
14-Jul-19 |
1266 Days |
365 Days |
- |
493 |
BEAVER BUILDERS PRIVATE LIMITED |
N.Nilaaveli,Neelofaru Higun, Male' |
local |
CONSTRUCTION OF NEW OFFICE & BOUNDARY WALLS OF FENAKA BUILDING AT DH. KUDAHUVADHOO |
Government |
GC01 |
Dh. Kudahuvadhoo |
11-Oct-21 |
180 Days |
- |
- |
494 |
NIKOLA PRIVATE LIMITED |
G.Aimaa, Banafusaa Goalhi, |
local |
CONSTRUCTION OF 1 STOREY BUILDING AT K. GURAIDHOO, MADUFALHU |
Private |
GC01 |
K. Guraidhoo |
1-Nov-21 |
718 Days |
- |
- |
495 |
RUBIX PRIVATE LIMITED |
M.Kudaveyomatheege, Sabdheli magu, Male' |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF FIRE PUMPING STATION BUILDING-1, HULHUMALE' PHASE II |
Government |
GC01 |
Hulhumale', Phase-II |
30-Aug-21 |
150 Days |
365 Days |
- |
496 |
EBONY PRIVATE LIMITED |
7th Floor, Moonlight Villa,Medhuziyaarah Magu,Male' |
Foreign |
DEVELOPMENT OF MANIYAFARU RESORT , K.ATOLL |
Resort |
GC01 |
Plot of Lagoon at (4°03'25.1,",N,73°23'16.2"E) |
30-Sep-20 |
730 Days |
12 Months |
- |
497 |
AZZROVA MALDIVES PRIVATE LIMITED |
H.Maafaagaa, Ameeru Ahmed Magu, |
Local |
CONSTRUCTION & DEVELOPMENT OF BOREHOLES AT ISLAND FOR PACKAGE-1 (HA. VASHAFARU, HA. MAARANDHOO, HA. MURAIDHOO, HA. THAKANDHOO & HDH. HIRIMARADHOO) |
Government |
GC01, GC02 |
HA. Vashafaru, HA. Maarandhoo, HA. Thakandhoo, HA. Muraidhoo, HDH. Hirimaradhoo |
25-Oct-21 |
60 Days |
365 Days |
- |
498 |
AZZROVA MALDIVES PRIVATE LIMITED |
H.Maafaagaa, Ameeru Ahmed Magu, |
Local |
CONSTRUCTION & DEVELOPMENT OF BOREHOLES AT ISLAND FOR PACKAGE-2 (HDH. KUMUNDHOO, SH. FEEVAH, SH. GOIDHOO, N. MAAFARU, N. HENBADHOO,& N. FOHDHOO) |
Government |
GC01, GC02 |
HDH. Kumundhoo, SH. Feevah, SH. Goidhoo, N. Maafaru, N. Henbadhoo, N. Fohdhoo |
25-Oct-21 |
65 Days |
365 Days |
- |
499 |
AZZROVA MALDIVES PRIVATE LIMITED |
H.Maafaagaa, Ameeru Ahmed Magu, |
Local |
CONSTRUCTION & DEVELOPMENT OF BOREHOLES AT ISLAND FOR PACKAGE-3 (R. FAINU, R. INNAMMDHOO, B. KAMADHOO, B. MAALHOS & LH. OLHUVELIFUSHI) |
Government |
GC01, GC02 |
R. Fainu, R. Innamaadhoo, B. Kamadhoo, B. Maalhos, LH. Olhuvelifush |
25-Oct-21 |
60 Days |
365 Days |
- |
500 |
SEVEN WEEKS PVT LTD |
Ma.Chilhiya Villa, Ameenee Magu, Male' |
Local |
CONCRETE WORKS OF 8th, 9th, 10th AND TERRACE FLOOR OF 10 STOREY (WITH TERRACE) BUILDING AT H. FIYAAMAA AAGE |
Private |
GC01 |
H.Fiyaamaa Aage, Male' |
22-Aug-21 |
135 Days |
- |
- |
501 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION OF 12 STOREY BUILDING AT H. PINK STAR |
Private |
GC01 &GC02 |
H. Pink Star |
20-Oct-21 |
18 Months |
- |
- |
502 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H. GREEN WORLD |
Private |
GC01 &GC02 |
H. Green World |
18-Aug-21 |
18 Months |
- |
- |
503 |
FOOTMARK PRIVATE LIMITED |
G.Maple Leaf, Ameenee Goalhi |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT MA. WINDUMAAGE |
Private |
GC01 |
Ma. Windumaage |
3-Nov-21 |
24 Months |
- |
- |
504 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
FOUNDATION AND CONCERETE WORKS OF 1ST AND 2ND FLOOR OF THE 10 STOREY BUILDING MA. LUXURY VILLA |
Private |
GC01 &GC02 |
Ma. Luxury Villa |
27-Oct-21 |
4 Months |
- |
- |
505 |
HIZO CONSTRUCTION PRIVATE LIMITED |
G.Oakum Building 03 Floor, Hadheeba Magu, Male' |
Local |
CONSTRUCTION OF 5 STOREY RESIDENTIAL BUILDING AT H. LONUZIYAARAIGE |
Private |
GC01 |
H. Lonuziyaaraige |
19-Sep-21 |
12 Months |
- |
- |
506 |
HIZO CONSTRUCTION PRIVATE LIMITED |
G.Oakum Building 03 Floor, Hadheeba Magu, Male' |
Local |
CONCRETE WORKS OF 4TH & 5TH FLOORS AT H. MAHASA |
Private |
GC01 |
H. Mahasa |
1-Nov-21 |
90 Days |
- |
- |
507 |
DOMUS PVT LTD |
M. Rosyside, Janbumagu, Male' |
Local |
MASONRY & FINISHING WORKS OF 5TH, 6TH & 7TH FLOOR OF 10 STOREY RESIDENTIAL BUILDING AT M. NIYAMI |
Private |
GC01 &GC02 |
M. Niyami |
15-Nov-21 |
775 Days |
6 Months |
- |
508 |
ELAVARU MALDIVES PVT LTD |
v. Vasmeerufiya, Kalhuthukkala Magu, Male. |
Local |
CONCRETE WORKS FROM 6TH FLOOR TO 10TH FLOOR AND FINISHING WORKS FROM 04TH FLOOR TO 10TH FLOOR OF 10 STOREY BUILDING MA. NOORUH |
Private |
GC01 |
Ma. Nooruh |
3-Oct-21 |
365 Days |
6 Months |
- |
509 |
TIC TAC INVESTMENT |
CONSTRUCTION OF NEW POWERHOUSE AT L. MAABAIDHOO |
Local |
CONSTRUCTION OF NEW POWERHOUSE AT L. MAABAIDHOO |
Government |
GC01 &GC02 |
L. Maabaidhoo |
270 Days |
270 ދުވަސް |
12 Months |
- |
510 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT M. IARA |
Private |
GC01 &GC02 |
M. Iara |
28-Oct-21 |
18 Months |
- |
- |
511 |
SLAX PRIVATE LIMITED |
Evening House, Seenaa Magu, B.Kamadhoo |
Local |
CONSTRUCTION OF 3 STOREY BUILDING AT MINA, B. KAMADHOO |
Private |
GC01 |
B. Kamadhoo, Minaa |
22-Sep-21 |
3 Years |
12 Months |
- |
512 |
PROJECT SOLUTION PRIVATE LIMITED |
H.Kolhala 4B, Raiyvilla Higun, Male' |
Local |
CONSTRUCTION OF SECOND,THIRD,FOURTH AND TERRACE FLOOR AT MA.PINK VALLEY |
Private |
GC01 |
Ma. Pink Valley |
12-Oct-21 |
10 Months |
- |
- |
513 |
MAZIYA SERVICES PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
CONCRETE WORKS OF 8 STOREY BUILDING AT M. ROSES |
Private |
GC01 |
M. Roses |
30-Sep-21 |
12 Months |
12 Months |
- |
514 |
SAS E CONSTRUCTION PRIVATE LIMITED |
1st Floor,M.Ebage, Irumaa Magu,Male' |
Local |
DESIGN, BUILD - RECONSTRUCTION OF TH. KANDOODHOO HARBOUR |
Government |
GC01 &GC02 |
Th. Kandoodhoo |
13-Jun-21 |
420 Days |
365 Days |
- |
515 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H. ESJEHI VILLA |
Private |
GC01 |
H. Esjehi Villa |
26-Oct-21 |
8 Months |
360 Days |
- |
516 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H. ESJEHIGE |
Private |
GC01 |
H. Esjehige |
26-Oct-21 |
7 Months |
360 Days |
- |
517 |
OTHA PRIVATE LIMITED |
H.Reethiveli, Buruzu Magu |
Local |
CONSTRUCTION OF 5 STOREY BUILDING AT H. GOLEDEN MEET AAGE |
Private |
GC01 |
H. Golden Meet Aage |
28-Aug-21 |
153 Days |
180 Days |
- |
518 |
LYCO CONSTRUCTION COMPANY PRIVATE LIMITED |
Ma.Daizy Villa,Anona Gaolhi,Male' |
Local |
CONCRETE WORKS OF AT 8TH, 9TH & 10TH FLOOR AND STAIRS AND LIFT ROOM OF G. MAABADHI |
Private |
GC01 |
G. Maabadhi |
29-Sep-21 |
4 Months |
- |
- |
519 |
ONE REALTY PRIVATE LIMITED |
3rd floor, Ma,Fas Eri, Ameenee Magu, Male' |
Local |
CONSTRUCTION OF 6 STOREY BUILDING AT V. DHAKADHAA |
Private |
GC01 |
V. Dhakadhaa |
1-Oct-21 |
24 Months |
12 Months |
- |
520 |
RAINBOW CONSTRUCTION PRIVATE LIMITED |
G.Maraana,Alikileygefaanu magu, Male' |
Local |
DEVELOPMENT OF MIXED USE RESIDENTIAL COMPLEXES AT HULHUMALE, PLOT D7-1 |
Private |
GC01 &GC02 |
Hulhumale, plot D7-1 |
1-Aug-21 |
48 Months |
- |
- |
521 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
S. HITHADHOO PORT RE-DEVELOPMENT WORKS |
Government |
GC01 & GC02 |
S. Hithadhoo |
13-Sep-21 |
525 Days |
365 Days |
- |
522 |
CHINA MACHINERY ENGINEERING CORPORATION |
8th Floor,H.Suez,Ameer Ahmed Magu,Male' |
Foreign |
CONSTRUCTION OF 1530 HOUSING UNIT PROJECT PHASE III AT HULHUMALE' |
Government |
GC01 |
Hulhumale Phase II |
15-Mar-18 |
1630 Days |
365 Days |
- |
523 |
PLEXUS MALDIVES PRIVATE LIMITED |
66/17, The Cyprea, Boduthakurufaanu Magu |
Foreign |
AVANI FARES - RESORT DEVELOPMENT PROJECT |
Private |
GC01 &GC02 |
B. Avani fares |
15-Jan-19 |
42 Months |
12 Months |
- |
524 |
KNOCK DOWN PRIVATE LIMITED |
M. Fathaha, Fandiyaaru Magu, 'Male |
Local |
CONSTRUCTION OF 9TH. 10TH & TERRACE SLAB OF 10 STOREY RESIDENTIAL BUILDING H. THULUSDHOOGE |
Private |
GC01 |
H. Thulusdhooge |
10-Oct-21 |
24 Months |
6 Months |
- |
525 |
COASTLINE INVESTMENTS PTE LTD |
M.Irufuheyge,Maaveyo Magu, Male' |
Local |
CONSTRUCTION WORKS AT B. MAAMADUVVARI RESORT |
Resort |
GC01 & GC02 |
B. Maamaduvvari |
8-May-21 |
36 Months |
- |
- |
526 |
PROJECT SOLUTION PRIVATE LIMITED |
H.Kolhala 4B, Raiyvilla Higun, Male' |
Local |
CONSTRUCTION WORKS OF 4TH FLOOR OF THE 6 STOREY BUILDING AT MA. GOOD HEART |
Private |
GC01 |
M. Good Heart |
20-Nov-21 |
90 Days |
- |
- |
527 |
CEMEX CONSTRUCTION PRIVATE LIMITED |
M.Agate,Izzuhdheen Magu,Male' |
Local |
CONSTRUCTION WORKS OF 3RD & 4TH FLOORS AND FINISHING WORKS OF 3RD FLOOR AT 10 STOREY RESIDENTIAL BUILDING G. FUN |
Private |
GC01 |
G. Fun |
1-Oct-21 |
5 Months |
- |
- |
528 |
BLUE COAST MALDIVES PRIVATE LIMITED |
2nd Floor 2B, Ma.Fahi'alha, Shaheed Kudanevi Thuththu Manik Hingun |
Local |
CONSTRUCTION OF 10 NEW COUNCIL BUILDING AT F. BILEIDHOO |
Government |
GC01 |
F. Bileidhoo |
17-Oct-21 |
120 Days |
365 Days |
- |
529 |
EVE CONSTRUCTION PRIVATE LIMITED |
1st Floor , M.Yellow Sea,Muniyaa Magu |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT M. LAALPOOLGE AAGE |
Private |
GC01 |
M. Laalpool Aage |
21-Sep-21 |
24 Months |
- |
- |
530 |
ASIA ESTATE PVT LTD |
H.Omadhoo Fannu, Haveereee Higun , K.Male |
Local |
FOUNDATION AND CONCRETE WORKS OF GROUND FLOOR TO 3RD FLOOR AND FINISHING WORK UP TO THE SECOND FLOOR OF THE 6 STOREY BUILDING T V. TIM |
Private |
GC01 |
V. Tim |
17-Nov-21 |
242 Days |
180 Days |
- |
531 |
MAALAA HIGH RISING CONSTRUCTION PVT LTD |
G.Miles,Koimalaa Hingun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING (TOWER 1) AT MA. MALE HIGHER SECONDARY SCHOOL |
Government |
GC01 |
Ma. Male' Higher Secondary School |
1-Dec-21 |
395 Days |
6 Months |
- |
532 |
KNOCK DOWN PRIVATE LIMITED |
M. Fathaha, Fandiyaaru Magu, 'Male |
Local |
FOUDATION AND CONSTRUCTION OF FIRST 2 FLOORS AT 10STOREY RESIDENTIAL BUILDING G. FLYING |
Private |
GC01 |
G. Flying |
5-Dec-21 |
390 Days |
6 Months |
- |
533 |
STANDARD & ORIGIN PRIVATE LIMITED |
5th Floor,H.Sifa, Boduthakurufaanu Magu,Male' |
Local |
CONSTRUCTION OF 6 STOREY STEEL STRUCTURE AT G. FUNFEN |
Private |
GC01 |
G. Funfen |
1-Dec-21 |
24 Months |
12 Months |
- |
534 |
ABLE INVESTMENT PVT LTD |
G.Peakok, Bodurasgefaanumagu, Male' |
Local |
CONSTRUCITON OF 5TH FLOOR Of THE 5 STOREY BUILDING H. MEERUBAHURUGE AAGE |
Private |
GC01 |
H. Meerubahuruge Aage |
27-Nov-21 |
75 Days |
- |
- |
535 |
WEE HOUR INVESTMENT PRIVATE LIMITED |
M.Merry Weather, Binma Goalhi, Male' |
Local |
CONSTRUCTION OF MULTIPURPOSE HALL AND UPGRADING AT B. KENDHOO SCHOOL |
Government |
GC01 |
B. Kendhoo |
2-Nov-21 |
365 Days |
- |
- |
536 |
WEE HOUR INVESTMENT PRIVATE LIMITED |
M.Merry Weather, Binma Goalhi, Male' |
Local |
CONSTRUCTION 10 CLASSROOM & MULTIPURPOSE HALL AT N.HENBADHOO SCHOOL |
Government |
GC01 |
N. Henbadhoo |
2-Nov-21 |
365 Days |
- |
- |
537 |
NELKE' COMPANY PVT LTD |
H.Roasan View, Vaijehey Maage, Male' |
Local |
FOUNDATION AND CONSTRUCTION OF GROUND TO THIRD FLOOR OF THE 10 STOREY BUILDING AT M. JEEZAAGE UTHURU |
Private |
GC01 |
M. Jeezaage Uthuru |
5-Dec-21 |
8 Months |
365 Days |
- |
538 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN AND CONSTRUCTION OF A JETTY AT HA. HOARAFUSHI |
Government |
HC01 |
HA. Hoarafushi |
5-Aug-21 |
150 Days |
365 Days |
- |
539 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN AND BUILD OF SHORE PROTECTION STRUCTURES AT HA. HOARAFUSHI AIRPORT |
Government |
HC03 |
HA. Hoarafushi |
14-Jul-21 |
360 Days |
365 Days |
- |
540 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
CONSTRUCTION OF HA. DHIDHDHOO HARBOUR EXTENTION AND JETTY |
Government |
HC01 |
HA. Dhidhdhoo |
11-Feb-21 |
365 Days |
365 Days |
- |
541 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN AND BUILD OF HA. MURAIDHOO HARBOUR UPGRADING |
Government |
HC01 |
HA. Muraidhoo |
25-Aug-21 |
365 Days |
365 Days |
- |
542 |
WINGINEERING PRIVATE LIMITED |
1st floor, Lot 10558, Handhuvaree Hingun 02, Hulhumale' |
Local |
CONSTRUCTION AND FINISHING WORKS 06 STOREY BUILDING WITH TERRACE AT HULHUMALE' LOT 20029 |
Private |
GC01 |
Hulhumale' Lot 20029 |
10-Apr-21 |
12 Months |
12 Months |
- |
543 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF 4 STOREY WARERHOUSE AT HULHUMALE LOT 10647 |
Private |
GC01 |
Hulhumale Lot 10647 |
4-Nov-21 |
8 Months |
360 Days |
- |
544 |
NORTH COAST CONTRACTORS PRIVATE LIMITED |
H.Fusthulaamaage, Ameeru Ahmed Magu,Male' |
Local |
CONSTRUCTION OF MULTIPURPOSE HALL AT GDH. VAADHOO JAMALUDDIN SCHOOL |
Government |
GC01 |
GDh. Vaadhoo |
15-Nov-21 |
290 Days |
12 Months |
- |
545 |
CT AT THILAMAFUSHI PVT LTD |
4th Floor, Asters Building , Ameer Ahmed Magu, Male |
Foreign |
DEVELOPMENT OF A RESORT AT THILAMAFUSHI |
Private |
GC01 |
Lh.Thilamafushi |
15-Nov-18 |
1538 Days |
- |
- |
546 |
T.A CONSTRUCTION & TRADING PRIVATE LIMITED |
G.Miles, 01st Floor, Koimalaa Hingun, 20350, Male |
Local |
CONSTRUCITON OF 10 STOREY RESIDENTIAL BUILDING AT G. ANNAARU |
Private |
GC01 |
G. Annaaru |
1-Jan-22 |
720 Days |
12 Months |
- |
547 |
PROJECT SOLUTION PRIVATE LIMITED |
H.Kolhala 4B, Raiyvilla Higun, Male' |
Local |
CONSTRUCTION AND STRUCTURAL WORKS OF 7TH TO 9TH FLOOR & TERRACE FLOOR, FISHING WORKS OF 8TH &7TH FLOOR AND LIFT INSTALLATION AT 10 THE STOREY BUILDING AT G. HAAUFAA |
Private |
GC01 |
G. Haaufaa |
10-Nov-21 |
300 Days |
- |
- |
548 |
BEIJING URBAN CONSTRUCTION GROUP CO., LTD |
H. Shabnam Residency, Majeedhee Magu, Male' |
Foreign |
EXPANSION AND UPGRADING OF VELANA INTERNATIONAL AIRPORT, HULHULE' |
Government |
GC01, GC02 |
Ibrahim Nasir International Airport, Hulhule 22000 |
20-Nov-16 |
2232 Days |
12 Months |
- |
549 |
BRIC CONSTRUCTION |
Hulhumale Falat R10-01, Hithigas Magu, Hulhumale' |
Local |
CONSTRUCTION OF 4 STOREY BUILDING AT NIKOSHIA, HA. HOARAFUSHI |
Private |
GC01 |
HA. Hoarafushi |
1-Aug-21 |
24 Months |
12 Months |
- |
550 |
THE 23RD METALLURGICAL CONSTRUCTION GROUP CO., LTD |
Row House 12-02, No.07 Goalhi, Hithigas Magu, |
Foreign |
CONSTRUCTION OF SIFCO HIYA FLAT |
Private |
GC01 |
Hulhumale Phase II- Block No. B&C |
1-Dec-21 |
12 Months |
12 Months |
- |
551 |
AFAMI MALDIVES PRIVATE LIMITED |
M.Lilly Pool, 2nd Floor |
Local |
CONSTRUCTION OF MULTIPURPOSE HALL AT R. UNGOOFAARU SCHOOL |
Government |
GC01 |
R. Ungoofaaru |
16-Sep-21 |
360 Days |
365 Days |
- |
552 |
A MAN MALDIVES PVT LTD |
Ground Floor,M.Noothari, Male' |
Local |
CONSTRUCTION OF GA. KONDEY MOSQUE |
Government |
GC01 |
GA. Kondey |
17-Nov-21 |
365 Days |
12 Months |
- |
553 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION, CONCRETE WORKS AND FINISHING WORKS OF 7 STOREY BUILDING AT HULHUMALE' LOT 11062 |
Private |
GC01 |
Hulhumale' Lot 11062 |
29-Nov-21 |
24 Months |
12 Months |
- |
554 |
AFAMI MALDIVES PRIVATE LIMITED |
M.Lilly Pool, 2nd Floor |
Local |
CONSTRUCTION OF MULTIPURPOSE HALL AT N. MANADHOO SCHOOL |
Government |
GC01 |
N. Manadhoo |
25-Oct-21 |
300 Days |
365 Days |
- |
555 |
HARTZ COMPANY PRIVATE LIMITED |
Mugurige, Dhandi magu, GN.Fuvahmulah |
Local |
CONSTRUCTION OF 4 STOREY GUESTHOUSE AT DUBAI, MAADHADU, GN FUVAHMULAKU |
Private |
GC01 |
Dubai, Maadhadu, GN.Fuvahmulaku |
15-Dec-21 |
730 Days |
365 Days |
- |
556 |
AFAMI MALDIVES PRIVATE LIMITED |
M.Lilly Pool, 2nd Floor |
Local |
CONSTRUCTION OF MULTIPURPOSE HALL AT SH. MAAUNGOODHOO SCHOOL |
Government |
GC01 |
Sh. Maaungoodhoo |
16-Sep-21 |
365 Days |
365 Days |
- |
557 |
A MAN MALDIVES PVT LTD |
Ground Floor,M.Noothari, Male' |
Local |
CONSTRUCTION OF GN. FUVAHMULAH CITY DHOODIGAN MOSQUE |
Government |
GC01 |
Gn. Fuvahmulah |
1-Dec-21 |
365 Days |
12 Months |
- |
558 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN AND BUILD OF R. KINOLHAS HARBOUR UPGRADING PROJECT |
Government |
GC01 |
R. Kinolhas |
25-Nov-21 |
420 Days |
365 Days |
- |
559 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
CONSTRUCTION OF MAJOR ROADS AT R. DHUVAAFARU PHASE-2 |
Government |
GC02 |
R. Dhuvaafaru |
9-Sep-20 |
509 Days |
365 Days |
- |
560 |
AFAMI MALDIVES PRIVATE LIMITED |
M.Lilly Pool, 2nd Floor |
Local |
CONSTRUCTION OF 8 CLASSROOMS & MULTIPURPOSE HALL AT N. KUDAFAREE SCHOOL |
Government |
GC01 |
R. Kudafaree |
16-Sep-21 |
365 Days |
365 Days |
- |
561 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN & BUILD OF M. MULI AIRPORT |
Government |
GC01 & GC02 |
M. Muli |
28-Feb-21 |
365 Days |
365 Days |
- |
562 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN & BUILD OF L. GAN HARBOUR UPGRADING |
Government |
HC01 |
L. Gan |
25-Aug-21 |
365 Days |
365 Days |
- |
563 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
CONSTRUCTION OF SHORE PROTECTION STRUCTURES AT M. KOLHUFUSHI |
Government |
HC03 |
M. Kolhufushi |
30-Nov-21 |
365 Days |
365 Days |
- |
564 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN AND BUILD OF SHORE PROTECTION STRUCTURES LH. KURENDHOO |
Government |
HC03 |
Lh. Kurendhoo |
22-Nov-21 |
365 Days |
365 Days |
- |
565 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
LAND RECLAMATION AND SHORE PROTECTION OF M. DHIGGARU |
Government |
HC02 & HC03 |
M. Dhiggaru |
10-Nov-21 |
450 Days |
365 Days |
- |
566 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
S. HITHADHOO OLD HARBOUR UPGRADING PROJECT |
Government |
HC01 |
S. Hithadhoo |
1-Apr-21 |
365 Days |
365 Days |
- |
567 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
N. VELIDHOO BOAT BEACHING AREA WORKS PROJECT |
Government |
HC01 |
N. Velidhoo |
5-Apr-21 |
280 Days |
365 Days |
- |
568 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN AND BUILD OF MAJOR ROADS AT L. FONADHOO - PHASE 2 |
Government |
GC01 & GC02 |
L. Fonadhoo |
20-Jan-21 |
390 Days |
365 Days |
- |
569 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
COASTAL PROTECTION AT TH. BURUNI |
Government |
HC03 |
Th. Buruni |
7-Oct-21 |
240 Days |
365 Days |
- |
570 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN AND BUILD OF SHORE PROTECTION STRUCTURES AT B. KENDHOO |
Government |
HC03 |
B. Kendhoo |
9-Dec-21 |
365 Days |
365 Days |
- |
571 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
CONSTRUCTION OF GDH. FARESMAATHODAA AIRPORT CAUSEWAY |
Government |
GC01 & GC02 |
GDh. Faresmaathodaa |
12-Oct-21 |
180 Days |
365 Days |
- |
572 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
CONSTRUCTION OF GDH. MADAVELI-HOADEHDHOO CAUSEWAY |
Government |
GC01 & GC02 |
GDh. Madaveli, GDh. Hoadehdhoo |
9-Nov-21 |
300 Days |
365 Days |
- |
573 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN AND BUILD OF SHORE PROTECTION STRUCTURES AT ADH. KUN'BURUDHOO |
Government |
HC03 |
Adh. Kun'burudhoo |
13-Nov-21 |
150 Days |
365 Days |
- |
574 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN AND BUILD OF GDH. FARESMAATHODAA AIRPORT |
Government |
GC01 |
GDh. Faresmaathodaa |
10-Nov-21 |
600 Days |
365 Days |
- |
575 |
ASIA ESTATE PVT LTD |
H.Omadhoo Fannu, Haveereee Higun , K.Male |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H. BARABOAMAAGE |
Private |
GC01 |
H. Baraboamaage |
28-Nov-21 |
450 Days |
180 Days |
Terminated on 12th May 2022 |
576 |
MAKESHOP PRIVATE LIMITED |
G. Dhoalhu, K. Male' |
Local |
CONSTRUCTION OF STO SUPERSTORE AT STO TRADE CENTER |
Private |
GC01, GC02 |
STO Trade Center |
16-Oct-21 |
150 days |
180 days |
- |
577 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
CONSTRUCTION OF OPD BUILDING AT HDH. KULHUDHUFFUSHI REGIONAL HOSPITAL |
Government |
GC01 |
HD. Kulhudhuffushi |
18-Nov-21 |
180 Days |
365 Days |
- |
578 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN AND BUILD OF SHORE PROTECTION STRUCTURES AT B. DHARAVANDHOO |
Government |
HC03 |
B. Dharavandhoo |
9-Dec-21 |
180 Days |
365 Days |
- |
579 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
GA. VILLINGILI HARBOUR UPGRADING PHASE-3 |
Government |
HC01 |
GA. Villingili |
13-Jun-21 |
365 Days |
365 Days |
- |
580 |
ALAAF PRIVATE LIMITED |
7B, Ma.Dhilkushaage, Dhilkushaa Goalhi, Male' |
Local |
CONCRETE & FINISHING WORKS OF THE 10 STOREY BUILDING G. ROSARY-WEST |
Government |
GC01 |
G. Rosary-West |
1-Dec-21 |
8 Months |
12 Months |
- |
581 |
PEARL MILLET CONSTRUCTION PRIVATE LIMITED |
2nd Floor, H.Kandoomaage, Apt 2, Mushtharee Magu, Male' |
Local |
CONCRETE AND FINISHING WORKS AT 4TH TO 7TH FLOORS OF 8 STOREY BUILDING AT H.KAN'DOOMAAGE |
Private |
GC01 |
H. Kan'doomaage |
7-Dec-21 |
488 days |
12 Months |
- |
582 |
RAINBOW CONSTRUCTION PRIVATE LIMITED |
G.Maraana,Alikileygefaanu magu, Male' |
Local |
CONSTRUCTION OF 5 STOREY OFFICE BUILDING AT D6-1B (LOT 11637) |
Private |
GC01 |
Hulhumale' D6-1B(Lot 11637) |
17-Aug-21 |
24 Months |
- |
- |
583 |
SJ CONSTRUCTION PVT LTD |
Ma.Naseenee Handhuvaru, Male' |
Local |
DEVELOPMENT OF MIXED RESIDENTIAL BUILDINGS IN HULHUMALE' PLOT S1-4 (LOT 10958) - SJ CREEK RESIDENCES |
Private |
GC01 |
Hulhumale- S1-4 ( Lot 10958) |
31-Oct-21 |
36 Months |
12 Months |
- |
584 |
SLAX PRIVATE LIMITED |
Evening House, Seenaa Magu, B.Kamadhoo |
Local |
CONSTRUCTION OF 3 STOREY BUILDING AT MINA, B. KAMADHOO |
Private |
GC01 |
B. Kamadhoo, Minaa |
22-Sep-21 |
3 Years |
12 Months |
- |
585 |
LATHEEF CONSTRUCTION PRIVATE LIMITED |
H. Raylight Villa, Ameenee magu, Male' |
Local |
CONSTRUCTION OF 6 STOREY BUILDING AT HULHUMALE' LOT 10201 |
Private |
GC01 |
Hulhumale Lot 10201 |
1-Jan-22 |
18 Months |
- |
- |
586 |
TIC TAC INVESTMENT |
Ma.Facination, Iskandharu Magu |
Local |
CONSTRUCTION OF NEW POWERHOUSE AT L. MAABAIDHOO |
Government |
GC01, GC02 |
L. Maabaidhoo |
12-May-21 |
373 Days |
12 Months |
- |
587 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION, CONCRETE & FINISHING WORKS OF 10 STOREY BUILDING - (REMAINING WORKS) -MA. HIHTHALAGE |
Private |
GC01 |
Ma. Hihthalage |
29-Nov-21 |
12 Months |
12 Months |
- |
588 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION OF 10 STORY BUILDING AT M.KULHIDHOSHUGE |
Private |
GC01 |
M.Kulhidhoshuge |
15-Mar-21 |
24 Months |
12 Months |
- |
589 |
STANDARD & ORIGIN PRIVATE LIMITED |
5th Floor,H.Sifa, Boduthakurufaanu Magu,Male' |
Local |
CONCRETE & FINISHING WORKS FROM 3RD TO THE TERRACE FLOOR AT 10 STOREY BUILDING G. RIHIVELI |
Private |
GC01 |
G. Rihiveli |
13-Dec-21 |
20 Months |
12 Months |
- |
590 |
CONBIZZ PRIVATE LIMITED |
Ground Floor,G.Ihaa,Sithithimaavaa Higun, Male' |
Local |
CONSTRUCTION OF 08 FLOOR BUILDING AT G.CHEYNU |
Private |
GC01 |
G.Cheynu |
15-Oct-21 |
12 Months |
12 Months |
- |
591 |
AYYABEY PARTNERS |
Vaijeheyge, Izzudheen Magu, Dh.Kudahuvadhoo |
Local |
CONSTRUCTION FROM 1ST FLOOR TO 5TH FLOOR AND TERRANCE ROOM AT MA. NEW HEART ( EXTENSION)
|
Private |
GC01 |
Ma. New Heart
|
13-Dec-20 |
473 Days
|
6 Months
|
- |
592 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 07 STOREY BUILDING AT HULHUMALE' - ADDITIONAL WORKS - LOT 11100 |
Private |
GC01 |
Hulhumale' Lot 11100 |
7-Feb-22 |
388 Days |
- |
- |
593 |
MALUTHEREY CONSTRUCTION COMPANY PRIVATE LIMITED |
Maluthereyge |
Local |
CONSTRUCTION OF 2 STOREY BUILDING AT SCARLET, TH. VEYMANDOO, |
Private |
GC01 |
Th. Veymandoo |
1-Jan-22 |
3 Years |
- |
- |
594 |
AMIN CONSTRUCTION PRIVATE LIMITED |
2nd Floor,M.World Dream, Handhuvaree Hingun, Male' |
Local |
CONSTRUCTION OF 15 STOREY BUILDING (WITH BASEMENT) AT H. DHOOVEHI |
Private |
GC01 |
H. Dhoovehi |
12-Dec-17 |
1841 Days |
- |
- |
595 |
MAALAA HIGH RISING CONSTRUCTION PVT LTD |
G.Miles,Koimalaa Hingun, Male' |
Local |
CONSTRUCTION OF 15 STOREY BUILDING AT M.BEYDHANAAGE |
Private |
GC01 |
M.Beydhanaa |
1-Jun-21 |
30 Months |
6 Months |
- |
596 |
AMIN CONSTRUCTION PRIVATE LIMITED |
2nd Floor,M.World Dream, Handhuvaree Hingun, Male' |
Local |
CONTINUATION WORKS AT POLCO TOWERS A, B & C. |
Government |
GC01 |
Hulhumale' Lot No. 11134, 11135 & 11136 |
30-Dec-21 |
240 Days |
365 Days |
- |
597 |
GLUT INVESTMENTS PRIVATE LIMITED |
G.Blue Whale, Alikilegefaanu Magu,Male' |
Local |
CONSTRUCTION OF 4 FLOORS AND TERRACE AT FITNESS AND WELLNESS CENTER IN HULHUMALE' (LOT 11630 N1-54) |
Private |
GC01 |
Hulhumale' Lot 11630 (N1-54) |
1-Jan-22 |
18 Months |
6 Months |
- |
598 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
FOUNDATION WORKS AND CONCRETE WORKS OF 10 STOREY BUILDING AT M. NEEM FLOWER |
Private |
GC01 |
M. Neem Flower |
12-Dec-21 |
12 Months |
- |
- |
599 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
FOUNDATION WORKS WITH CONCRETE AND FINISHING WORKS OF FIRST 8 FLOORS OF 10 STOREY BUILDING AT H. MUNDOOGE |
Private |
GC01 |
H. Mundooge |
1-Dec-21 |
15 Months |
- |
- |
600 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
FOUNDATION AND CONCRETE OF 10 STOREY BUILDING WITH TERRACE AT MA. THOOBA |
Private |
GC01 |
Ma. Thooba |
1-Jan-22 |
16 Months |
- |
- |
601 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
Dhuveli,Finimagu,Hdh.Nolhivaran |
Local |
FOUNDATION WORKS AND COMPLETE CONSTRUCTION OF GROUND & FIRST FLOOR OF 10 STOREY BUILDING H. NASEEMEE VILLA |
Private |
GC01 |
H. Naseemee Villa |
15-Jan-22 |
6 Months |
- |
- |
602 |
SADHAN MART |
Dhuveli,Finimagu,Hdh.Nolhivaran |
Local |
CONSTRUCTION OF TWO STOREY BUILDING AT VINARES, H.DH.NOLHIVARAM |
Private |
GC01 |
Vinares, H.Dh.Nolhivaram |
1-Dec-20 |
731 Days |
- |
- |
603 |
DEL GRAND PRIVATE LIMITED |
Ground Floor,H.Del Rio, Raiyy Villa Higun |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H.REENA VILLA |
Private |
GC01 |
H. Reena Villa |
15-Mar-22 |
30 Months |
12 Months |
- |
604 |
AZZROVA MALDIVES PRIVATE LIMITED |
H.Maafaagaa, Ameeru Ahmed Magu, |
Local |
CONSTRUCTION OF RAINWATER HOLDING TANK, TREATED WATER HOLDING TANK, DEGASSIFIER FOUNDATION, RAINWATER LIFT WELL, BRINE WATER TANK & PUMP ROOM AT N. MAAFARU |
Government |
GC01, GC02 |
N. Maafaru |
3-Jan-22 |
80 Days |
365 Days |
- |
605 |
AZZROVA MALDIVES PRIVATE LIMITED |
H.Maafaagaa, Ameeru Ahmed Magu, |
Local |
CONSTRUCTION OF RAINWATER HOLDING TANK, TREATED WATER HOLDING TANK, DEGASSIFIER FOUNDATION, RAINWATER LIFT WELL, BRINE WATER TANK & PUMP ROOM AT N. HENBADHOO. |
Government |
GC01, GC02 |
N. Henbadhoo |
3-Jan-22 |
80 Days |
365 Days |
- |
606 |
PEARL MILLET CONSTRUCTION PRIVATE LIMITED |
2nd Floor, H.Kandoomaage, Apt 2, Mushtharee Magu, Male' |
Local |
SLAB WORKS OF 7TH & 8TH FLOOR & CONCRETE WORKS OF TERRACE FLOOR OF 8 STOREY BUILDING AT MA. PALACE |
Private |
GC01 |
Ma. Palace |
15-Jan-22 |
90 days |
- |
- |
607 |
TLT CONSTRUCTION PRIVATE LIMITED |
M.Beach Flat, Sabudheli Magu, Male' |
Local |
CONCRETE WORKS OF 5TH SLAB AND CONSTRUCTION OF 1 ROOM APARTMENT AT H.LOOSEENA |
Private |
GC01, GC02 |
H. Looseena |
28-Nov-21 |
3 Months |
- |
- |
608 |
ELITE CONSTRUCTION PRIVATE LIMITED |
3rd floor, Ma.Hudhugaa, Kigas magu, Male' |
Local |
STRUCTURAL WORKS AT 5TH FLOOR OF 10 STOREY BUILDING H. LUXURY VILLA |
Private |
GC01 |
H. Luxury View |
15-Jan-22 |
3 Months |
12 Months |
- |
609 |
BUILDUP INTERNATIONAL PRIVATE LIMITED
|
H.Dawnflake, Karankaa Magu, Male' |
Local |
CONSTRUCTION OF 6 FLOORS AND TERRACE OF THE 6 STOREY BUILDING AT HULHUMALE LOT 11011
|
Private |
GC01 |
Hulhumale' Lot 11011
|
30-Sep-21 |
15 Months |
- |
- |
610 |
TIC TAC INVESTMENT |
Ma.Facination, Iskandharu Magu, Male'
|
Local |
REMINING WORKS OF NEW POWERHOUSE AT M. RAIYMANDHOO
|
Private |
GC01, GC02 |
M. Raiymandhoo
|
1-Jun-22 |
280 Days |
6 Months
|
- |
611 |
PROGRESS CONSTRUCTION COMPANY PRIVATE LIMITED |
H.Sosun Mead, 2nd Floor,B1, Male' |
Local |
CONSTRUCTION OF 4 STOREY BUILDING AT AARUMEE .SH.MILANDHOO |
Private |
GC01 |
Aar mee, Sh. Milandhoo |
26-Dec-21 |
2 Years |
6 Months |
- |
612 |
SEVEN WEEKS PVT LTD |
Ma.Chilhiya Villa, Ameenee Magu, Male' |
Local |
FOUNDATION WORKS AND CONSTRUCTION OF 8 STOREY BUILDING AT KK DREAM CAMPUS/AMEER AHMED SCHOOL |
Private |
GC01 |
KK Dream Campus/Ameer Ahmed School, Male' |
10-Oct-21 |
300 Days |
- |
- |
613 |
ISLAND MARKET |
Andaapoolge, Zamaanee Higun, Adh. |
Local |
CONCRETE AND FINISHING WORKS OF GROUND FLOOR OF 2 STOREY BUILDING AT ANDAAPOOLGE, ADH.OMADHOO |
Private |
GC01 |
Andaapoolge, Adh.Omadhoo |
1-Jan-22 |
13 Months |
6 Months |
- |
614 |
METALLURGICAL CORPORATION OF CHINA LTD
|
6B. H.Fahaage, Muthee Goalhi
|
Local |
CONSTRUCTION OF SANDHURA RESIDENCES LUXURY APARTMENT COMPLEX (RENEWAL) |
Private |
GC02 |
Plot S1-1,S1-2,S1-3,S1-4
|
26-Aug-18 |
1647 Days
|
365 Days
|
- |
615 |
HEAVY FORCE PRIVATE LIMITED |
2nd Floor, H.Fulidhooge,Kalaafaanu Higun, Male'
|
Local |
UPGRADING OF SH.MAROSHI HARBOUR |
Government |
HC01, HC02, HC03 |
Sh. Maroshi |
10-Jan-22 |
420 Days |
365 Days
|
- |
617 |
PRINTRONICS |
M.Shining Pearl, Shameemee Goalhi, Male' |
Local |
INSTALLATION OF SEA OUTFALL (REMAINING WORKS) AT HULHUMALE PHASE 2 |
Government |
GC02 |
Hulhumale' Phase 2 |
25-Dec-21 |
35 Days |
- |
- |
618 |
PRINTRONICS |
M.Shining Pearl, Shameemee Goalhi, Male' |
Local |
CONSTRUCTION OF RAINWATER HOLDING TANK, TREATED WATER HOLDING TANK, DEGASIFER FOUNDATION ,RAIN WATER LIFT WELL, BRINE WATER TANK & PUMP ROOM AT B.KAMADHOO |
Government |
GC02 |
B.Kamadhoo |
25-Jan-22 |
90 Days |
- |
- |
619 |
PRINTRONICS |
M.Shining Pearl, Shameemee Goalhi, Male' |
Local |
CONSTRUCTION OF DEGASIFER FOUNDATION EXTENSION AT MWSC SITE AT HULHUMALE PHASE 1 |
Government |
GC02 |
Hulhumale' Phase 2 |
16-Dec-21 |
75 Days |
- |
- |
620 |
PROGRESS CONSTRUCTION COMPANY PRIVATE LIMITED |
H.Sosun Mead, 2nd Floor,B1, Male'
|
Local |
CONSTRUCTION OF 4 STOREY BUILDING AT RIFAAS MANZIL .SH.MILANDHOO |
Private |
GC01 |
Rifaas Manzil, Sh. Milandhoo |
26-Dec-21 |
2 Years |
6 Months |
- |
621 |
KANBALIFARU DEVELOPMENT PRIVATE LIMITED |
M.Fehigiri ,1st Floor,Handhuvaree Higun, Male' |
Local |
CONSTRUCTION AND DEVELOPMENT OF TOURIST RESORT AT SH.KANBALIFARU |
Resort |
GC01 |
Sh.Kanbalifaru, Maldives |
6-Nov-14 |
3047 Days |
- |
- |
622 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF 6 STOREY RESIDENTIAL BUILDING AT LOT 10973, HULHUMALE' |
Private |
GC01 |
Hulhumale' |
14-Dec-21 |
12 Months |
360 Days |
- |
623 |
ABC CONSTRUCTION PVT LTD |
1st Floor,G.Niooranfini, Kalhuhura Magu,Male' |
Local |
CONCRETE WORKS FROM 5TH, 6TH, 7TH, 8TH,9TH & TERRACE FLOOR AT H.KAROAGE AAGE |
Private |
GC01 |
H. Karoage Aage |
31-Jan-22 |
12 Months |
- |
- |
624 |
BROWNS ARI RESORT PRIVATE LIMITED |
N06A, Faamudheyri building, orchid Magu, Male' |
Foreign |
DEVELOPMENT OF TOURIST RESORT IN THE ISLAND OF ADH. BODUFINOLHU, MALDIVES |
Resort |
GC01 & GC02 |
ADh. Bodufinolhu |
7-Jun-15 |
456 Days |
24 Months |
- |
625 |
DEPICT PRIVATE LIMITED |
H.Woodland Aage, Kaani Goalhi,Male' |
Local |
CONCERET WORKS AT TERRACE FLOOR OF 10 STOREY BUILDING H. PAAYAL |
Private |
GC01 |
H.Paayal |
31-Dec-21 |
60 Days |
- |
- |
626 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION OF 5TH TO TERRACE FLOOR OF THE 11 STOREY BUILDING AT H. ENVER GREEN |
Private |
GC01 |
H. EVER GREEN |
21-Oct-21 |
6 Months
|
-
|
- |
627 |
YES MALDIVES PVT LTD |
H.Dhakadhamaage, Hithigas Magu, Male' |
Local |
CONSTRUCTION OF 8 CLASSROOMS AND MULTIPURPOSE HALL AT AA.UKULHAS SCHOOL |
Government |
GC01 |
Hulhumale Phase II |
1-Feb-22 |
35 Days |
365 Days |
- |
628 |
MAZIYA SERVICES PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
CONSTRUCTION OF 5TH, 6TH, 7TH, 8TH 9TH & 10TH FLOOR WITH TERRACE OF 10 STOREY BUILDING M. ASSIDHA |
Private |
GC01 |
M. Assidha |
1-Sep-21 |
24 Months |
24 Months |
- |
629 |
A.S.M COMPANY PRIVATE LIMITED |
Ma.Handhuvaree Villa, 1st Floor, Shaheedu kudanavi thuhthu manik Higun, Male' |
Local |
CONCRETE WORKS OF 03RD AND 4TH FLOOR OF THE 04 STOREY BUILDING AT MA. AVIROALHI, MA.ELACHA |
Private |
GC01 |
Elacha/Ma.AviRoalhi |
1-Jan-22 |
03 Months |
-
|
- |
630 |
NUGA CONSTRUCTION COMPANY PRIVATE LIMITED |
Dharuma, Havitha Magu, Hoadhandu, Fuvahmulah City |
Local |
CONCRETE & FINISHING WORKS AT 4TH, 5TH & 6TH FLOOR OF THE 10 STOREY BUILDING G. FEHIMAA |
Private |
GC01 |
G. Fehimaa |
25-Dec-21 |
06 Months |
-
|
- |
631 |
AXEN PARTNERS |
Ma.Ameenee Villa,Ameenee Magu,Male' |
Local |
CONSTRUCTION OF 07 STOREY AND TERRACE OF THE 10 STOREY BUILDING AT G. GREENLIN |
Private |
GC01 |
G. Greeenlin |
1-Jan-22 |
36 Months
|
-
|
- |
632 |
LANDMARK DEVELOPMENT PRIVATE LIMITED |
Lot11269, Hulhumale' Boakarumaa Hingun |
Local |
CONSTRUCTION FROM 3RD FLOOR TO TERRACE FLOOR OF 9 STOREY BUILDING(WITH TERRACE) MA. MEXICO |
Private |
GC01 |
Ma. Mexico |
1-Mar-22 |
12 Months |
6 Months |
- |
633 |
ENSYS COMPANY LIMITED |
636/4-6, Ramkhamhaeng 39 (Thapleela) Alley, Pracha Uthid Rd, Wangthonglang Sub-district, Wangthonglang District, Bangkok Metropolis 10310, Thailand |
Foreign |
DESIGN, BUILD, FINANCE, OWN, OPERATE, AND TRANSFER OF GRID-TIES SOLAR PHOTOVOLTAIC SYSTEM IN THE GREATER MALE' REGION |
Government |
GC01 |
Greater Male Region |
15-Mar-22 |
291 Days |
- |
- |
634 |
WINGINEERING PRIVATE LIMITED |
1st floor, Lot 10558, Handhuvaree Hingun 02, Hulhumale' |
Local |
CONSTRUCTION AND FINISHING WORKS 06 STOREY BUILDING WITH TERRACE AT HULHUMALE' LOT 20029 |
Private |
GC01 |
Hulhumale' Lot 20029 |
10-Apr-21 |
12 Months |
12 Months |
- |
635 |
PRECISION ENGINEERING SERVICES (PRIVATE) LIMITED |
M.Fulhafi,Gulhazaaru Goalhi,Male' |
Local |
UPGRADING WATER NETWORK AND STORAGE CAPACITY IN VANDHOO REGIONAL WASTE MANAGEMENT FACILITY |
Government |
GC01 &GC02 |
R.Vandhoo |
15-Apr-21 |
180 Days |
6 Months |
- |
636 |
VIEW CONSTRUCTION PVT LTD |
G. New Sharaaz, Bodurasgefaanu Magu |
Local |
FOUNDATION WORKS AND CONCRETE WORKS OF GROUND FLOOR TO SECOND FLOOR AT V.ROSHANEE HIYA |
Government |
GC01 &GC02 |
V.Roshanee Hiya |
1-Feb-22 |
12 Months |
3 Months |
- |
637 |
RAINBOW CONSTRUCTION PRIVATE LIMITED |
G.Maraana,Alikileygefaanu magu, Male' |
Local |
CONSTRUCTION OF KEREDHDHOO RESORT AT GA.KEREDHDHOO |
Resort |
GC01 &GC02 |
Ga.Keredhdhoo |
25-Nov-20 |
36 Months |
-
|
- |
638 |
AMIN CONSTRUCTION PRIVATE LIMITED |
2nd Floor,M.World Dream, Handhuvaree Hingun, Male' |
Local |
DESIGN AND CONSTRUCTION OF HIYA-VEHI PROJECT - PHASE 1 |
Government |
GC01, HC, UC |
Hlhumale' lots C2-1 , C2-2 & C2-3 (Phase1) |
19-Jan-17 |
2561 Days |
365 Days |
- |
639 |
ROAD DEVELOPMENT CORPORATION LIMITED |
1st Floor,MNSL Building,Orchid Magu,Male' |
Local |
DESIGN & BUILD OF SH.MILANDHOO MAJOR ROADS |
Government |
GC01 &GC02 |
Sh.Milandhoo |
12-Mar-20 |
520 Days |
365 Days |
- |
640 |
FLEXINC PRIVATE LIMITED |
6B. H.Fahaage, Muthee Goalhi |
Local |
DESIGN AND BUILD OF PROIVISION OF WATER SUPPLY AND SEWERAGE FACILITIES IN L.MUNDOO |
Government |
UC01 |
L.Mundoo |
28-Feb-21 |
780 Days |
365 Days |
- |
641 |
FENMULI CONSTRUCTIONS PRIVATE LIMITED |
H.Shark, Mustharee Magu, Male' |
Local |
FOUNDATION OF 10 FLOORS AND CONSTRUCTION OF 5 FLOORS AT G.WINTER ROSE |
Private |
GC01 |
G.Winter Rose |
15-Jun-21 |
245 Days |
365 Days |
- |
642 |
ZAANS DEVELOPERS PRIVATE LIMITED |
M.Sukoon, 1st Floor, Unigas Magu, Male' |
Local |
CONSTRUCTION OF 2 STORY BUILDINGAT M.NEYHAA DHEKUNU |
Private |
GC01 |
M.Neyhaa Dhekunu |
15-Dec-21 |
136 Days |
6 Months |
- |
643 |
COASTAL ENGINEERING SOLUTIONS PRIVATE LIMITED |
3F, Reef Residence, Irudheyma Hingun, Hulhumale |
Local |
CONSTRUCTION OF 4 CLASS ROOMS & MULTIPURPOSE HALL AT AA. MAALHOS SCHOOL, A MULTIPURPOSE HALL AT GA KANDUHULHUDHOO & 3 STOREY BUILDING WITH 12 CLASS ROOMS AT ADDU HIGH SCHOOL |
Private |
GC01 |
Addu City, AA.Maalhos،GA. Kanduhulhudhoo |
1-Sep-21 |
365 Days |
365 Days |
- |
644 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
FOUNDATION AND CONSTRUCTION OF 6 STOREY BUILDING G. ALIMATHAAGE |
Private |
GC01 |
G. Alimathaage |
15-Jan-22 |
14 Months |
-
|
- |
645 |
DUPLEX PRIVATE LIMITED |
H.new florida, Ameer Ahmed Magu, Male' |
Local |
CONSTRUCTION OF WATER SUPPLY & SEWEAGE FACILITY AT GA. NILADNHOO |
Government |
UC01 |
GA. Nilandhoo |
15-Jul-22 |
540 Days |
365 Days |
- |
646 |
INNF CONSTRUCTION COMPANY PVT LTD |
G.Finivilu, Dhomaidharaadha Higun, Male' |
Local |
FOUNDATION WORKS, CONSTRUCTION WORKS OF FIRST 3 FLOORS OF 9 STOREY BUILDING AT MA. DHIREY VIEW |
Private |
GC01 |
Ma. Dhirey View |
1-Dec-21 |
9 Months |
241 Days |
- |
647 |
DUPLEX PRIVATE LIMITED |
H.new florida, Ameer Ahmed Magu, Male' |
Local |
CONSTRUCTION OF WATER SUPPLY & SEWERAGE FACILITY AT GDH. NADELLA |
Government |
UC01 |
Secratariat of GDh. Nadella Council |
26-Jan-22 |
540 Days |
365 Days |
- |
648 |
DUPLEX PRIVATE LIMITED |
H.new florida, Ameer Ahmed Magu, Male' |
Local |
CONSTRUCTION OF WATER SUPPLY & SEWERAGE FACILITY AT ADH. DHIHDHOO |
Government |
UC01 |
Secratariat of Adh. Dhihdhoo Council |
26-Jan-22 |
540 Days |
365 Days |
- |
649 |
GLUT INVESTMENTS PRIVATE LIMITED |
G.Blue Whale, Alikilegefaanu Magu,Male' |
Local |
CONSTRUCTIUON OF MIXED-USE RESIDENTIAL COMPLEXES AT HULHUMALE PLOT NO. S1-3 |
Private |
GC01 |
Hulhumale Plot No. S1-3 |
22-Jan-22 |
1080 Days |
12 Months |
- |
650 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
FINISHING WORKS OF 12 STOREY BUILDING AT H. FOOLHUMA |
Private |
GC01 |
Foolhuma |
20-Feb-22 |
16 Months |
-
|
- |
651 |
CLIENTECH MALDIVES PRIVATE LIMITED |
H.Crystal, Samundhu Goalhi, Male' |
Local |
INSTALLATION OF CCTV FIBER NETWORK OF 30 MOSQUES AT MALE' AND VILIMALE' |
Private |
GC01, ME |
Male' , Vilimale |
30-Jan-22 |
33 Days |
4-Mar-22 |
- |
652 |
CLIENTECH MALDIVES PRIVATE LIMITED |
H.Crystal, Samundhu Goalhi, Male' |
Local |
CONSTRUCTION OF AIR FIBER BRIDGE BETWEEN MALE' AND VILIMALE |
Private |
GC01, ME |
Male' , Vilimale |
30-Jan-22 |
20 Days |
20-Feb-22 |
- |
653 |
ALIA CONSTRUCTION PVT LTD |
3th Floor,M. Alia Building, Gandha koalhi Magu, Male' |
Local |
CONSTRUCTION OF BOH BUILDINGS, GUEST ROOM VILLAS & PUBLIC AREAS AT CROSSROADS ISLAND 3 |
Private |
GC01 |
Emboodhoo Lagoon, Crossroads Island 3 |
1-Jan-22 |
424 Days |
24 Months |
- |
654 |
ECO INVESTMENTS MALDIVES PRIVATE LIMITED |
H. Rihifath 2nd Foor, K. Male' |
Local |
CONSTRUCTION OF 4 STOREY BUILDING AT GULEYNOORUMAAGE, GA. DHEVVADHOO |
Private |
GC01 |
Guleynoorumaage, GA. Devvadhoo |
13-Jan-22 |
24 Months |
-
|
- |
655 |
ADHAARASAM |
Amaaz, R.Alifushi |
Local |
CONSTRUCTION OF 03 STOREY BUILDING AT G.KOALHI |
Private |
GC01 |
G. Koalhi |
8-Feb-22 |
24 Months |
06 Months |
- |
656 |
TRUSTENG MALDIVES PRIVATE LIMITED |
Lot10541,Filigas Magu,Male |
Local |
DESIGN AND BUILD BASIS FOR SUPPLY AND INSTALLATION OF DECK AT HULHUMALE' FINISHED GOOD STORE |
Government |
GC01 |
Hulhumale' |
1-Jan-22 |
102 Days |
- |
- |
657 |
TRUSTENG MALDIVES PRIVATE LIMITED |
Lot10541,Filigas Magu,Male |
Local |
CONSTRUCTION OF 4 STOREY BUIDLING AT HAVEYLI , LH. NAIFARU |
Private |
GC01 |
Lh. Naifaru, Haveyli |
1-Dec-21 |
24 Months |
24 Months |
- |
658 |
MAALAA HIGH RISING CONSTRUCTION PVT LTD |
G.Miles,Koimalaa Hingun, Male' |
Local |
CONSTRUCTION OF F. NILANDHOO MOSQUE |
Government |
GC01 |
F. Nilandhoo |
17-Jan-22 |
300 Days |
365 Days |
- |
659 |
MAALAA HIGH RISING CONSTRUCTION PVT LTD |
G.Miles,Koimalaa Hingun, Male' |
Local |
CONSTRUCTION OF 4 CLASSROOMS, STAFFROOM & MULTIPURPOSE HALL AT R. INGURAIDHOO SCHOOL |
Government |
GC01 |
R. Inguraidhoo |
3-Jan-22 |
360 Days |
365 Days |
- |
660 |
MAALAA HIGH RISING CONSTRUCTION PVT LTD |
G.Miles,Koimalaa Hingun, Male' |
Local |
CONSTRUCTION OF 12 CLASSROOMS & MULTIPURPOSE HALL AT AA. HIMANDHOO SCHOOL |
Government |
GC01 |
AA. Himandhoo |
3-Jan-22 |
360 Days |
365 Days |
- |
661 |
DHIVEHI COMPANY PRIVATE LIMITED |
H. Haali, 2nd Floor, Majeedhee Magu, Male' |
Local |
CONSTRUCTION AND FINISHING WORKS OF 7 FLOORS INCLUDING FOUNDATION AT H. FEERUMURANGAMAA |
Government |
GC01 |
H. Feerumurangamaa |
1-Jan-20 |
942 Days |
- |
- |
662 |
ALAAF PRIVATE LIMITED |
7B, Ma.Dhilkushaage, Dhilkushaa Goalhi, Male' |
Local |
CONCRETE WORKS OF 3 FLOORS AT 10 STOREY BUILDING H.BLUE SHAFA |
Private |
GC01 |
H. Blue Shafa |
25-Dec-21 |
10 Months |
12 Months |
- |
663 |
MICRON PRIVATE LIMITED |
M.Nice Dream, Kanbaa Aisa Rani Hingun, Male' |
Local |
CONSTRUCTION OF 8 CLASSROOMS, SCIENCE LAB, AV ROOM & BOUNDARY WALL AT HA. ULIGAM SCHOOL. |
Government |
GC01 |
HA. Uligam |
1-Feb-22 |
365 Days |
365 Days |
- |
664 |
VISHAH REALESTATE PRIVATE LIMITED |
H.Dhaahadhaage, Roashanee Magu, Male' |
Local |
CONSTRUCTION OF 4 FLOOR AND TARRECE AT H.LUCKY SHADE |
Private |
GC01 |
H. Lucky Shade |
1-Jan-22 |
24 Months |
- |
- |
665 |
AIAS CONSTRUCTION COMPANY PRIVATE LIMITED |
Hulhumale' Lot no 11313, Rabarugas Magu, no 6 goalhi, Male' |
Local |
CONCERETE WORKS OF 03 STOREY BUILDING AT MA. MALUVILAA MEDHUBAI |
Private |
GC01 |
Ma. Maluvila medhubai |
6-Feb-22 |
04 Months |
- |
- |
666 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF 6 STOREY BUILDING AT HULHUMALE' LOT 10070 |
Private |
GC01 |
Hulhumale' Lot 10070 |
24-Jan-22 |
120 Days |
180 Days |
- |
667 |
BEAVER BUILDERS PRIVATE LIMITED |
N.Nilaaveli,Neelofaru Higun, Male' |
Local |
CONSTRUCTION OF NEW OFFICE & BOUNDARY WALLS OF FENAKA BUILDING AT DH. KUDAHUVADHOO |
Government |
GC01 |
Dh.Kudahuvadhoo |
11-Nov-21 |
360 Days |
360 Days |
- |
668 |
IMARAT HOLDING PVT LTD |
2nd Floor, H.Kafurutholhige, K.Male' |
Local |
CONCRETE AND FINISHING WORKS OF 2ND & 3RD FLOOR AT 4 STOREY BUILDING M. DIJULATHU KOARU |
Private |
GC01 |
M. Dhijulath Koaru |
1-Feb-22 |
06 Months |
360 Days |
- |
669 |
D.F.H INVESTMENT |
H. Bright Corner, Sandhubarag goalhi |
Local |
CONSTRUCTION OF 7 STOREY BUILDING WITH TERRACE AT H. FATHIHUGE ALI |
Private |
GC01 |
H. Fathihuge Ali |
15-Sep-21 |
420 Days |
365 Days |
- |
670 |
APEX REALTY PRIVATE LIMITED |
Plot No. 135, Gaakoshi, Ameenee Magu, Male' |
Foreign |
DEVELOPMENT & CONSTRUCTION OF 12 STOREY BUILDING WITH TERRACE AT M. ODEON |
Private |
GC01 |
M. Odeon |
13-Jan-22 |
48 Months |
12 Months |
- |
671 |
APEX REALTY PRIVATE LIMITED |
Plot No. 135, Gaakoshi, Ameenee Magu, Male' |
Foreign |
DEVELOPMENT & CONSTRUCTION OF 12 STOREY BUILDING WITH TERRACE AT NAADHEE (H. BLUE HEVEAN) |
Private |
GC01 |
Naadhee (H. Blue Heaven) |
13-Jan-22 |
48 Months |
12 Months |
- |
672 |
ZAAN DEVELOPERS PRIVATE LIMITED |
M.Sukoon, 1st Floor, Unigas Magu, Male' |
Local |
CONCRETE WORKS OF 3 SLABS & TERRACE FLOOR, FINISHING WORKS OF 5 FLOORS & LIFT INSTALLATION WORKS AT 10 STOREY BUILDING M. AASMAANUGE |
Private |
GC01 |
M. Aasmaanuge |
1-Mar-22 |
12 Months |
6 Months |
- |
673 |
MICRON PRIVATE LIMITED |
M.Nice Dream, Kanbaa Aisa Rani Hingun, Male' |
Local |
CONSTRUCTION OF 12 CLASSROOMS & 3 STOREY BUILDING AT R. HULHUDHUFFAARU SCHOOL |
Government |
GC01 |
R. Hulhudhuffaaru |
15-Oct-78 |
44593 |
365 Days |
- |
674 |
YES MALDIVES PVT LTD |
H.Dhakadhamaage, Hithigas Magu, Male' |
Local |
CONSTRUCTION OF 08 CLASSROOMS AND MULTIPURPOSE HALL AT SH.LAIMAGU SCHOOL |
Government |
GC01 |
Sh.Lhaimagu School |
21-Feb-22 |
365 Days |
365 Days |
- |
675 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN AND BUILD OF HDH. HANIMAADHOO HARBOUR UPGRADE |
Government |
HC01 |
HDh. Hanimaadhoo |
8-Oct-19 |
879 Days |
365 Days |
- |
676 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN AND BUILD OF K. MAAFUSHI NEW RECLAMATION CONNECTION BRIDGE |
Government |
GC02 & HC02 |
K. Maafushi |
11-Jan-22 |
365 Days |
365 Days |
- |
677 |
ABC CONSTRUCTION PVT LTD |
1st Floor,G.Niooranfini, Kalhuhura Magu,Male' |
Local |
CONCRETE WORKS AT 4TH, 5TH & TERRACE FLOOR OF 6 STOREY BUILDING G. CHEYNUGEY AAGE |
Private |
GC01 |
G. Cheynuge Aage-2 |
31-Jan-22 |
5 Months |
- |
- |
678 |
INNF CONSTRUCTION COMPANY PVT LTD |
G.Finivilu, Dhomaidharaadha Higun, Male' |
Local |
FOUNDATION WORKS AND CONCRETE WORKS OF 3 FLOORS WITH FINISHING OF 2 FLOORS OF 10 STOREY BUILDING AT G.HITHIFARU |
Private |
GC01 |
G.Hithifaru |
15-Dec-21 |
12 Months |
364 Days |
- |
679 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN AND BUILD OF SHORE PROTECTION STRUCTURES AT HDH. KULHUDHUFUSHI AIRPORT |
Government |
HC03 |
HDh. Kulhudhufushi |
22-Aug-22 |
200 Days |
365 Days |
- |
680 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN AND BUILD OF R. UNGOOFAARU ROAD PHASE II |
Government |
GC02 |
R. Ungoofaaru |
31-Oct-21 |
365 Days |
365 Days |
- |
681 |
I SEVEN Pvt Ltd |
M.Anbugas, Iraakumagu, Male' |
Local |
CONCRETE AND FINISHING WORKS OF THE 10 STOREY BUILDING AT MA. VAIMATHEEGE |
Private |
GC01 |
Ma. Vaimatheege |
1-Jul-21 |
36 Months |
180 Days |
- |
682 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN AND BUILD OF S. HULHUMEEDHOO MIFCO HARBOUR DEVELOPMENT PHASE 1 |
Government |
HC01 |
S. Hulhumeedhoo |
30-Oct-19 |
906 Days |
365 Days |
- |
683 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN AND BUILD OF SHORE PROTECTION STRUCTURES AT SH. MILANDHOO |
Government |
HC03 |
Sh. Milandhoo |
30-Nov-21 |
200 Days |
365 Days |
- |
684 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN AND BUILD OF N. MANADHOO HARBOUR CHANNEL WORKS |
Government |
HC01 |
N. Manadhoo |
6-Apr-21 |
390 Days |
365 Days |
- |
685 |
TRUSTENG MALDIVES PRIVATE LIMITED |
Lot10541,Filigas Magu,Male |
Local |
CONSTRUCTION OF 10 STOREY OFFICE BUILDING AT M.JALIYA |
Private |
GC01 & GC02 |
M.Jaliya |
1-Nov-20 |
880 Days |
- |
- |
686 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
DESIGN AND BUILD OF SHORE PROTECTION STRUCTURES AT S. HITHADHOO |
Government |
HC03 |
S. Hithadhoo |
9-Dec-21 |
165 Days |
365 Days |
- |
687 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
K. KUDA GIRI PICNIC ISLAND RECLAMATION AND SHORE PROTECTION |
Government |
HC02 & HC03 |
K. Kuda Giri |
1-Sep-21 |
150 Days |
365 Days |
- |
688 |
MALDIVES TRANSPORT & CONTRACTING COMPANY PLC |
Maldives Transport and Contracting Company, Boduthakurufaanu Magu, K.Male' |
Local |
K. DHOONIDHOO HARBOUR AND SHORE PROTECTION |
Government |
HC02 & HC03 |
K. Dhoonidhoo |
5-Sep-19 |
953 Days |
365 Days |
- |
689 |
RENAATUS PROJECTS PRIVATE LIMITED |
Renaatus Ithaamuiy APT 901, Fithuroanu Magu, hulhumale' |
Foreign |
CONSTRUCTION OF 600 SOCIAL HOUSING UNITS AT HULHUMALE (PACKAGE 1) |
Government |
GC01 |
Hulhumale Plot N4-68 & N4 -51 |
17-Jan-22 |
24 Months |
12 Months |
- |
690 |
ANEEZA ENTERPRISES PVT LTD |
Ma.Santana Tower 7A, Chandhanee Magu,Male' |
Local |
CONCRETE WORKS FROM 3RD FLOOR TO 8TH FLOOR OF 08 STOREY BUILDING (WITH TERRACE) AT G.VAIJEHEYGE AAGE 2, MALE' |
Private |
GC01 |
G.Vaijeheyge aage 2 |
1-Jan-22 |
6 Months |
- |
- |
691 |
IKAD MALDIVES PRIVATE LIMITED |
M. Fayoom, Kaaminimagu, K. Male' |
Local |
UPGRADING/INTERIOR RENNOVATION WORKS TO EXISTING WATER VILLAS AT KANUHURAA MALDIVES , LH. ATOLL |
Resort |
GC01 |
Lh.Kanuhura |
1-Aug-21 |
303 Days |
60 Days |
- |
692 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION OF CHSE B BLOCK AT HULHUMALE PHASE 2 |
Private |
GC01 |
Hulhumale Phase 2, lot 11643 |
26-Dec-21 |
420 Days |
- |
- |
693 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 2 STOREY MASJID AL JAAMIU AT HULHUMALE LOT 20110 |
Private |
GC01 |
Hulhumale' Lot 20110 |
1-Mar-22 |
913 Days |
365 Days |
- |
694 |
CHINA STATE CONSTRUCTION MALDIVES PRIVATE LIMITED |
6th Floor, H.Aage, Boduthakurufaanu Magu, Male' |
Foreign |
CONSTRUCTION OF CHANNEL BETWEEN PHASE 1 & 2 IN HULHUMALE' |
Government |
GC01 & GC02 |
Hulhumale Phase II |
1-Jan-20 |
30 Months |
12 Months |
- |
695 |
M.T HOJGAARD PRIVATE LIMITED |
5th Floor, H.filigasdhoshuge Building, Ameeru Ahmed Magu, Male' |
Foreign |
COASTAL PROTECTION AT GN. FUVAMMULAH |
Government |
HC01 |
Gn. Fuvammulah |
23-Jan-20 |
606 Days |
365 Days |
- |
696 |
VENZA COMPANY PRIVATE LIMITED |
1st Floor,10073 Hulhumale lot, Nirolhu Magu, Male' |
Local |
CONSTRUCTION OF 12 CLASSROOMS, LABS & OFFICE BLUILDING AT SN. MARADHOO, MARADHOO FEYDHOO IRUSHADHIYYA SCHOOL |
Government |
GC01 & GC02 |
Maradhoo, Maradhoo Feydhoo |
14-Feb-22 |
524 Days |
365 Days |
- |
697 |
KD ENTERPRISES PRIVATE LIMITED |
3rd Floor, M.Asurumaa View, Orchid Magu, Male' |
Local |
CONSTRUCTION OF NEW FENAKA OFFICE BUILDING AT HA. THAKANDHOO- REMAINING WORKS |
Government |
GC01 |
Ha. Thakandhoo |
2-Mar-22 |
180 Days |
180 Days |
- |
698 |
RE-PLAN MALDIVES PRIVATE LIMITED |
2nd Floor B, H. Meerubahuruge, Ameeru Ahmed Magu, K. Male' |
Foreign |
INSTALLATION OF MEP PLANT AND MEP MAIN RETICULATION |
Private |
ME01, ME02, ME03, ME04, ME06 & ME07 |
Emboodhoo Lagoon, Crossroads Island 3 |
1-Jan-22 |
18 Months |
24 Months |
- |
699 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION, CONCRETE & FINISHING WORKS OF 10 STOREY WITH TERRACE BUILDING AT M. TEESHIAN |
Private |
GC01 |
M.Teeshian |
2-Feb-22 |
12 Months |
- |
- |
700 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 11 STOREY BUILDING AT MA. TWILIT |
Government |
GC01 |
Ma. Twilit |
1-Mar-22 |
273 Days |
365 Days |
- |
701 |
URBASER S.A |
6 th Floor, H. Aage, Boduthakurufaaanu Magu, K. Male' |
Foreign |
DESIGN, BUILD & OPERATE A WASTE TO ENERGY FACILITY IN K. THILAFUSHI |
Government |
GC01, GC02 & UC02 |
K. Thilafushi |
2-Mar-22 |
42 Months |
180 Months |
- |
702 |
JAUSA CONSTRUCTION MALDIVES PVT LTD |
M.Reena,Carnation Magu, Male' |
Local |
LIFT LOBBY ETENSION WORKS OF HIYAA HOUSING PROJECT IN HULHUMALE PHASE II |
Government |
GC01 |
Hulhumale' Phase II |
3-Jan-22 |
60 Days |
5 Months |
- |
703 |
I CONSTRUCTION PRIVATE LIMITED |
M.Nalahiya, Buruzu Magu, male' |
Local |
CONCRETE WORKS FROM 5TH FLOOR TO 10TH FLOOR AT 10 STOREY BUILDING M. LUCK |
Private |
GC01 |
M. Luck |
1-Mar-22 |
120 Days |
365 Days |
- |
704 |
ELEVATE INDUSTRIES PRIVATE LIMITED |
M. Achieve, Iramaa Magu, K. Male' |
Local |
CONSTRUCTION OF 3 STOREY BUILDING WITH TERRACE AT BAHAARU V. KEYODHOO |
Private |
GC01 |
Bahaaru |
20-Mar-22 |
18 Months |
12 Months |
- |
705 |
NOORAHDHEEN INVESTMENT |
Huvaa , Unaisaa Magu, S. Meedhoo |
Local |
CONSTRUCTION OF 2 STOREY BUILDING AT SHELLYWAY, S. MEEDHOO |
Private |
GC01 |
S. Meedhoo, Shellyway |
1-Mar-22 |
36 Months |
12 Months |
- |
706 |
KIYOTO REEF PRIVATE LIMITED |
V.Kiyoto, Veshi Magu, Villimale |
Local |
CONSTRUCTION OF 2 STOREY BUILDING WITH TERRACE AT MIYAREN, TH. GURAIDHOO |
Private |
GC01 |
Miyaren, Th.Guraidhoo |
4-Dec-21 |
24 Months |
12 Months |
- |
707 |
ITHAAFUSHI INVESTMENTS PRIVATE LIMITED |
H.Seaside, Boduthakurufaanu Magu,Male' |
Foreign |
DEVELOPMENT OF K.ITHAAFUSHI |
Private |
GC01 & GC02 |
K. Ithaafushi |
27-May-18 |
1495 Days |
- |
- |
708 |
MARS DEVELOPERS PRIVATE LIMITED |
M.Qaus, Gandhakoalhi Magu, Male' |
Local |
CONSTRUCTION OF ENGINEERING SERVICE CENTER AT AA. BODUFOLHUDHOO |
Private |
GC01 |
AA. Bodufolhudhoo |
1-Mar-22 |
18 Months |
6 Months |
- |
709 |
SAS E CONSTRUCTION PRIVATE LIMITED |
1st Floor,M.Ebage, Irumaa Magu,Male' |
Local |
DESIGN & BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY FACILITIES IN DH. HULHUDHELI - LOT 10 |
Private |
GC01 |
Dh. Hulhudheli |
16-Oct-21 |
600 Days |
365 Days |
- |
710 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF 4 STOREY WARERHOUSE AT HULHUMALE LOT 10647 |
Private |
GC01 |
Hulhumale Lot 10647 |
4-Nov-21 |
484 Days |
360 Days |
- |
711 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H. ESJEHIGE |
Private |
GC01 |
H. Esjehige |
26-Oct-21 |
430 Days |
360 Days |
- |
712 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H. ESJEHI VILLA |
Private |
GC01 |
H. Esjehi Villa |
26-Oct-21 |
430 Days |
360 Days |
- |
713 |
INLINE GROUP PRIVATE LIMITED |
Mahcan Goalhi, Randhadhaage, Dhanburuh Magu, Male' |
Local |
CONCRETE WORKS OF 3RD FLOOR AT 10 STOREY BUILDING AT M. GREENFISH |
Private |
GC01 |
M. Greenfish |
1-Dec-21 |
6 Months |
- |
- |
714 |
IBB PRIVATE LIMITED |
1st Floor , M. Sunny View, Izzudheen Magu, K.Male' |
Local |
CONSTRUCTION WORKS OF NEW POWER HOUSE R. RASGATHEEMU |
Private |
GC01 |
R. Rasgatheemu |
24-Jan-21 |
300 Days |
- |
- |
715 |
ALAAF PRIVATE LIMITED |
7B, Ma.Dhilkushaage, Dhilkushaa Goalhi, Male' |
Local |
CONCRETE & FINISHING WORKS OF THE 10 STOREY BUILDING G. ROSARY-WEST (REMINING WORKS) |
Private |
GC01 |
G. Rosary-West |
1-Dec-21 |
8 Months |
12 Months |
- |
716 |
JAUSA CONSTRUCTION MALDIVES PVT LTD |
M.Reena,Carnation Magu, Male' |
Local |
ADDITIONAL WATER PROVISIONS FOR CORRIDORS OF THE HIYAA HOUSING PROJECT IN HULHUMALE PHASE II |
Government |
UC01 |
Hulhumale' Phase II |
22-Feb-22 |
60 Days |
6 Months |
- |
717 |
JAUSA CONSTRUCTION MALDIVES PVT LTD |
M.Reena,Carnation Magu, Male' |
Local |
ADDITIONAL RAILING WORKS OF THE HIYAA HOUSING PROJECT IN HULHUMALE PHASE II |
Government |
GC01 |
Hulhumale' Phase II |
22-Feb-22 |
30 Days |
6 Months |
- |
718 |
CORAL INVESTMENTS PRIVATE LIMITED |
Asareege, GDh. Vaadhoo |
Local |
CONSTRUCTION OF AGRO WAREHOUSE AT L. ISDHOO |
Government |
GC01 |
L. Isdhoo |
10-Dec-21 |
120 Days |
365 Days |
- |
719 |
CORAL INVESTMENTS PRIVATE LIMITED |
Asareege, GDh. Vaadhoo |
Local |
CONSTRUCTION OF RAINWATER HOLDING TANK, TREATED WATER HOLDING TANK, DEGASIFIER FOUNDATION, RAINWATER HOLDING TANK, RAIN WATER LIFT WELL, BRINE WATER TANK & PUMP ROOM AT B. MAALHOS |
Government |
GC01 & GC02 |
B. Maalhos |
13-Feb-22 |
110 Days |
365 Days |
- |
720 |
BADHAHI INVESTMENT GROUP PVT LTD |
M. Zubaidhaa Manzil, Handhuvaree Hingun, K. Male' |
Local |
CONSTRUCTION OF 3 STOREY RESIDENTIAL BUILDING AT M. THREE FLOWERS |
Private |
GC01 |
M. Three Flowers |
1-Mar-22 |
78 Days |
- |
- |
721 |
ALTEC MALDIVES PRIVATE LIMITED |
H.Alihuras, Lonuziyaarai Magu, Male' |
Local |
DESIGN AND BUILD OF PROVISION OF WATER SUPPLY AND SEWERAGE FACILITIES IN DH.RINBUDHOO - LOT 8 |
Government |
UC01 |
Dh.Rinbudhoo |
18-Mar-21 |
26 Months |
365 Days |
- |
722 |
FENMULI CONSTRUCTIONS PRIVATE LIMITED |
H.Shark, Mustharee Magu, Male' |
Local |
CONSTRUCTION OF 6 STOREY BUILDING WITH TERRACE AT H. GLISTER |
Private |
GC01 |
H. Glister |
20-Feb-22 |
8 Months |
12 Months |
- |
723 |
INNF CONSTRUCTION COMPANY PVT LTD |
G.Finivilu, Dhomaidharaadha Higun, Male' |
Local |
FOUNDATION WORKS, CONCRETE WORKS OF TWO SLABS, FINISHING WORKS GROUND FLOOR, CONCRETE & MASONARY WORKS OF FIRST FLOOR OF THE 8 STOREY BUILDING . MADHEEHA MANZIL |
Private |
GC01 |
M. Madheeha Manzil |
9-Mar-22 |
6 Months |
214 Days |
- |
724 |
RUBIX PRIVATE LIMITED |
M.Kudaveyomatheege, Sabdheli magu, Male' |
Local |
CONSTRUCTION OF RO BUILDING AT GDH.FIYORI |
Government |
GC01 |
Gdh.Fiyoari |
1-Dec-21 |
120 Days |
12 Months |
- |
725 |
PROGRESS CONSTRUCTION COMPANY PRIVATE LIMITED |
H.Sosun Mead, 2nd Floor,B1, Male' |
Local |
CONSTRUCTION OF 4 STOREY BUILDING AT SINAMON.SH.MILANDHOO |
Private |
GC01 |
Sinamon, Sh.Milandhoo |
26-Dec-21 |
2 years |
6 Months |
- |
726 |
ATYZ CONSTRUCTION |
G.Green Beans, Raadhafathi Higun, K.Male' |
Local |
CONCRETE WORKS OF 06TH 7TH & 8TH FLOOR Of THE 10 STOREY BUILDING AT MA.WHITE VIEW |
Private |
GC01 |
Ma. White View |
3-Mar-22 |
110 days |
365 Days |
- |
727 |
IBB PRIVATE LIMITED |
1st Floor , M. Sunny View, Izzudheen Magu, K.Male' |
Local |
CONSTRUCTION WORKS OF FENAKA NEW OFFICE AT R. RASGATHEEMU |
Government |
GC01 |
R. Rasgatheemu |
15-Dec-20 |
50 Days |
- |
- |
728 |
AFAMI MALDIVES PRIVATE LIMITED |
M.Lilly Pool, 2nd Floor |
Local |
CONSTRUCTION OF N. MANADHOO MOSQUE |
Government |
GC01 |
N. Manadhoo |
9-Mar-22 |
365 Days |
365 Days |
- |
729 |
WHITE CRESCENT PRIVATE LIMITED |
Machangoalhi, Merry Glory 2B, Sayyid Kilegefaanu Magu, Male' |
Local |
CONSTRUCTION OF 10TH FLOOR OF M. GOLDEN SPARK/ SEALINE |
Private |
GC01 |
M. Golden Spark/Sealine |
9-Mar-22 |
8 Months |
90 Days |
- |
730 |
WAVE LENGTH PVT LTD |
Reendhoomaage, Ameenee magu, Hdh.Kulhudhuffushi |
Local |
CONSTRUCTION WORKS OF 3 STOREY BUILDING AT SH. NARUDHOO SCHOOL |
Government |
GC01 |
Sh. Narudhoo |
7-Jul-21 |
365 Days |
365 Days |
- |
731 |
WAVE LENGTH PVT LTD |
Reendhoomaage, Ameenee magu, Hdh.Kulhudhuffushi |
Local |
CONSTRUCTION WORKS OF 12 CLASSROOM AT HDH. KUMUNDHOO SCHOOL |
Government |
GC01 |
HDh. Kumundhoo |
13-Jan-22 |
365 Days |
365 Days |
- |
732 |
WAVE LENGTH PVT LTD |
Reendhoomaage, Ameenee magu, Hdh.Kulhudhuffushi |
Local |
CONSTRUCTION WORKS OF 12 CLASSROOMS & OFFICE BUILDING AT HA. ATOLL EDUCATION CENTER |
Government |
GC01 |
HA. Didhoo |
7-Jul-21 |
365 Days |
365 Days |
- |
733 |
WAVE LENGTH PVT LTD |
Reendhoomaage, Ameenee magu, Hdh.Kulhudhuffushi |
Local |
CONSTRUCTION OF HDH. HIRIMARADHOO MOSQUE |
Government |
GC01 |
HDh. Hirimaradhoo |
20-Jan-22 |
365 Days |
365 Days |
- |
734 |
W CONSTRUCTION COMPANY PRIVATE LIMITED |
3rd Floor, H.Sheesha Vehi, Muthee Goalhi,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT MA. LUNBOAGE (WITH TERRACE) |
Government |
GC01 |
Ma. Lunboage |
15-Mar-22 |
12 Months |
6 Months |
- |
735 |
WAVE LENGTH PVT LTD |
Reendhoomaage, Ameenee magu, Hdh.Kulhudhuffushi |
Local |
RENNOVATION WORKS OF 3 STOREY CLASSROOM BLOCK, AUDITORIUM BUILDING, SUPPLY AND COMPLETE FABRICATION OF INTER-CONNECTION BRIDGE AT HDH. KULHUDHUFFUSHI MNU CAMPUS |
Private |
GC01 |
HDh. Kulhudhuffushi |
20-Jan-22 |
109 Days |
365 Days |
- |
736 |
MAZIYA CONSTRUCTION PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
CONSTRUCTION OF 6 STOREY BUILDING WITH TERRACE AT HULHUMALE LOT 10141 |
Private |
GC01 |
Hulhumale Lot 10141 |
10-Feb-22 |
150 Working Days |
365 Days |
- |
737 |
SJ CONSTRUCTION PVT LTD |
Ma.Naseenee Handhuvaru, Male' |
Local |
CONSTRUCTION OF MOSQUE IN HULHUMALE' PHASE II |
Government |
GC01 |
Hulhumale Phase II |
1-Mar-22 |
427 Days |
365 Days |
- |
738 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 3 STOREY CAFÉ COURT WITH TERRACE AT HULHUMALE' LOT 11617(N3-15) |
Private |
GC01 |
HULHUMALE' LOT 11617(N3-15) |
15-Dec-21 |
15 Months |
365 Days |
- |
739 |
WAVE LENGTH PVT LTD |
Reendhoomaage, Ameenee magu, Hdh.Kulhudhuffushi |
Local |
PROVIDING LABOUR & EQUIPMENT SERVICES FOR SEWER NETWORK & PUMPING MAIN PIPE LAYING AT HA. THAKANDHOO |
Government |
UC01 |
Ha.Thakandhoo |
14-Dec-21 |
136 Days |
365 Days |
- |
740 |
WAVE LENGTH PVT LTD |
Reendhoomaage, Ameenee magu, Hdh.Kulhudhuffushi |
Local |
PROVIDING LABOUR & EQUIPMENT SERVICES FOR SEWER NETWORK & PUMPING MAIN PIPE LAYING AT SH. GOIDHOO |
Government |
UC01 |
Sh. Goidhoo |
13-Dec-21 |
146 Days |
365 Days |
- |
741 |
D.F.H INVESTMENT |
H. Bright Corner, Sandhubarag goalhi |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H. BRIGHT CORNER |
Private |
GC01 |
H. Bright Corner |
15-Sep-21 |
1440 Days |
- |
- |
742 |
ATLAS BUILDERS PRIVATE LIMITED |
DMK Building, Chandhanee Magu, Male' |
Local |
CONCRETE AND FINISHING WORKS OF 6 STOREY BUILDING V. MATHODAA |
Private |
GC01 |
V. Mathodaa |
15-Mar-22 |
12 Months |
6 Months |
- |
743 |
RIGHT MALDIVES PRIVATE LIMITED |
Ithaa, Feeroazu magu, B. Kamadhoo, |
Local |
CONSTRUCTION OF 3 STOREY BUILDING AT ITHAA, B. KAMADHOO |
Private |
GC01 |
Ithaa, B. Kamadhoo |
1-Apr-22 |
30 Months |
12 Days |
- |
744 |
WAVE LENGTH PVT LTD |
Reendhoomaage, Ameenee magu, Hdh.Kulhudhuffushi |
Local |
PROVIDING LABOUR & EQUIPMENT SERVICES FOR CONSTRUCTION OF SEWERAGE PUMPING STATIONS - PS1/DPS,PS2,PS3,PS4&PS5 AT HDH. KUMUNDHOO |
Government |
UC01 |
HDh. Kumundhoo |
4-Jan-22 |
158 Days |
365 Days |
- |
745 |
WAVE LENGTH PVT LTD |
Reendhoomaage, Ameenee magu, Hdh.Kulhudhuffushi |
Local |
PROVIDING LABOUR & EQUIPMENT SERVICES FOR WATER & RAIN WATER NETWORK PIPE LAYING AT HA. THAKANDHOO |
Government |
UC01 |
Ha. Thakandhoo |
2-Jan-22 |
120 Days |
365 Days |
- |
746 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H. ZAAHAM |
Private |
GC01 |
H. Zaaham |
1-Mar-22 |
18 Months |
- |
- |
747 |
INTARC MALDIVES PRIVATE LIMITED |
G.Medhumaage, Buruzu Magu, Male' |
Local |
CONCRETE WORKS OF 3RD AND 4TH FLOOR OF H. AIRAA |
Private |
GC01 |
H. Airaa |
1-Mar-22 |
92 Days |
3 Months |
- |
748 |
BAUM PRIVATE LIMITED |
H. Hilton, Seesan Goalhi, Male' |
Local |
CONSTRUCTION OF 7 STOREY BUILDING H. VEHPPILAA MAA |
Private |
GC01 |
H. Vehppilaage |
2-Mar-22 |
24 Months |
6 Months |
- |
749 |
COASTAL ENGINEERING SOLUTIONS PRIVATE LIMITED |
3F, Reef Residence, Irudheyma Hingun, Hulhumale |
Local |
CONSTRUCTION OF MOSQUE IN HDH. HANIMAADHOO |
Government |
GC01 |
HDh. Hanimaadhoo |
6-Mar-22 |
365 Days |
365 Days |
- |
750 |
ALIA CONSTRUCTION PVT LTD |
3th Floor,M. Alia Building, Gandha koalhi Magu, Male' |
Local |
CONSTRUCTION OF 6 STOREY BUILDING WITH TERRACE AT HULHUMALE' LOT NO: 11055 |
Private |
GC01 |
Hulhumale' Lot No: 11055 |
22-Aug-20 |
915 Days |
365 Days |
- |
751 |
MUNI ENTERPRISES PRIVATE LIMITED |
Muni Building, 5th Floor , M.Loobiyaa 20319, Ameenee Magu, Male' |
Local |
CONSTRUCTION OF MOSQUE AT HULHUMALE' PHASE 2, PLOT N5-19 |
Government |
GC01 |
Hulhumale' Phase 2, Lot N5-19 |
8-Feb-22 |
24 Months |
- |
- |
752 |
W CONSTRUCTION COMPANY PRIVATE LIMITED |
3rd Floor, H.Sheesha Vehi, Muthee Goalhi,Male' |
Local |
CONCRETE AND FINISHING WORK FROM 4TH FLOOR TILL TERRACE FLOOR OF 10 STORE BULDING AT G. MAAVAS |
Private |
GC01 |
G. Maavas, K. Male' |
15-Mar-22 |
12 Months |
6 Months |
- |
753 |
ATTOLLO CONSTRUCTION PRIVATE LIMITED |
3B, H. Valhufehi, Buruzu Magu, Male' |
Local |
CONSTRUCTION OF 2 STOREY BUILDING AT MAALHUVELI (DHADIMAGU), GN. FUVAH MULAH |
Private |
GC01 |
Maalhuveli (Dhadimagu)،GN. Fuvah mulah |
16-Feb-22 |
26 Months |
12 Months |
- |
754 |
SWIFT ENGINEERING PTE LTD |
1st Floor, G.Meerange, Bodurasgefaanu Magu, Male' |
Local |
CONSTRUCTION OF 08 CLASSROOMS AND MULTIPURPOSE HALL AT N. MILANDHOO HIDHAYA SCHOOL |
Government |
GC01 |
N. Milandhoo, Hidhaya School |
26-Feb-22 |
365 Days |
365 Days |
- |
755 |
SWIFT ENGINEERING PTE LTD |
1st Floor, G.Meerange, Bodurasgefaanu Magu, Male' |
Local |
CONSTRUCTION OF 15 CLASSROOMS SH. FUNADHOO SCHOOL |
Government |
GC01 |
Sh. Funadhoo |
5-Feb-22 |
360 Days |
365 Days |
- |
756 |
INNF CONSTRUCTION COMPANY PVT LTD |
G.Finivilu, Dhomaidharaadha Higun, Male' |
Local |
FOUNDATION WORKS AND CONCRETE WORKS FROM 4TH FLOOR TO 10TH FLOOR WITH TERRACE OF MA. THARAADHU |
Private |
GC01 |
Ma. Tharaadhu |
23-Mar-22 |
15 Months |
12 Months |
- |
757 |
SUN CONSTRUCTION AND ENGINEERING PVT LTD |
H.Sun Siyam Building,Boduthakurufaanu Magu,Male' |
Local |
CONSTRUCTION OF 197 ROOMS AND OTHER SUPPORT STRUCTURES AT OLHUVELI BEACH AND SPA MALDIVES PHASE 4 (ROMANCE ISLAND) |
Private |
GC01 |
Romance Island, Sun Siyam Olhuveli Maldives |
1-Mar-22 |
486 Days |
365 Days |
- |
758 |
ARTE'FFICIO DESIGN-BUILD PRIVATE LIMITED |
H.Shady Mead, Mustharee Magu, Male' |
Local |
CONSTRUCTION OF 12 STOREY BUILDING AT G. SHAAMIL |
Private |
GC01 |
G. Shaamil |
1-Apr-22 |
11 Months |
11 Months |
- |
759 |
WELL TRADING PRIVATE LIMITED |
Gaakoshi A210, Buruzu magu, Male, |
Local |
CONSTRUCTION OF 04 CLASS ROOMS AT N.ATOLL EDUCATION CENTER |
Private |
GC01 |
N. Atoll Education Center |
19-Mar-22 |
120 Days |
- |
- |
760 |
WELL TRADING PRIVATE LIMITED |
Gaakoshi A210, Buruzu magu, Male, |
Local |
CONSTRUCTION OF 04 CLASS ROOM BUILDING AT R. DHUVAAFARU PRIMARY SCHOOL |
Private |
GC01 |
R.Dhuvaafaru |
20-Jan-22 |
150 Days |
- |
- |
761 |
K.I.M GROUP PRIVATE LIMITED |
M.Fathaha,Fandiyaaru Magu,Male |
Local |
CONSTRUCTION FROM 4TH FLOOR TO 10TH FLOOR WITH TERRACE OF 10 STOREY BUILDING AT G.TINUVEHI (SUBCONTRACTED BY LAND BUILDERS PRIVATE LIMITED (C-740/2008)) |
Private |
GC01 |
G.Tinuvehi, Male' |
1-Apr-22 |
24 Months |
02 Months |
- |
762 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
DEVELOPMENT OF COMMERCIAL BUILDING IN HULHUMALE' LOT 11622 |
Private |
GC01 |
Hulhumale' Lot 11622 |
17-Feb-22 |
18 Months |
360 Days |
- |
763 |
NORTH COAST CONTRACTORS PRIVATE LIMITED |
H.Fusthulaamaage, Ameeru Ahmed Magu,Male' |
Local |
CONSTRUCTION OF N. MANADHOO POILCE STATION |
Government |
GC01 |
N. Manadhoo |
30-Mar-22 |
365 Days |
365 Days |
- |
764 |
MIMS CONSTRUCTION PVT LTD |
1st Floor, G.Meerange, Bodurasgefaanu Magu,Male' |
Local |
CONSTRUCTION OF 03 STOREY BUILDING AT N. ATOLL SCHOOL |
Government |
GC01 |
N. Manadhoo |
23-Jan-22 |
365 Days |
365 Days |
- |
765 |
BEIJING ZRGW AVIATION ENGINEERING CO.LTD |
M.Tharaanaage, Muranga Magu, Male' |
Local |
DESIGN BUILD AND TURNKEY PROJECT TO ESTABLISH A NEW POWER HOUSE AT FUVAHMULAH CITY WITH MV GRID REHABILITATION |
Government |
GC01 |
Gn. Fuvahmulah |
17-Feb-22 |
12 Months |
02 Months |
- |
766 |
MATHU MALDIVES PRIVATE LIMITED |
Ma. Dhaharaavilla, 5th Floor, Chandhanee Magu, Male' |
Local |
CONSTRUCTION OF 5 STOREY BUILDING AT MAAVAHARU, S. FEYDHOO |
Private |
GC01 |
Maavaharu, S. Feydhoo |
25-Mar-22 |
24 Months |
- |
- |
767 |
HILLSIDE VILLA PRIVATE LIMITED |
4th floor,Jazeera Building,Boduthakurufaanu Magu,Male' |
Local |
2 BEDROOM BEACH CRUSOE VILLA WITH POOL , 3 BED ROOM BEACH CRUSOE VILLA WITH POOL , MARINE EDUCATION CENTRE /DEN TURTLE CENTRE, HOST SWIMMING POOL, SPA ON LAND I SONEVA JANI RESORT |
Private |
GC01 |
N. Medhufaru |
15-Jul-21 |
523 Days |
3 Months |
- |
768 |
WELL TRADING PRIVATE LIMITED |
Gaakoshi A210, Buruzu magu, Male, |
Local |
CONSTRUCTION OF 04 CLASS ROOMS AT H.DH NEYKURENDHOO SCHOOL |
Government |
GC01 |
Hdh. Neykurendhoo |
27-Mar-22 |
140 Days |
- |
- |
769 |
WELL TRADING PRIVATE LIMITED |
Gaakoshi A210, Buruzu magu, Male, |
Local |
CONSTRUCTION OF 04 CLASSROOMS AT ADH.FENFUSHI SCHOOL |
Government |
GC01 |
ADh. Fenfushi |
25-Jan-22 |
140 Days |
- |
- |
770 |
NUEMARK PRIVATE LIMITED |
H.Merry Side, 4th Floor, Boduthakuru Faanu Magu, Male' |
Local |
DEVELOPMENT OF MIXED USE RESIDENTIAL COMPLEXES AT HULHUMALE, PLOT C1-2 |
Private |
GC01 |
Hulhumale Plot C1-2 |
19-Aug-21 |
24 Months |
12 Months |
- |
771 |
GREEN UNIVERSAL PRIVATE LIMITED |
Daily Work, Ha.Filladho |
Local |
CONSTRUCTION OF NEW POWERHOUSE BUILDING AT GDH. RATHAFANDHOO- REMAINING WORKS |
Government |
GC01 |
GDh. Rathafandhoo |
7-Apr-22 |
180 Days |
- |
- |
772 |
FENMULI CONSTRUCTIONS PRIVATE LIMITED |
H.Shark, Mustharee Magu, Male' |
Local |
FINISHING WORKS OF 5TH FLOOR & CONCRETE WORKS OF 5TH FLOOR SHEET OF 10 STOREY BUILDING AT H. AAROSHAN |
Private |
GC01 |
H. Aaroshan |
1-Apr-22 |
04 Months |
6 Months |
Terminated on 25th May 2022 |
773 |
GREEN UNIVERSAL PRIVATE LIMITED |
Daily Work, Ha.Filladho |
Local |
GDH. FIYOREE DEGROOM EXTENSION WORKS |
Government |
GC01 |
GDh. Fiyoree |
7-Apr-22 |
150 Days |
- |
- |
774 |
ROTIME ENGINEERING AND TECHNOLOGY CO.LTD
|
RM 1501(669), FSPACTR 53-55, Wanchai Lockatrd, Hong Kong |
Local |
DEVELOPMENT OF CO-LIVING HOUSING IN HULHUMALE' PHASE II |
Government |
GC01 |
Hulhumale' Phase II |
15-Feb-22 |
900 Days |
12 Months |
- |
775 |
ALKE ALKATAS JOINT VENTURE PRIVATE LIMITED |
H.Moomiyaage, Asaree Hingun, Male' |
Foreign |
ENGINEERING PROCUMENT AND CONSTRUCTION OF THE WASTE TO ENERGY FACILITY IN K.THILAFUSHI - SUBCONTRACTOR OF URBASAR S.A (FC00242021) |
Government |
GC01 |
K. Thilafushi |
2-Mar-22 |
42 Months |
24 Months |
- |
776 |
CONSYNC PRIVATE LIMITED |
M. Dhekunuthila, Sabudhelimagu, K. Male' |
Local |
CONSTRUCTION WORKS OF REMINING 6 FLOORS FROM 4TH FLOOR OF 10 STOREY BUILDING H. SILVERNIGHT |
Private |
GC01 |
H. Silvernight |
5-Apr-22 |
2 Years |
360 Days |
- |
777 |
INFINITY BUILDERS |
H.Happy Villa, Violet Magu, Male' |
Local |
FOUNDATION WORKS & CONSTRUCTIONT OF 6 FLOORS AT 10 STOREY BUILDING M. VILUFUSHEEGE |
Private |
GC01 |
M. Vilufushi |
1-Apr-22 |
18 Months |
6 Months |
- |
778 |
OCEAN GATE PRIVATE LIMITED |
Februareege, Miskihmagu, Ghaazee magu, Gn. Fuvahmulah |
Local |
CONSTRUCTION WORKS OF NEW FENAKA OFFICE HA. IHAVANDHOO |
Private |
GC01 |
HA. Ihavandhoo |
21-Oct-20 |
585 Days |
12 Months |
- |
779 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
FOUNDATION WORKS AND FINISHING WORKS FROM GROUND TO THIRD FLOOR OF 9 STOREY BUILDING VERAVALIHIYAA, S. HITHADHOO |
Private |
GC01 |
S. Hithadhoo, Veravalihiyaa |
20-Mar-22 |
14 Months |
365 Days |
- |
780 |
PEARL MILLET CONSTRUCTION PRIVATE LIMITED |
2nd Floor, H.Kandoomaage, Apt 2, Mushtharee Magu, Male' |
Local |
CONSTRUCTION OF 5 STOREY BUILDING AT H. EBOODHOOGE |
Private |
GC01 |
H. Eboodhooge |
15-May-22 |
2 Years |
1 years |
- |
781 |
DEL GRAND PRIVATE LIMITED
|
Ground Floor,H.Del Rio, Raiyy Villa Higun |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT G. SUNDACE
|
Private |
GC01 |
G. Sundace
|
18-Jan-22 |
16 Months
|
1 years |
- |
782 |
PAWAREY INVESTMENT PRIVATE LIMITED |
179, Thilafush, Male' |
Local |
CONSTRUCTION OF MULTIPURPOSE HALL AT TH.MADIFUSHI SCHOOL
|
Government |
GC01 |
Th. Madifushi |
1-May-22 |
330 Days |
365 Days |
- |
783 |
KULUNU CONSTRUCTION PRIVATE LIMITED |
Hiyaa, Nahuza Magu, B. Hithaadhoo |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT HIYAA, B. HITHAADHOO |
Private |
GC01 |
Hiyaa, B. Hithaadhoo |
1-Jun-22 |
10 Years |
6 Months |
- |
784 |
TRUSTENG MALDIVES PRIVATE LIMITED |
Lot10541,Filigas Magu,Male |
Local |
CONSTRUCTION OF TINKERING BUILDING AT MALE' COMMERCIAL HARBOUR AREA |
Government |
GC01 |
Male' |
17-Apr-22 |
120 Days |
- |
- |
785 |
TRUSTENG MALDIVES PRIVATE LIMITED |
Lot10541,Filigas Magu,Male |
Local |
DESIGN AND BUILD OF OFFICE BUILDING, STAFF ACCOMMODATION AND WORKSHOP AT K. THILAFUSHI |
Government |
GC01 |
K. Thilafushi |
17-Apr-22 |
210 Days |
- |
- |
786 |
TRUSTENG MALDIVES PRIVATE LIMITED |
Lot10541,Filigas Magu,Male |
Local |
CONSTRUCTION OF 06 STOREY OFFICE BUILDING AT HULHUMALE' LOT 10180 |
Private |
GC01 |
Hulhumale' Lot 10180 |
1-Sep-21 |
24 Months |
- |
- |
787 |
VARINDERA CONSTRUCTION LIMITED |
408-409, Suneja Tower, District Center, Janak Puri, New Dheli, 110058, India |
Local |
CONSTRUCTION OF 632 (3BHK) SOCIAL HOUSING UNITS IN HULHUMALE (PKG -III)- SUB-CONTRACTOR OF NBCC (INDIA) LIMITED ( FC00042021) |
Private |
GC01 |
Hulhumale' |
6-Mar-22 |
24 Months |
12 Months |
- |
788 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF ALL CIVIL WORK AND FINISHING WORKS AT MARINA (BACK OF THE HOUSE) ISLAND (GULHIGAATHU HURAA), ANANTARA DHIGU VELI |
Resort |
GC01 |
Anantara Veli and Naladu Private Island |
24-Apr-22 |
9 Months |
12 Months |
- |
789 |
ABC CONSTRUCTION PVT LTD |
1st Floor,G.Niooranfini, Kalhuhura Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUIDING AT G. VAIJEHEYGE AAGE 1 (PHASE 2) |
Private |
GC01 |
G. Vaijeheyge Aage 1
|
15-Apr-22 |
04 Months
|
- |
- |
790 |
AIM CONSTRUCTION PRIVATE LIMITED |
Ma.Ever Bright,Dhidhi Goalhi, Male' |
Local |
CONSTRUCTION OF MULTI PURPOSE HALL AT HDH. MAKUNUDHOO SCHOOL |
Government |
GC01 |
HDh. Makunudhoo |
20-Apr-22 |
365 Days |
365 Days |
- |
791 |
TRUSTENG MALDIVES PRIVATE LIMITED |
Lot10541,Filigas Magu,Male |
Local |
CONSTRUCTION OF COVERED WORKSHOP AT MALE' COMMERCIAL HARBOUR AREA |
Government |
GC01 |
Male' |
17-Apr-22 |
95 Days |
- |
- |
792 |
INNF CONSTRUCTION COMPANY PVT LTD |
G.Finivilu, Dhomaidharaadha Higun, Male' |
Local |
CONSTRUCTION OF 3RD FLOOR TO 10TH FLOOR OF 10 STOREY BUILDING WITH TERRACE AT M. INDIGO |
Private |
GC01 |
M. Indigo |
2-May-22 |
1094 Days |
- |
- |
793 |
VIEW CONSTRUCTION PRIVATE LIMITED |
G. New Sharaaz, Bodurasgefaanu Magu |
Local |
CONCRETE STRUCTURE WORKS OF 8TH, 9TH & 10TH FLOOR OF 10 STOREY BUILDING M. FEILD DAISY |
Private |
GC01 |
M. Field Daisy |
1-May-22 |
6 Months |
2 Months |
- |
794 |
KD ENTERPRISES PRIVATE LIMITED |
3rd Floor, M.Asurumaa View, Orchid Magu, Male' |
Local |
CONSTRUCTION OF FENAKA NEW OFFICE BUILDING AT HDH. NOLHIVARAM |
Private |
GC01 |
HDh. Nolhivaram |
3-May-22 |
180 Days |
180 Days |
- |
795 |
R & F CONSTRUCTION PRIVATE LIMITED |
Husnoo Villa, Valumiski Magu,S.Maradhoo |
Local |
CONSTRUCTION OF 02 STOREY BUILDING AT AREEJ, S. HITHADHOO |
Private |
GC01 |
Areej, S.Hithadhoo |
1-Jan-21 |
720 Days |
5 Years |
- |
796 |
W CONSTRUCTION COMPANY PRIVATE LIMITED |
3rd Floor, H.Sheesha Vehi, Muthee Goalhi,Male' |
Local |
FOUNDATION WORKS AND CONSTRUCTION WORKS FORM GROUND FLOOR AND FIRST FLOOR OF 4 STOREY BUILDING AT M. FASHION MEAD |
Private |
GC01 |
M. Fashion Mead |
1-Apr-22 |
105 Days |
6 Months |
- |
797 |
GLOBIN PRIVATE LIMITED |
H. Reethi Maakoani, Sosan Magu, Mlae' |
Local |
CONSTRUCTION WORK OF 10 STORY BUILDING AT H. SOASAN MEAD |
Private |
GC01 |
H. Soasan Mead |
15-Sep-20 |
1329 Days |
6 Months |
- |
798 |
PAWAREY INVESTMENT PRIVATE LIMITED |
179, thilafush, Male' |
Local |
CONSTRUCTION OF 2 CLASSROOM, LAB & ICT BLOCK AT GDH. HOADEDHOO SCHOOL |
Government |
GC01 |
GDh. Hoadedhoo |
1-May-22 |
365 Days |
365 Days |
- |
799 |
PAWAREY INVESTMENT PRIVATE LIMITED |
179, thilafush, Male' |
Local |
CONSTRUCTION OF 2 STOREY BUILDING AT M. NAALAAFUSHI SCHOOL |
Government |
GC01 |
M. Naalaafushi |
1-May-22 |
365 Days |
365 Days |
- |
800 |
FAF CONSTRUCTION & TRADING PRIVATE LIMITED |
Ma.Foniluboage, Kurikeela Magu, Male' |
Local |
FOUNDATION WORKS, CONCRETE WORKS AND FINISHING WORKS FROM GROUND FLOOR TO FIRST FLOOR OF THE 10 FLOOR BUILDING AT H.SAAM |
Private |
GC01 |
H.Saam |
1-May-22 |
8 Months |
- |
- |
801 |
W CONSTRUCTION COMPANY PRIVATE LIMITED |
3rd Floor, H.Sheesha Vehi, Muthee Goalhi,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H. BARABOAMAAGE |
Private |
GC01 |
H. Baraboamaage |
14-Apr-22 |
95 Days |
6 Months |
- |
802 |
INTARC MALDIVES PRIVATE LIMITED |
G.Medhumaage, Buruzu Magu, Male' |
Local |
CONCRETE WORKS OF 2ND FLOOR TO ROOF LEVEL AND FINISHING WORKS OF THE 6 STOREY AT BUILDING HULHUMALE' LOT 11259 |
Private |
GC01 |
Hulhumale' Lot 11259 |
1-Jun-22 |
25 Months |
3 Months |
- |
803 |
INTARC MALDIVES PRIVATE LIMITED |
G.Medhumaage, Buruzu Magu, Male' |
Local |
CONCRETE WORKS FROM 5TH,TO 8TH FLOOR SLABS AND LIFT ROOF SLAB OF 8 STOREY BUILDING H. AIRAA |
Private |
GC01 |
H. Airaa |
1-May-22 |
7 Months |
3 Months |
- |
804 |
COASTAL ENGINEERING SOLUTIONS PRIVATE LIMITED |
3F, Reef Residence, Irudheyma Hingun, Hulhumale |
Local |
CONSTRUCTION OF HEALTH CENTER EXTENSION BUILDING AT B. KENDHOO |
Private |
GC01 |
B. Kendhoo |
7-Apr-22 |
125 Days |
6 Months |
- |
805 |
COASTLINE PILING& CONSTRUCTION PRIVATE LIMITED |
M.Irufuheyge, Maaveyo Magu, Male' |
Local |
CONSTRUCTION OF 11 FLOOR BUILDING AT M.THULHAADHOOGE |
Private |
GC01 |
M.Thulhaadhooge |
15-May-19 |
1859 Days |
12 Months |
- |
806 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
DESIGN, SUPPLYING AND INSTALLATION OF AIRPORT PERIMETER SECURITY INFRASTRUCTURE AT VELANA INTERNATIONAL AIRPORT |
Private |
GC01 |
Velana International Airport |
28-May-22 |
205 Days |
365 Days |
- |
807 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION OF 14 STOREY BUILDING AT M. SAINA |
Private |
GC01 |
M. Saina |
19-April-22 |
15 Months |
- |
- |
808 |
HOMEBASE INVESTMENT PRIVATE LIMITED |
G.Revi, Lonu ziyaaraiy magu, Male' |
Local |
CONSTRUCTION OF 3 STOREY BUILDING AT H. VELASFARUGE AAGE |
Private |
GC01 |
H. Velasfaruge Aage |
1-Jun-22 |
30 Months |
01 Months |
- |
809 |
ATOLL ARCH PRIVATE LIMITED |
2nd Floor, H.Melaim, Boduthakurufaanu Magu, Male' |
Local |
CONCERET WORKS OF 6TH FLOOR AND ROOF SLAB OF THE 8 STOREY BUILDING MA. RADHUMAA |
Private |
GC01 |
MA. Radhumaa |
5-Apr-22 |
6 Months |
01 Months |
- |
810 |
ARISON MALDIVES PRIVATE LIMITED |
Hulhumale Flat 54-01-04 |
Local |
CONCRETE WORK OF 5TH FLOOR, 6TH FLOOR, 7TH FLOOR AND ROOF FLOOR OF THE 08 STOREY BUILDING AT H. KIWILODGE |
Private |
GC01 |
H. Kiwilodge |
5-May-22 |
110 Days |
- |
- |
811 |
ONE REALTY PRIVATE LIMITED |
3rd floor, Ma,Fas Eri, Ameenee Magu, Male' |
Local |
FOUNDATION WORKS AND CONSTRUCTION WORKS OF 10 STOREY BUILDING AT MA. ROSE BERRY |
Private |
GC01 |
Ma. Rose Berry |
10-May-22 |
1095 Days |
12 Months |
- |
812 |
H.A CONSTRUCTION PRIVATE LIMITED |
2nd Floor,H.Fairview,Sihka Goalhi,Male' |
Local |
FOUNDATION WORKS AND CONCRETE WORKS OF 05 STOREY OF THE 10 STOREY BUILDING AT M.BURADHUMAAGE |
Private |
GC01 |
M.Buradhamaage |
26-Apr-22 |
8 Months |
- |
- |
813 |
KNOCK DOWN PRIVATE LIMITED |
M. Fathaha, Fandiyaaru Magu, 'Male |
Local |
CONCRETE WORK OF 3RD FLOOR TO 10TH FLOOR OF THE 10 STOREY RESIDENTIAL BUILDING AT G. FLYING |
Private |
GC01 |
G. Flying |
1-May-22 |
24 Months |
06 Months |
- |
814 |
AIM CONSTRUCTION PRIVATE LIMITED |
Ma.Ever Bright,Dhidhi Goalhi, Male' |
Local |
CONSTRUCTION OF MULTIPURPOSE HALL AT R. INNAMAADHOO SCHOOL |
Government |
GC01 |
R. Innamaadhoo |
20-Apr-22 |
325 Days |
365 Days |
- |
815 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONCRETE AND FINISHING WORKS OF 3RD AND 4TH FLOOR AND LIFT INSTALALTION OF 6 STOREY BUILDING AT M. AHI |
Private |
GC01 |
M. Ahi |
10-May-22 |
05 Months |
- |
- |
816 |
K AND F HOLDINGS PRIVATE LIMITED |
M.Hanifaru, Fareedhee Magu, Male' |
Local |
CONSTRUCTION OF 2 STOREY BUILDING AT HA. MAARANDHOO SCHOOL |
Private |
GC01 |
HA. Maarandhoo |
1-Jun-22 |
200 Days |
365 Days |
- |
817 |
FENMULI CONSTRUCTIONS PRIVATE LIMITED |
V.Kiyoto, Veshi Magu, Villimale |
Local |
FINISHING WORKS OF 5TH FLOOR & CONCRETE WORKS OF 6TH FLOOR SLAB OF 10 STOREY BUILDING AT H. AAROSHAN |
Private |
GC01 |
H. Aaroshan |
1-Apr-22 |
04 Months |
6 Months |
- |
818 |
MAZIYA SERVICES PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
FOUNDATION WORKS, CONCRETE WORKS OF FIRST 4 SLABS AND FINISHING WORKS OF GROUND FLOOR, FIRST FLOOR, SECOND FLOOR AND THIRD FLOOR OF 10 STOREY BUILDING MA. MERRY GLOW |
Private |
GC01 |
Ma. Merry Glow |
1-Apr-22 |
12 Months |
6 Months |
- |
819 |
PLUTONIUM HOLDINGS PRIVATE LIMITED |
M.Anbumaage, Naseemee hingun,K.Male' |
Local |
CONCRETE WORKS OF 4TH,5TH AND 6TH FLOOR SLAB OF THE 05 STOREY BUILDING WITH TERRACE FLOOR AT M.HONEY VILLA |
Private |
GC01 |
M. Honey Villa |
22-Apr-22 |
04 Months |
- |
- |
820 |
VARINDERA CONSTRUCTION LIMITED |
408-409, Suneja Tower, District Center, Janak Puri, New Dheli, 110058, India |
Local |
CONSTRUCTION OF 768 (3BHK) SOCIAL HOUSING UNITS IN HULHUMALE (PKG -II)- SUB-CONTRACTOR OF NBCC (INDIA) LIMITED ( FC00042021) |
Private |
GC01 |
Hulhumale' |
14-Apr-22 |
24 Months |
12 Months |
- |
821 |
TAG CONSTRUCTION & SUPPLY PRIVATE LIMITED |
Hulhumale Ferry Terminal, Boduthakurufaanu Magu, K. Male' |
Local |
CONCRETE WORKS OF 5TH & 6TH SLAB OF THE 10 STOREY BUILDING AT H. MARATHON |
Private |
GC01 |
H. Marathon |
1-Apr-22 |
6 Months |
6 Months |
- |
822 |
PLATINUM CONTRACTORS PRIVATE LIMITED |
Malawi, Kashinari Higun, Hothadhoo, Addu City |
Local |
CONSTRUCTION OF 1 STOREY BUILDING AT DILFIZAA, S. HITHADHOO |
Private |
GC01 |
Dilfizaa, S. hithadhoo |
15-Apr-22 |
12 Months |
18 Months |
- |
823 |
ALCAZAR PRIVATE LIMITED |
H.Dhubugas Dhoshuge, kurathi Goalhi, Male' |
Local |
CONTINUATION WORKS AT POLCO TOWER C |
Private |
GC01 |
Polco Tower C, Hulhumale |
15-Mar-22 |
180 Days |
365 Days |
- |
824 |
FOUR WHEEL PRIVATE LIMITED |
Falak, Lh.Kurendhoo |
Local |
CONCRETE WORKS OF 3 STOREY BUILDIGN AT DREAMS, LH. KURENDHOO |
Private |
GC01 |
Lh. Kurendhoo, Dreams |
30-Jan-22 |
24 Months |
6 Months |
- |
825 |
WEE HOUR INVESTMENT PRIVATE LIMITED |
M.Merry Weather, Binma Goalhi, Male' |
Local |
CONSTRUCTION OF A JUNIOR COLLEGE AT HA. DHIDHDHOO |
Private |
GC01 |
HA. Didhdhoo |
7-Jun-22 |
300 Days |
- |
- |
826 |
WEE HOUR INVESTMENT PRIVATE LIMITED |
M.Merry Weather, Binma Goalhi, Male' |
Local |
CONSTRUCTION OF TECHNICAL AND COVATIONAL EDUCATION TRAINING (TVET) CENTER WITH STUDENT ACCOMODATION AT R. ALIFUSHI |
Private |
GC01 |
R. Alifushi |
25-May-22 |
365 Days |
- |
- |
827 |
AIM CONSTRUCTION PRIVATE LIMITED |
Ma.Ever Bright,Dhidhi Goalhi, Male' |
Local |
CONSTRUCTION OF 3 STOREY BUILDING AT M. MULAK |
Private |
GC01 |
M. Mulak |
10-May-22 |
360 Days |
365 Days |
- |
828 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONCRETE WORKS OF 13 STOREY BUILDING (INCLUDING BASEMENT) AT H. SAEEDHA MANZIL |
Private |
GC01 |
H. Saeedha Manzil |
15-Jun-22 |
458 Days |
365 Days |
- |
829 |
MS VENTURES PRIVATE LIMITED |
H. Kinbimaage, Raiyyvilaa Magu, K. Male |
Local |
CONSTRUCTION OF 05 STOREY BUILDING AT G. TIBET VILLA |
Private |
GC01 |
G. Tibet Villa |
25-May-22 |
12 Months |
12 Months |
- |
830 |
AFAMI MALDIVES PRIVATE LIMITED |
M.Lilly Pool, 2nd Floor |
Local |
CONSTRUCTION OF MULTIPURPOSE HALL AT GDH. ATOLL SCHOOL |
Private |
GC01 |
GDh. Gadhdhoo |
3-Mar-22 |
300 Days |
300 Days |
- |
831 |
WHITE LINE PRIVATE LIMITED |
Irumathee aage, Ga.Villigilli |
Local |
CONSTRUCTION OF STOREY BUILDING AT FINIHIYAAGE, GA. VILLINGILI |
Private |
GC01 |
Finihiyaage GA. Villingili |
1-Apr-22 |
30 Months |
06 Months |
- |
832 |
ELBA PRIVATE LIMITED |
Nil |
Local |
CONSTRUCTION OF 02 STOREY BUILDING AT NALA, HA. HOARAFUSHI |
Private |
GC01 |
HA. Hoarafushi |
10-Jun-22 |
18 Months |
12 Months |
- |
833 |
PROGRESS CONSTRUCTION COMPANY PRIVATE LIMITED |
H.Sosun Mead, 2nd Floor,B1, Male' |
Local |
CONSTRUCTION OF 2 STOREY BUILDING AT AMEERUZZAHURI, GD. THINADHOO |
Private |
GC01 |
GD. Thinadhoo, Ameeruzzuhuri |
22-May-22 |
24 Months |
12 Months |
- |
834 |
ALBA INTERNATIONAL PVT LTD |
H.The Cyprea, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION OF WAREHOUSING FACILITY AT HULHUMALE LOT NO. 10631 |
Private |
GC01 |
Lot 10631, Hulhumale |
25-Sep-16 |
2758 Days |
12 Months |
- |
835 |
AFAMI MALDIVES PRIVATE LIMITED |
M.Lilly Pool, 2nd Floor |
Local |
CONSTRUCTION OF 2 CLASSROOMS, TOILETS,LIBRARY AND OFFICE BLOCK AT HA THURAAKUNU SCHOOL |
Private |
GC01 |
HA. Thuraakunu |
12-May-22 |
365 Days |
365 Days |
- |
836 |
ONE REALTY PRIVATE LIMITED |
3rd floor, Ma,Fas Eri, Ameenee Magu, Male' |
Local |
CONSTRUCTION OF 4 FLOORS AND TERRACE AT FITNESS AND WELLNESS CENTER IN HULHUMALE' (LOT 11630 N1-54) - (SUBCONTRACTED FROM GLUT INVESTMENT PRIVATE LIMITED (C-124/2006) |
Private |
GC01 |
Hulhumale' Lot 11630 (N1-54) |
28-Dec-21 |
12 Months |
12 Months |
- |
837 |
SJ CONSTRUCTION PRIVATE LIMITED |
Ma.Naseenee Handhuvaru, Male' |
Local |
DESIGN AND BUILD OF SINGLE STOREY 100 HOUSING UNITS AT L. GAN |
Private |
GC01 |
L. Gan |
10-Jun-22 |
365 Days |
365 Days |
- |
838 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 09 STOREY BUILDING ( INCLUDING TERRACE) AT H. AANIGE |
Private |
GC01 |
H. Aanige |
1-Jun-22 |
540 Days |
365 Days |
- |
839 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF RO PLANT AND PUMPING ROOM, BRINE INTAKE, NEW LIFTING STATION AND FUEL FARM AT ANANTARA RESORT |
Private |
GC01 |
Gulhigaathu Hura |
5-Jun-22 |
209 Days |
365 Days |
- |
840 |
W CONSTRUCTION COMPANY PRIVATE LIMITED |
3rd Floor, H.Sheesha Vehi, Muthee Goalhi,Male' |
Local |
CONCRETE WORKS OF FROM 2ND FLOOR TO THE TERRACE FLOOR OF THE 10 STOREY BUILDING AT H. MAAIRAA |
Private |
GC01 |
H. Maairaa |
13-May-22 |
255 Days |
06 Months |
- |
841 |
MULTI SKILL COMPANY PRIVATE LIMITED |
G.Finivilu, Dhomaidharaadha Higun, Male' |
Local |
CONSTRUCTION OF 5 STOREY BUILDING AT M.MOONBEENS |
Private |
GC01 |
M.Moonbeens |
5-Jan-20 |
1601 Days |
12 Months |
- |
842 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
DESIGN AND CONSTRUCTION OF AJIAL BILINGUAL SCHOOL AT HULHUMALE' PLOT NUMBER 10611 (C3-5) |
Private |
GC01 |
Hulhumale' Plot Number 10611 (C3-5) |
5-May-22 |
458 Days |
365 Days |
- |
843 |
OAK DEVELOPMENT PRIVATE LIMITED |
G.Goldfin house,halaveli goalhi, Male' |
Local |
CONCERET AND FINISHING WORKS FROM 3RD TO 7TH FLOOR OF 10 STOREY BUILDING H. GADHANOO |
Private |
GC01 |
H. Gadhanoo |
23-May-22 |
12 Months |
12 Months |
- |
844 |
BISON MALDIVES PVT LTD |
G.Sosanee, Rahdhebai Magu, Male' |
Local |
CONSTRUCTION OF 151-ROOM ISLAND RESORT HOTEL ON DESIGN, BUILD AND HANDOVER FOR OPERATION BASIS AT KAASANFARU ONE ISLAND |
Private |
GC01 |
Kaasanfaru One Island |
15-Jan-22 |
16 Months |
12 Months |
- |
845 |
GLOBIN PRIVATE LIMITED |
H. Reethi Maakoani, Sosan Magu, Mlae' |
Local |
CONSTRUCTION OF 06 STOREY BUILDING AT HULHUMALE ' LOT 11343 |
Private |
GC01 |
Hulhumale' Lot 11343 |
15-Jan-22 |
24 Months |
12 Months |
Terminated on 29th November 2022 |
846 |
ECO INVESTMENTS |
H.Hyde Park,Fareedhee Magu, Male' |
Local |
FINISHING WORKS OF BUILDING H. TEDRAL AAGE |
Private |
GC01 |
H. Tedralaage |
1-Feb-22 |
2 years |
- |
- |
847 |
CORAL GATE PRIVATE LIMITED |
1st Floor,G.Selvio,Ali Kilefaanu Magu,Male' |
Local |
DREDGIN, RECLAMATION & SHORE PROTECTION AT VAAGALI ISLAND, KAAFU ATOLL |
Government |
HC02 & HC03 |
K. Vaagali Island |
2-Mar-22 |
07 Months |
12 Months |
- |
848 |
PEARL ATOLL PRIVATE LIMITED |
1 floor, Bulding 3.5, Feydhoo Finolhu Island |
Local |
K. FEYDHOO FINOLHU RESORT DEVELOPMENT |
Private |
GC01 |
K.Feydhoo Finolhu |
10-Feb-18 |
1854 Days |
365 Days |
- |
849 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONCRETE AND FINISHING WORKS OF 4TH FLOOR AND CONCRETE WORKS OF 5TH & 6TH FLOOR OF 12 STOREY BUILDING AT G. GURAHAAGE |
Private |
GC01 |
G. Gurahaage |
15-Mar-22 |
06 Months |
- |
- |
850 |
VELAA ASSET MANAGEMENT PRIVATE LIMITED |
M.Kaneeru Villa, 6th Floor, Orchid Magu, Male' |
Local |
RESORT ENHANCEMENT, RENOVATION & CONSTRUCTION OF ADDITIONAL BUILDINGS AT FUSHIVELAVARU RESORT, NOONU ATOLL |
Private |
GC01 |
N. Fushivelavaru |
6-May-22 |
14 Months |
24 Months |
- |
851 |
ALIA CONSTRUCTION PVT LTD |
Hazaaruge, Rudheymaa Goalhi, S.Maradhoo |
Local |
CONSTRUCTION OF DORMITORY C AT CROSSROADS ISLAND 1 |
Private |
GC01 |
Crossroads Island 1 (Eh'mafushi) |
1-Mar-22 |
245 Days |
24 Months |
- |
852 |
MULTI SKILL COMPNAY PRIVATE LIMITED |
G.Finivilu, Dhomaidharaadha Higun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING WITH TERRACE AT H.HAMEEDHEE MANZIL |
Private |
GC01 |
H.Hameedhee Manzil |
1-Jun-22 |
25Months |
12 Months |
- |
853 |
DEFT INVESTMENT PVT LTD |
G.Dream of Garden, Banafusaa Higun, Male' |
Local |
CONSTRUCTION AND FINISHING OF 10 STOREY BUILDING H. FOUNTAIN |
Private |
GC01 |
H. Fountain |
1-Jun-22 |
1 Year |
6 Months |
- |
854 |
AQUAVENTURE MALDIVES PRIVATE LIMITED |
Hazaaruge, Rudheymaa Goalhi, S.Maradhoo |
Local |
DEVELOPMENT OF GUEST HOUSE AT ADDU CITY FEYDHOO TOURISM ZONE PLOT NUMBER E9 |
Private |
GC01 |
S. Feydhoo, Plot E9 |
1-Jul-22 |
36 Months |
- |
- |
855 |
RAINBOW CONSTRUCTION PRIVATE LIMITED |
G.Maraana,Alikileygefaanu magu, Male' |
Local |
DEVELOPMENT & CONSTRUCTION OF 12 STOREY BUILDING WITH TERRACE AT NAADHEE (H. BLUE HEVEAN) |
Private |
GC01 |
Naadhee (H. Blue Heaven) |
7-May-22 |
22 Months |
- |
- |
856 |
RAINBOW CONSTRUCTION PRIVATE LIMITED |
G.Maraana,Alikileygefaanu magu, Male' |
Local |
DEVELOPMENT & CONSTRUCTION OF 12 STOREY BUILDING WITH TERRACE AT M. ODEON |
Private |
GC01 |
M. Odeon |
7-May-22 |
21 Months |
- |
- |
857 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
CONCRETE AND FINISHING WORKS OF 7 FLOORS (FORM 04TH TO TERRACE FLOOR) OF THE 10 FLOOR BUILDING AT MA. FAVOURITE |
Private |
GC01 |
Ma. Favourite |
15-Mar-21 |
24 Months |
12 Months |
- |
858 |
ATOLL ARCH PRIVATE LIMITED |
2nd Floor, H.Melaim, Boduthakurufaanu Magu, Male' |
Local |
CONCERET AND FINISHING WORKS FROM 6TH TO 8TH FLOOR OF 8 STOREY BUILDING H. MAUVI |
Private |
GC01 |
H. Mauwi |
1-Jun-22 |
12 Months |
01 Months |
- |
859 |
ABC CONSTRUCTION PRIVATE LIMITED |
1st Floor,G.Niooranfini, Kalhuhura Magu,Male' |
Local |
CONCRETE WORKS OF 6 STOREY BUILDING AT H. VAAVELAAVELI |
Private |
GC01 |
H. Vaavelaaveli |
16-Jun-22 |
04 Months |
- |
- |
860 |
DONBE'Z PRIVATE LIMITED |
H.Sheeraz, Mustharee Magu, Male' |
Local |
DESIGN AND BUILD OF 50 HOUSING UNITS AT GA. VILLINGILI |
Private |
GC01 |
GA. Villingili |
20-Jun-22 |
270 Days |
365 Days |
- |
861 |
OSTROVY PRIVATE LIMITED |
8A, M.Fan'ari, Keneree Magu, Male' |
Local |
CONSTRUCTION OF 3 STOREY BUILDING AT MAJEEDHEE BUILDING (MALDIVES MONETARY AUTHORITY) |
Private |
GC01 |
Majeedhee Building |
20-Jun-22 |
45 Days |
06 Months |
- |
862 |
SAS E CONSTRUCTION PRIVATE LIMITED |
1st Floor,M.Ebage, Irumaa Magu,Male' |
Local |
CONSTRUCTION OF WATER SUPPLY AND SEWERAGE FACILITIES IN V. RAKEEDHOO |
Private |
GC01 |
V. Rakeedhoo |
29-Jan-22 |
540 Days |
365 Days |
- |
863 |
DOMUS PVT LTD |
M. Rosyside, Janbumagu, Male' |
Local |
MASONRY-WORKS FROM 6TH FLOOR TO TERRACE FLOOR OF 08 STOREY RESIDENTIAL BUILDING AT M.MINAA. |
Private |
GC01 |
M. Minaa |
13-Nov-22 |
740 Days |
- |
- |
864 |
WINGINEERING PRIVATE LIMITED |
1st floor, Lot 10558, Handhuvaree Hingun 02, Hulhumale' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT M. H.H STORE |
Private |
GC01 |
H.H Store |
6-Jun-22 |
18 Months |
- |
- |
865 |
ABC CONSTRUCTION PRIVATE LIMITED |
1st Floor,G.Niooranfini, Kalhuhura Magu,Male' |
Local |
CONSTRUCTION OF 06 STOREY BUILDING AT M. HUSNOOVILAAAGE |
Private |
GC01 |
M. Husnoovilaage |
16-Jun-22 |
360 Days |
- |
- |
866 |
BEIJING URBAN CONSTRUCTION GROUP CO., LTD |
H. Shabnam Residency, Majeedhee Magu, Male' |
Local |
VELANA INTERNATIONAL AIRPORT AUXILIARY INFRASTRUCTURE PROJECT |
Private |
GC01 |
Velana International Airport, |
1-Dec-17 |
2099 Days |
365 Days |
- |
867 |
HAVEN BUILDERS PRIVATE LIMITED |
H. Dhilaas 2nd Floor, Janvareemagu,K. Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT M. JEEZAAGE UTHURU |
Private |
GC01 |
M. Jeezaage Uthuru |
18-Jun-21 |
36 Months |
12 Months |
- |
868 |
LYCO CONSTRUCTION COMPANY PRIVATE LIMITED |
Ma.Daizy Villa,Anona Gaolhi,Male' |
Local |
CONSTRUCTION OF 6 STOREY BUILDING AT HULHUMALE' LOT 11257 |
Private |
GC01 |
Lot 11257, Hulhumale' |
1-Feb-22 |
18 Months |
1 years |
- |
869 |
PRINTRONICS |
M.Shining Pearl, Shameemee Goalhi, Male' |
Local |
CONSTRUCTION OF RAINWATER HOLDING TANK, TREATED WATER HOLDING TANK , DEGASIFIRE FOUNDATION, RAINWATER LIFT WELL, BRINE WATER TANK AND PUMP ROOM AT R. INNAMAADHOO |
Private |
GC02 |
R. Innamaadhoo |
12-Jun-22 |
38 Days |
- |
- |
870 |
L.F CONSTRUCTION PRIVATE LIMITED |
M. Fanari, Keneree Magu, Male' |
Local |
CONSTRUCTION NEW POWER HOUSE BUILDING AT GA. KONDEY |
Private |
GC01 |
Secretaiat of GA. Kondey Council |
24-Oct-21 |
270 Days |
365 Days |
- |
871 |
L.F CONSTRUCTION PRIVATE LIMITED |
M. Fanari, Keneree Magu, Male' |
Local |
REMAINING CONSTRUCTION WORKS OF L. HITHADHOO FENAKA OFFICE BUILDING |
Private |
GC01 |
Secretaiat of L. Hithadhoo Council |
12-Apr-22 |
180 Days |
365 Days |
- |
872 |
L.F CONSTRUCTION PRIVATE LIMITED |
M. Fanari, Keneree Magu, Male' |
Local |
REMAINING CONSTRUCTION WORKS OF N. HOLHUDHOO NEW OFFICE BUILDING |
Private |
GC01 |
Secretaiat of N. Holhudhoo Council |
11-Apr-22 |
190 Days |
365 Days |
- |
873 |
L.F CONSTRUCTION PRIVATE LIMITED |
M. Fanari, Keneree Magu, Male' |
Local |
CONSTRUCTION WORKS OF BOUNDARY WALL AND CHIMNEY OF POWER HOUSE AT M. DHIGGARU |
Private |
GC01 |
Secretaiat of M. Dhiggaru Council |
12-Apr-22 |
80 Days |
365 Days |
- |
874 |
DOMUS PVT LTD |
M. Rosyside, Janbumagu, Male' |
Local |
CONCRETE WORKS OF 2ND, 3RD, 4TH FLOOR AND FINISHING WORKS OF 2ND AND 3RD FLOOOR OF 10 STOREY RESIDENTIAL BUILDING M. ALIGAA |
Private |
GC01 & GC02 |
M Aligaa |
1-Jul-22 |
358 Days |
06 Months |
- |
875 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
FOUNDATION WORKS AND CONSTRUCTION OF 9 STOREY BUILDING AT M. ORCHID 5 NUMBER FIHAARA |
Private |
GC01 |
M. Orchid 5 Number Fihaara |
14-May-22 |
14 Months |
- |
- |
876 |
ASSETON PRIVATE LIMITED |
H.Lark, Kasinjee Magu, L.Male' |
Local |
CONSTRUCTION OF 04 STOREY BUILDING AT COOL STONE, GDH. THINADHOO |
Private |
GC01 |
GDh. Thinadhoo, Cool Stone |
1-Jul-22 |
24 Months |
- |
- |
877 |
PRINTRONICS |
M.Shining Pearl, Shameemee Goalhi, Male' |
Local |
ERECTION OF OVERHEAD CRANE PREFABRICATED STRUCTURE AT MWSC SITE, HULHUMALE' PHASE 1 |
Government |
GC02 |
Hulhumale' Phase 1 |
15-Jul-22 |
75 Days |
- |
- |
878 |
VANQUISHER CONSTRUCTION COMPANY PVT LTD |
Ma.Maaranga,Dhanburu Magu, Male'. |
Local |
CONSTRUCTION OF 9 STOREY BUILDING AT M. NAID BUILDING |
Private |
GC01, |
M .Naid Building |
5-Apr-22 |
12 Months |
- |
- |
879 |
KUREDU HOLDINGS PRIVATE LIMITED |
M. Champaa building, 4th Floor, Kandidhonmaniku Goalhi, Male' |
Foreign |
DEVELOPMENT OF MAABINHURAA ISLAND RESORT |
Resort |
GC01, GC02 |
Lh. Maabinhuraa |
28-Jun-22 |
12 Months |
- |
- |
880 |
HAMMEER MALDIVES PRIVATE LIMITED |
Ma.Gulshaneege, Male' |
Local |
CONSTRUCTION OF 2 STOREY BUILDING AT CENTARUGE AAGE, GA. VILLINGILI |
Private |
GC01 |
Centaruge Aage |
12-May-22 |
24 Months |
- |
- |
881 |
RUBIX PRIVATE LIMITED |
M.Kudaveyomatheege, Sabdheli magu, Male' |
Local |
CONSTRUCTION OF 02 STOREY BUILDING AT SUNSHINE, K. GURAIDHOO |
Private |
GC01 |
Sunshine, K. Guraidhoo |
1-Jul-22 |
450 Days |
- |
- |
882 |
NEXTA MALDIVES PRIVATE LIMITED |
5th Fl, M.Snow Flakes, Asaree Hingun, Male' |
Local |
CONSTRUCTION OF 02 STOREY BUILDING AT R. VAADHOO SCHOOL |
Government |
GC01 |
R. Vaadhoo School |
15-Mar-22 |
99 Days |
12 Months |
- |
883 |
WELL TRADING PRIVATE LIMITED |
Gaakoshi A210, Buruzu magu, Male, |
Local |
CONSTRUCTION OF 03 CLASSROOMS AT HA. MOLHADHOO SCHOOL |
Government |
GC01 |
Ha.Molhadhoo School |
6-Jun-22 |
118 Days |
- |
- |
884 |
L.F CONSTRUCTION PRIVATE LIMITED |
M. Fanari, Keneree Magu, Male' |
Local |
REMAINING CONSTRUCTION WORKS OF SH. MAAUNGOODHOOO NEW POWER HOUSE BUILDING AND OFFICE BUILDING |
Government |
GC01 |
Sh. Maaungoodhoo |
10-Jan-22 |
200 Days |
365 Days |
- |
885 |
CRYSTALLINE.MV PVT LTD |
H.Bluege,Fashankileygefaanu Magu, Male' |
Local |
CONSTRUCTION OF 09 STOREY BUILDING WITH TERRACE AT G. NOORANHIYAA |
Private |
GC01 |
G. Nooranhiyaa |
2-May-22 |
240 Days |
12 Months |
- |
886 |
ABOUDI PRIVATE LIMITED |
H.My Residence, See Sun Magu, male' |
Local |
STRUCTURAL WORKS AND FINSIHING WORKS OF 03 STOREY COLD STORAGE BUILDING AT M. GOODNESS |
Private |
GC01 |
M. Goodness |
1-Jun-22 |
06 Months |
- |
- |
887 |
PEARL MILLET CONSTRUCTION PRIVATE LIMITED |
2nd Floor, H.Kandoomaage, Apt 2, Mushtharee Magu, Male' |
Local |
CONCRETE AND FINISHING WORKS OF 5TH FLOOR OF 6 STOREY BUILDING AT BEACH ROADGE |
Private |
GC01 |
M. Beach Roadge |
20-Jun-22 |
07 Months |
- |
- |
888 |
OSLO GROUP PRIVATE LIMITED |
6th Floor, Raiykashimaage, Raiyvilla Magu, Male' |
Local |
COMPLETION OF 6TH FLOOR TO TERRACE FLOOR OF THE 10 STOREY BUILDING AT H. RAIKASHIMAAGE |
Private |
GC01 |
H. Raikashimaage |
1-Jul-22 |
21 Months |
06 Months |
- |
889 |
OSLO GROUP PRIVATE LIMITED |
6th Floor, Raiykashimaage, Raiyvilla Magu, Male' |
Local |
CONSTRUCTION OF 06 STOREY BUILDING WITH TERRACE AT H. RAIKASHIHIYAA |
Private |
GC01 |
H. Raiykashihiyaa |
21-Jun-22 |
15 Months |
06 Months |
- |
890 |
INNF CONSTRUCTION COMPANY PVT LTD |
G.Finivilu, Dhomaidharaadha Higun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT G. WAVING SHORE |
Private |
GC01 |
G. Waving Shore |
1-Jul-22 |
24 Months |
24 Months |
- |
891 |
SWIFT ENGINEERING PTE LTD |
1st Floor, G.Meerange, Bodurasgefaanu Magu, Male' |
Local |
CONSTRUCTION OF POLICE STATION AND POLICE ACCOMODATION BLOCK AT GDH. THINADHOO |
Government |
GC01 |
GDh. Thinadhoo |
1-May-22 |
365 Days |
365 Days |
- |
892 |
CHAMPALARS HOLDINGS PRIVATE LIMITED |
4th Floor, M.Champa Building, Male' |
Foreign |
DEVELOPMENT OF TOURIST RESORT AT Lh.DHERUFFINOLHU |
Private |
GC01 |
Lh. Dheruffinolhu |
24-Jun-22 |
06 Months |
- |
- |
893 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
DEVELOPMENT OF TOURIST HOTEL AT HA. KELAA |
Resort |
GC01 |
HA. Kelaa |
3-Mar-22 |
378 Days |
365 Days |
- |
894 |
SAUDI BINLADIN GROUP COMPANY LIMITED |
P.O.Box. 8918, jeddah 2149, Saudi Arabia |
Local |
THE EXPANSION OF VELANA INTERNATIONAL AIRPORT |
Government |
GC01 & GC02 |
Hulhule |
28-Jul-16 |
3010 Days |
18 Months |
- |
895 |
RAINBOW CONSTRUCTION PRIVATE LIMITED |
G.Maraana,Alikileygefaanu magu, Male' |
Local |
CONSTRUCTION OF 9 STOR |