1 |
TERRACE ARMS |
Ma.Seenumaa,Kaaminee Magu, Male' |
Local |
FOUNDATION AND CONCRETE WORKS OF 1ST AND 2ND FLOOR (10 STOREY BUILDING) AT MA.ROALHI |
Private |
GC01 / OB |
Ma. Roalhi, Male' |
|
|
20-Aug-19 |
4 Month |
_ |
2 |
HEAVY FORCE PRIVATE LIMITED |
2nd Floor, H.Fulidhooge,Kalaafaanu Higun, Male' |
Local |
DESIGN AND BUILD OF HARBOUR UPGRADE S.MARADHOO FEYDHOO |
Government |
HC01 |
S.Maradhoo Feydhoo |
|
|
15-Jul-19 |
420 days |
365 days |
3 |
HEAVY FORCE PRIVATE LIMITED |
2nd Floor, H.Fulidhooge,Kalaafaanu Higun, Male' |
Local |
SUREVY, DEISGN AND CONSTRUCTION OF DH.RINBUDHOO HARBOUR |
Government |
HC01 |
Dh.Rinbidhoo |
|
|
15-Jul-19 |
366 days |
365 days |
4 |
HEAVY FORCE PRIVATE LIMITED |
2nd Floor, H.Fulidhooge,Kalaafaanu Higun, Male' |
Local |
CONSTRCUTION OF TH.OMADHOO HARBOUR CONSTRUCTION |
Government |
HC01 |
Th.Omadhoo |
|
|
15-Jul-19 |
240 days |
365 days |
5 |
HEAVY FORCE PRIVATE LIMITED |
2nd Floor, H.Fulidhooge,Kalaafaanu Higun, Male' |
Local |
CONSTRUCTION OF SERVICE JETTY AT MEERU ISLAND RESORT |
Private |
HC01 |
Meeru Island Resort |
|
|
01-Jul-19 |
6 months |
_ |
6 |
HEAVY FORCE PRIVATE LIMITED |
2nd Floor, H.Fulidhooge,Kalaafaanu Higun, Male' |
Local |
REHABILITATION OF CARGO QUAY WALL AREA AT VIA |
Government |
HC01 |
K.Hulhule |
|
|
03-Sep-19 |
180 Days |
365 days |
7 |
HEAVY FORCE PRIVATE LIMITED |
2nd Floor, H.Fulidhooge,Kalaafaanu Higun, Male' |
Local |
EXECUTE THE SUNSET BAR ISLAND WORKS AT MADIFUSHI RESORT AND SPA |
Resort |
HC01 |
Madifushi Resort and Spa |
|
|
25-Jul-19 |
60 months |
_ |
8 |
HEAVY FORCE PRIVATE LIMITED |
2nd Floor, H.Fulidhooge,Kalaafaanu Higun, Male' |
Local |
MADIFUSHI HARBOUR JETTTY WORKS |
Private |
HC01 |
Madifushi Resort and Spa |
|
|
31-Mar-19 |
120 Days |
_ |
9 |
ALIA CONSTRUCTION PVT LTD |
3rd Floor,M. Alia Building, Gandha koalhi Magu, Male |
Local |
CONSTRUCTION OF COZY BEACH VILLAS (8 BLOCKS) AND GARDEN VILLAS (2 BLOCKS) AT BANDOS ISLAND |
Resort |
GCO1 |
Bandos island Resort |
|
|
20-May-19 |
12 months |
12 months |
10 |
ALIA CONSTRUCTION PVT LTD |
3th Floor,M. Alia Building, Gandha koalhi Magu, Male |
Local |
CONSTRUCTION OF 6 STOREY (&TERRACE) BUILDING AT LOT NO:10053, HULHUMALE |
Private |
GCO1 |
Hulhumale'10053 |
|
|
14-Jul-19 |
18 months |
12 months |
11 |
ALIA CONSTRUCTION PVT LTD |
3th Floor,M. Alia Building, Gandha koalhi Magu, Male |
Local |
CONSTRUCTION OF A 10 STOREY RESIDENTIAL DEVELOPMENT AT G.NOORAAN |
Private |
GCO1 |
G.Nooran, Male' |
|
|
1-Apr-16 |
45 months 15 days |
12 months |
12 |
ALIA CONSTRUCTION PVT LTD |
3th Floor,M. Alia Building, Gandha koalhi Magu, Male' |
Local |
CONSTRUCTION OF 13 STOREY BUILDING AT M.ALIA |
Private |
GCO1 |
M.Alia Residence, Male' |
|
|
15-Feb-14 |
5 years |
_ |
13 |
ALIA CONSTRUCTION PVT LTD |
3th Floor,M. Alia Building, Gandha koalhi Magu, Male |
Local |
CONSTRCUTIION OF 11 STOREY DEVELOPMENT AT H.MILLENNIA |
Private |
GCO1 |
H.Millennia, Male' |
|
|
1-Mar-16 |
45 months 23 days |
12 months |
14 |
ALIA CONSTRUCTION PVT LTD |
3th Floor,M. Alia Building, Gandha koalhi Magu, Male |
Local |
DESIGN DEVELOPMENT, IMPLIMENTATION OF CUSTOM DESIGNED PRE-FAB/PRE-CAST SYSTEMS, CONSTRUCTION, COMPLETION, TESTING, COMMINSSIONING & COMPLETION OF PILING WORKS, JETTIES, GUEST VILLAS, AND STANDARD ROOMS INCLUDING MEP WORKS AT ANVI FARES , BAA ATOLL |
Private |
GCO1 |
Fares Island , Baa Atoll |
|
|
1-Aug-19 |
12 months |
2 years |
15 |
A MAN MALDIVES PVT LTD |
Ground Floor,M.Noothari, Male' |
Local |
RELOCATING & ASSEMBLING OF KALHUVAKARU MOSQUE |
Government |
GC01/OB01-08 |
Dhaarul Aasaaru, Chaandhaneemagu, Male' |
|
|
20-Aug-19 |
120 days |
_ |
16 |
FARB COMPANY PRIVATE LIMITED |
Bageechaage, S.Maradhoo Feydhoo |
Local |
CONSTRUCTION WORKS EXCLUDING CONCRETE WORKS OF 03 STOREY BUILDING AT OSTEN, S.MARADHOO FEYDHOO |
Private |
GC01/OB01-08 |
Osten, S.Maradhoo Feydhoo |
|
|
5-Mar-19 |
36 months |
_ |
17 |
SANKEN OVERSEAS (PRIVATE) LIMITED |
8th Floor, Aagadhage Building, Boduthakurufaanu Magu, Male' |
Foreign |
PROPOSED OZO RESORT MALDIVES AT KUDAKURATHU ISLAND AT RAA ATOLL |
Resort |
GC01 |
Kudakurathu Island at Raa Atoll |
|
|
1-May-19 |
22 months |
365days |
18 |
JAAH INVESTMENTS PRIVATE LIMITED |
2nd Floor, Unit202,H.Davinci, Sosun Magu, Male |
Local |
DEVELOPMENT OF MIXED USE RESIDENTIAL COMPLEXES IN HULHUMALE, |
Government |
GC01&02 |
Hulumale' Plot No:10905-D2-1(a) |
|
|
1-Nov-17 |
840 days |
_ |
19 |
JAAH INVESTMENTS PRIVATE LIMITED |
3rd Floor, Unit202,H.Davinci, Sosun Magu, Male |
Local |
CONSTRUCTION OF 14 STORY BUILDING (PHASE 1) AT G.NOOMARAAGE AAGE, |
Private |
GC01&02 |
G.NOOMARAAGE AAGE, Male' |
|
|
7-Mar-19 |
24 months |
_ |
20 |
JAAH INVESTMENTS PRIVATE LIMITED |
4th Floor, Unit202,H.Davinci, Sosun Magu, Male |
Local |
CONSTRUCTION OF 12 STORY BUILDING AT H.SOSUN |
Private |
GC01&02 |
H.SOSUN, Male' |
|
|
12-Nov-19 |
2 years |
_ |
21 |
JAAH INVESTMENTS PRIVATE LIMITED |
5th Floor, Unit202,H.Davinci, Sosun Magu, Male |
Local |
CONSTRUCTION OF 06 STOREY BUILDING AT H.NIBOOGE |
Private |
GC01&02 |
H.Nibooge, Male' |
|
|
27-Oct-19 |
12 months |
6 months |
22 |
T.E.P CONSTRUCTION PVT LTD |
H.Unikuri, Muithoshi Goalhi, Male' |
Local |
CONCRETE WORKS ON FLOOR 5,6,7,8,9 AND TERRACE AT H.RG TOWER |
Private |
GC01 |
H.RG Tower, Male |
|
|
7-Oct-19 |
09 months |
_ |
23 |
ZHONGTIAN CONSTRUCTION GROUP CO. LTD |
2b,H.Finiunimaage,Sosun Magu,Male' |
Local |
PROPOSED NASANDHURA HOTEL AND APARTMENT COMPLEX |
Private |
GC01 |
Nasandhura Project Site Office, Male' |
|
|
31-Mar-16 |
55 months |
425 days |
24 |
STATIC COMPANY PRIVATE LIMITED |
M.Huraa Fareedheemagu, Male |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY AND SEWERAGE FACILITIES IN N.KENDHIKULHUDHOO |
Government |
GC01&UC(01,02,03) |
N.Kendhikulhudhoo |
|
|
28-Mar-19 |
24 months |
365 days |
25 |
STATIC COMPANY PRIVATE LIMITED |
M.Huraa Fareedheemagu, Male |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY AND SEWERAGE FACILITIES IN TH.KINBIDHOO |
Government |
GC01&UC |
Th.Kinbidhoo |
|
|
28-Mar-19 |
24 months |
365 days |
26 |
STATIC COMPANY PRIVATE LIMITED |
M.Huraa Fareedheemagu, Male |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY AND SEWERAGE FACILITIES IN HA.ULIGAM |
Government |
GC01&UC |
Ha. Uligamu |
|
|
28-Mar-19 |
24 months |
365 days |
27 |
STATIC COMPANY PRIVATE LIMITED |
M.Huraa Fareedheemagu, Male |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY AND SEWERAGE FACILITIES IN GA.KANDUHULHUDHOO |
Government |
GC01&UC |
GA.Kanduhulhudhoo |
|
|
28-Mar-19 |
24 months |
365 days |
28 |
GK Developments Pvt Ltd |
No.42 North Phase Industrial Estate, Ekkattuthangal, Chennai -006032 |
Foreign |
CONSTRUCTION OF ASPHALT ROADS IN ADDU CITY |
Government |
GC01&02, HC01,02,03 UC 01 |
S.Hithadhoo, S, Mardhoo,S.Maradhoo Feydhoo |
|
|
23-Dec-19 |
545 days |
365 days |
29 |
UNI ENGINEERING PRIVATE LIMITED |
M.Dhaanaage 4A, Orchid Magu, Male' |
Local |
CONSTRUCTION OF NEW COUNCIL OFFICE BUILDING AT L.ISDHOO |
Government |
GC01&02, OB01-08, |
L.Isdhoo |
|
|
13-Nov-19 |
285 days |
06 months |
30 |
ABYLA CONSTRUCTION PRIVATE LIMITED |
2nd Floor,Shinetree Building Male', Maldives |
Local |
M.SUNNYINN 10 STOREY BUILDING FINISHING WORKS |
Private |
GC01&02, OB01-08, |
M.Shine Inn, Male' |
|
|
10-Oct-13 |
86 months، 21 days |
360 days |
31 |
KANBALIFARU DEVELOPMENT PRIVATE LIMITED |
M.Fehigiri ,1st Floor,Handhuvaree Higun, Male' |
Local |
CONSTRUCTION AND DEVELOPMENT OF TOURIST RESORT AT SH.KANBALIFARU |
Resort |
GC01 |
Sh.Kanbalifaru |
|
|
6-Nov-14 |
2242 days |
_ |
32 |
W & A OVERSEAS PTE.LTD |
7th Floor,H.Fusthulhaamaage,Ameer Ahmed Magu, Male' |
Foreign |
CONSTRUCTION OF SOCIAL HOUSING 14 STOREY RESIDENTAL TOWERS HULHUMALE PHASE II NO:N3-20(D),N3-20(E) AND N3-20(F) |
Government |
GC01 &GC02 |
Hulhumale Phase II |
|
|
11-Jan-18 |
32 Months |
12 Months |
33 |
VENZA COMPANY PRIVATE LIMITED |
1st Floor,10073 Hulhumale lot, Nirolhu Magu, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT MA.IRIS, MALE' |
Private |
GC01 &GC02 |
Ma.Airis, Male' |
|
|
1-Jul-19 |
18 months |
_ |
34 |
SJ CONSTRUCTION PVT LTD |
Ma.Naseenee Handhuvaru, Male' |
Local |
DESIGN AND CONSTRUCTION OF SINGLE STOREY 100 HOUSING UNITS AT TH.THIMARAFUSHI |
Government |
GC01 &GC02 |
Th.Thimarafushi |
|
|
2-Feb-20 |
364 days |
_ |
35 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
15 STOREY RESIDENTIAL BUILDING AT MA.SEERAAZEEGE-DEMOLITION & CONCRETE WORKS |
Private |
GC01 &GC02 |
Ma. Seeraazeege, Male' |
|
|
5-Nov-19 |
505 days |
365 Months |
36 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF PROPOSED 02 STOREY MULTIPURPOSE HALL BLOCK - L.ISDHOO SCHOOL |
Government |
GC01 &GC02 |
L.Isdhoo School, L.Isdhoo |
|
|
23-Dec-19 |
210 days |
365 Months |
37 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF L.FONADHOO MOSQUE |
Government |
GC01 &GC02 |
L.Fonadhoo |
|
|
28-Oct-19 |
300 days |
_ |
38 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF PROPOSED 02 STOREY MULTIPURPOSE HALL BUILDING - SN.HITHADHOO ADDU HIGH SCHOOL |
Government |
GC01 &GC02 |
S.Hithadhoo |
|
|
15-Sep-19 |
210 days |
365 Months |
39 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF PROPOSED 02 STOREY MULTIPURPOSE HALL BLOCK - FUVAHMULAH CITY,MJS |
Government |
GC01 &GC02 |
MJS School, Fuvah mulaku City |
|
|
23-Dec-19 |
210 days |
365 Months |
40 |
INOCA PRIVATE LIMITED |
H.Sakeena Manzil, Medhu Ziyaaraiy Magu, Male' |
Local |
CONSTRUCTION OF PROPOSED 2 STOREY 6 CLASSROOM AT GDH.FIYOARI SCHOOL |
Government |
GC01 &GC02 |
Gdh.Fiyori Schoo, Gdh.Fiyori |
|
|
17-Oct-19 |
225 days |
365 Months |
41 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
DESIGN ,BUILD AND CONSTRUCTION OF 100 HOUSING UNIT - LH.NAIFARU |
Government |
GC01 &GC02 |
Lh.Naifaru |
|
|
10-Feb-20 |
330 days |
365 days |
42 |
HALFSIX INVESTMENT |
M.Kurevi, Chebeylee Magu, Male' |
Local |
CONSTRUCTION OF 3 STOREY GUEST HOUSE AT MALA-V.THINADHOO |
Private |
GC01 |
V.Thinadhoo |
|
|
16-Dec-19 |
12 months |
_ |
43 |
SJ CONSTRUCTION PVT LTD |
Ma.Naseenee Handhuvaru, Male' |
Local |
CONSTRUCTION OF DHARUMAVANTHA NEW SCHOOL |
Government |
GC01 &GC02 |
Dharumavantha School, Male' |
|
|
14-Feb-20 |
364 days |
_ |
44 |
FAHI ARUTHA MALDIVES PRIVATE LIMITED |
Ma.Ever Bright, Dhidhi Goalhi, Male' |
Local |
CONSTRUCTION OF 4 STOREY BUILDING -HULHUMALE LOT N0:11109 |
Private |
GC01 &GC02 |
Hulhumale' Lot no: 11109 |
|
|
1-Mar-20 |
365 days |
_ |
45 |
HUNAN NO.6 ENGINEERING CO.LTD |
Hulhumale Row House No:16/7, No:05 Goalhi, Hithigas Magu, Male' |
Foreign |
DESIGN AND BUILD OF HULHUMALE' OFFICE BUILDING ON E.P.C TURNKEY BASIS |
Government |
GC01 &GC02 |
Hulhumale' |
|
|
13-Feb-20 |
365 days |
_ |
46 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
CONSRUCTION OF 10 STOREY BUILDING - MA.HITHTHALAGE |
Private |
GC01 &GC02 |
Ma.Hiththalage Male' |
|
|
30-Dec-19 |
12 months |
_ |
47 |
ROAD DEVELOPMENT CORPORATION LIMITED |
1st Floor,MNSL Building,Orchid Magu,Male' |
Local |
MALE' ROAD PROJECT- PHASE 1 |
Government |
GC01 &GC02 |
Male' |
|
|
26-Jan-20 |
2 years |
180 days |
48 |
JIAZ-MALDIVES PRIVATE LIMITED |
M.Dhahaaab, Nikagas Magu, Male' |
Local |
CONSTRUCTION OF 7 FLOOR BUILDING AT HULHUMALE' PLOT NO 20018 |
Private |
GC01 &GC02 |
Hulhumale' Plot 20018 |
|
|
26-Oct-19 |
15 months |
_ |
49 |
ATTOLLO CONSTRUCTION PRIVATE LIMITED |
3B, H. Valhufehi, Buruzu Magu, Male' |
Local |
CONSTRUCTION WORKS OF MAABINHURAA ISLAND RESORT |
Resort |
GC01 &GC02 |
Lh.Maabinhuraa |
|
|
20-Jan-19 |
2 years |
_ |
50 |
ROTIME ENGINEERING AND TECHNOLOGY CO.LTD |
RM 1501(669), FSPACTR 53-55, Wanchai Lockatrd, Hong Kong |
Foreign |
CONSTRUCTION OF 02 BUILDING TOWERS OF STELCO HIYA PROJECT- HULHUMALE' PHASE 2 |
Government |
GC01 |
Hulhumale' Phase II |
|
|
1-Feb-18 |
911 days |
_ |
51 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 15 STOREY BUILDING WITH BASEMENT -MCHABEYLI VILLA |
Private |
GC01 &GC02 |
M.Chanbeylivilaa |
|
|
1-Apr-18 |
28 months |
_ |
52 |
ASCON BUILDERS PRIVATE LIMITED |
M.Irudevi, Feerozu Magu, Male' |
Local |
CONSTRUCTION OF L.KALAIDHOO MOSQUE |
Government |
GC01 &GC02 |
L.Kalaidhoo |
|
|
20-Jan-20 |
270 days |
_ |
53 |
ASCON BUILDERS PRIVATE LIMITED |
M.Irudevi, Feerozu Magu, Male' |
Local |
CONSTRUCTION OF R.VAADHOO MOSQUE |
Government |
GC01 &GC02 |
R.Vaadhoo |
|
|
16-Dec-19 |
150 days |
_ |
54 |
A MAN MALDIVES PVT LTD |
Ground Floor,M.Noothari, Male' |
Local |
CONSTRUCTION OF NEW COUNCIL BUILDING - GA.KONDEY |
Government |
GC01 &GC02 |
GA.Kondey |
|
|
25-Jan-20 |
365 days |
_ |
55 |
BOSKALIS WESTMINSTER CONTRACTING LIMITED |
06th Floor H,Aage, Boduthakurufanu Magu, Male' |
Foreign |
DREDGING,LAND RECLAMATION AND REVETMENT WORKS -GULHIFALHU |
Government |
HC01,HC02 &HC03 |
K.Gulhifalhu |
|
|
20-Feb-20 |
06 months |
365 days |
56 |
AAKEY'S INTERNATIONAL PRIVATE LIMITED |
6th Floor, Endheri, Unimaa Higun, Hulhumale' |
Local |
CONSTRUCTION & FINISHING WORKS OF 2 BED ROOM WATER VILLA,OVER WATER RESTAURANT,SUNSET BAR,2BED ROOMSEMI-WATER PRESIDENT SUITE AND GM BUILDING -V.KUNAVASHI |
Resort |
GC01 &GC02 |
V.Kunaavashi |
|
|
20-Nov-19 |
06 months |
_ |
57 |
INTER OCEAN PTE LTD |
M.Roselin, Jambu Magu, Male' |
Local |
REPAIRING DAMAGED BEAMS OF 32 VILLAS AT TAJ CORAL RESORT & SPA |
Resort |
GC01 |
Taj Coral Reef Resort and Spa |
|
|
5-Sep-19 |
365 days |
|
58 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 15 STOREY BUILDING AT M.RANA TOWER |
Private |
GC01 &GC02 |
Ma. Rana Tower, Male' |
|
|
1-Dec-19 |
36 months |
365 days |
59 |
COAST LINE PILING& CONSTRUCTION PRIVATE LIMITED |
M.Irufuheyge, Maaveyo Magu, Male' |
Local |
CONSTRUCTION OF 11 FLOOR BUILDING AT M.THULHAADHOOGE |
Government |
GC01 |
M.Thulhaadhooge, Male' |
|
|
15-May-19 |
36 months |
12 months |
60 |
RAINBOW CONSTRUCTION PRIVATE LIMITED |
G.Maarana, Alikilegefaanu Magu |
Local |
CONSTRUCTION OF 11 STOREY BUILDING AT G.MANZARUGE |
Private |
GC01 &GC02 |
G.Manzaruge, Male' |
|
|
4-Dec-19 |
15 Months |
365 days |
61 |
IMA GROUP PVT LTD |
1st Floor, M.Blue Sea,Kanbaaisha Ranihingun,Male' |
Local |
CONSTRCUTION OF ADDITIONAL FLOOR (9TH FLOOR), CONCERETE WORKS OF 8TH FLOOR, GARBAGE AREA AND PARKING, LIFT INSTALLATION, FINISING WORKS AT M.BLUE SEA |
Private |
GC01 &GC02 |
M.Bluesea, Male' |
|
|
1-Apr-20 |
18 months |
_ |
63 |
MAZIYA CONSTRUCTION PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
CONSTRUCTION OF 11 STOREY BUILDIN AT M.GULISTHAANUGE |
Private |
GC01&GC02 |
M.Gulisthaanuge, Male' |
|
|
3-Apr-20 |
6 months |
12 months |
62 |
CAPITAL INVESTMENT AND FINACE PRIVATE LIMITED |
4B,H.Melain,Boduthakurufaanu Magu,Male' |
Foreign |
REVETMENT WORKS AT GULHIFALHU (SUB-CONTRACT WORKS OF THE PROJECT DREDGING, LAND RECLAMATION AND REVETMENT AT K.GULHIFALHU AWARDED TO BOSKALIS WESTMINISTER CONTRCATING LIMITED (FC00142019) |
Government |
GC01&HC01 |
K.Gulhifalhu |
|
|
4-Feb-20 |
24 Months |
1 year |
64 |
MAZIYA CONSTRUCTION PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
CONSTRUCTION OF 11 STOREY BUILDING AT M.MAALIMEEGE |
Private |
GC01&GC02 |
M.Maalimeege , Male' |
|
|
4-Feb-20 |
24 Months |
1 year |
65 |
K.I.M GROUP PRIVATE LIMITED |
M.Fathaha,Fandiyaaru Magu,Male |
Local |
CONSTRUCTION OF 4 STOREY BUILDING AT G.TINU VEHI (SUBCONTRACTED BY LAND BUILDERS PRIVATE LIMITED (C-740/2008)) |
Private |
GC01 &GC02 |
G.Tinuvehi Male' |
|
|
30-Apr-20 |
24 Months |
_ |
66 |
PRECISION ENGINEERING SERVICES (PRIVATE) LIMITED in JV with P.E.S MARINE SERVICE PRIVATE LIMITED |
M.Fulhafi,Gulhazaaru Goalhi,Male' |
JV |
DESIGN AND BUILD OF 100 HOUSING UNITS AT M.KOLHUFUSHI |
Government |
GC01 &GC02 |
M.Kolhufushi, Male' |
|
|
15-Jul-20 |
350 days |
365 days |
67 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTON OF 10 STOREY FOUNDATION AND CONSTRUCTION OF 4 STOREY AT M.ZARF |
Private |
GC01 &GC02 |
M.Zarf , Male' |
|
|
8-Apr-20 |
12 months |
|
68 |
ALIA CONSTRUCTION PVT LTD |
3th Floor,M. Alia Building, Gandha koalhi Magu, Male' |
Local |
CONSTRUCTION AND DEVELOPMENT OF 2 STOREY MOSQUE AT HULHUMALE', C3-1 (LOT NO:11592) |
Private |
GCO1 |
Hulhumale' Lot no: C3-1 11592 |
|
|
20-Aug-19 |
24 months |
_ |
69 |
HEAVY FORCE PRIVATE LIMITED |
2nd Floor, H.Fulidhooge,Kalaafaanu Higun, Male' |
Local |
DESIGN AND BUILD OF JETTY AND HARBOUR UPGRADE IN R.RASGETHEEMU |
Government |
HC01 |
R.Rasgetheemu |
|
|
28-Jun-20 |
420 days |
_ |
70 |
HEAVY FORCE PRIVATE LIMITED |
2nd Floor, H.Fulidhooge,Kalaafaanu Higun, Male' |
Local |
DESIGN AND BUILD OF ADH.DHIDHOO HARBOUR |
Government |
HC01 |
Adh.Dhidhoo |
|
|
8-Jun-20 |
300 days |
_ |
71 |
MAZIYA CONSTRUCTION PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
CONSTRUCTION OF MALE' SWIMMING TRACK SHED |
Private |
GC01&GC02 |
Male Swimming Track, Male |
|
|
23-Feb-20 |
190 days |
|
72 |
SANKEN OVERSEAS (PRIVATE) LIMITED |
8th Floor, Aagadhage Building, Boduthakurufaanu Magu, Male' |
Foreign |
DESIGN AND BUILD OF THE PROPOSED 80-ROOM AT ALILA RESORT |
Resort |
GC01 |
Kothaaifaru Island, R.Atoll |
|
|
1-Dec-19 |
17 months |
_ |
73 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTON OF 11 STOREY FOUNDATION AND CONSTRUCTION OF 10 STOREY AT M.TITIAN |
Private |
GC01&2 |
M.Titian, Male' |
|
|
1-Jul-20 |
12 months |
_ |
74 |
AWASMAGU CONSTRCUTION PRIVATE LIMITED |
M.Alakaa, Handhuvaree Hingun, Male' |
Local |
CONSTRUCTION OF 10 STOREY FOUNDATION AND 1ST FLOOR STRUCTURAL WORK AT G.RIDHAA |
Private |
GC01 |
G.Ridhaa, Male' |
|
|
25-Jun-20 |
2 months |
_ |
75 |
CHINA STATE CONSTRUCTION ENGINEERING COREPORATION CORPORATION LIMITED |
6th Floor H.Aage' |
Foreign |
CONSTRUCTION OF 7000 HOUSING UNITS AT HULHUMALE PHASE II |
Government |
GC01 |
Hulhumale Phase II |
|
|
19-Dec-17 |
828 Days |
|
76 |
M.N INVESTMENT |
H.Rankokaafehi, Raivilla Higun ,Male' |
Local |
CONSTRCUTION OF 7 STOREY FOUNDATION AND FIRST 3 FLOOR STRUCTURAL WORKS AT G.ARUTHA |
Private |
GC01&2 |
G.Arutha, Male' |
|
|
15-Feb-20 |
8 Months |
|
77 |
URBIST PRIVATE LIMITED |
Flat 94-01-04, Rabarugas Magu,Hulhumale |
Local |
FINISHING WORKS OF 6TH FLOOR BUILDING AT HULHUMALE' LOT 10084 |
Private |
GC01 |
Hulhumale' Lot 10084 |
|
|
20-Jan-20 |
09 Months |
7 Days |
78 |
FAF CONSTRUCTION & TRADING PRIVATE LIMITED |
Ma.Foniluboage, Kurikeela Magu, Male' |
Local |
CONSTRUCTION OF 11 STOREY BUILDING AT H.HEYN BEYN, MALE' |
Private |
GC01 |
H.Heyn Beyn, Male' |
|
|
1-Aug-20 |
30 months |
- |
79 |
W CONSTRUCTION COMPANY PRIVATE LIMITED |
3rd Floor, H.Sheesha Vehi, Muthee Goalhi,Male |
Local |
CONSTRUCTION OF 15 STOREY BUILDING WITH BASEMENT AND 2/3 TERRACE AT H.SHEESHA BUILDING |
Private |
GC01 |
H.Sheesha Building, Male' |
|
|
28-Jul-20 |
36 Months |
- |
80 |
PROPOSE CONSTRUCTION PRIVATE LIMITED |
Ground Floor, Ma.Double Eight, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF STRUCTURAL WORKS OF FLOOR 7, 8 & 9 AT G.GARNET |
Private |
GC01 |
G.Garnet, Male' |
|
|
13-Jul-20 |
6 Months |
- |
81 |
K.I.M GROUP PRIVATE LIMITED |
M.Fathaha,Fandiyaaru Magu,Male |
Local |
CONSTRUCTION OF TEN STOREY RESIDENTIAL BUILDING AT G. TINY WAVES |
Private |
GC01 |
G.Tiny Waves, Male' |
|
|
1-Apr-19 |
18 months |
- |
82 |
HIKAWI CONSTRUCTION PRIVATE LIMITED |
Ground Floor, Lot 11178, Chabeylee Magu, Goalhi 06, Hulhumale' |
Local |
CONSTRUCTION OF STRUCTURAL WORKS OF FLOOR 7, 8 & 9 AT G.GARNET |
Private |
GC01 |
M.Medalmaage Aage,Male' |
|
|
1-Mar-20 |
4 Years |
- |
83 |
REXON BUILDERS PRIVATE LIMITED |
H.Aazaadhewaadhee, Dhunkuri Magu, Male' |
Local |
CONSTRUCTION OF CONCRETE WORSKS AND FINISHING WORK OF 10 STOREY BUILDING AT M.MEDALMAAGE AAGE, MALE' |
Private |
GC01 |
M. Kanamadhu, Male' |
|
|
15-Jul-20 |
18 months |
- |
84 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRCUTION OF GROUND AND 1ST FLOOR CONCRETE AND FINISHING WORKS AT G.GURAHAAGE 12 STOREY BUILDING |
Private |
GC01 |
G.Gurahaage, Male' |
|
|
15-Jul-20 |
7 months |
1year |
85 |
NEW LAYA CONSTRUCTION PRIVATE LIMITED |
M.Kuribee Lodge,Ihzuhdheen Magu, Male' |
Local |
CONSTRUCTION OF STRUCTURAL WORKS OF 4TH AND 5TH FLOOR AT G.HERETHERE 12 STOREY BUILDING |
Private |
GC01 |
G.Herethere, Male' |
|
|
5-Jul-20 |
92 days |
- |
86 |
TAG CONSTRUCTION & SUPPLY PRIVATE LIMITED |
Block 6, Hulhumale Ferry Terminal, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION OF 5 STOREY BUILDING AT M.ALIVILUN |
Private |
GC01 |
M.Alivilun |
|
|
1-Jan-20 |
15 Months |
- |
87 |
SCHEMATIC PRIVATE LIMITED |
Flat 120-02-04, Boaganvilla Magu,Hulhumale |
Local |
CONSTRUCTION OF 10 STOREY BUILDING WITH TERRACE AT G.OTTARU (PHASE 1) |
Private |
GC01 |
G.Ottaru, Male' |
|
|
1-Feb-20 |
10 Months |
- |
88 |
MAAS INVESTMENT PRIVATE LIMITED |
10th Floor, M.Haagirige, Kanba Aisa Rani Hingun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H.DHIGGAAMAAGE |
Private |
GC01 |
H.Dhiggaamaage |
|
|
1-Apr-20 |
36 months |
- |
89 |
PEARL TRAVEL SERVICE PRIVATE LIMITED |
H.Hirifushi, Asrafee Magu, Male' |
Local |
CONSTRUCTION OF FOUNDATTION OF 9 STOREY BUILDING AND CONSTRUCTION OF FIRST 6 FLOORS AT H. FENVILLA PALACE |
Private |
GC01 |
H.Fenvilla Palace |
|
|
1-Mar-20 |
1 Year |
- |
90 |
WELVAART COMPANY PRIVATE LIMITED |
Ma.Baabulavaalee 1, Chandhanee Magu,Male' |
Local |
CONSTRCUTION OF FOUR STOREY FOUNDATION AND FISRT FLOOR AT MA.BAABUL AVAALEE 1 |
Private |
GC01 |
Ma.Baabul Avaalee1 |
|
|
10-Jul-20 |
90 Days |
- |
91 |
CHAMPALARS HOLDINGS PRIVATE LIMITED |
4th Floor, Champaa Building , Bandidhon Maniku Goalhi, Male' |
Local |
CONSTRUCTION OF TOURIST RESORT AT LH.DHERUFFINOLHU |
Resort |
GC01&2 |
LH.Dheruffinolhu |
|
|
24-Jul-14 |
2345 days |
- |
92 |
KIYOTO REEF PRIVATE LIMITED |
V.Kiyoto, Veshi Magu, Villimale |
Local |
CONSTRUCTION OF 5 STOREY BUILDING AND TERRACE AT M.ALUNTHILA 2 |
Private |
GC01 |
M.Alunthila 2 |
|
|
1-Aug-20 |
24 Months |
- |
93 |
NEW LAYA CONSTRUCTION PRIVATE LIMITED |
M.Kuribee Lodge,Ihzuhdheen Magu, Male' |
Local |
CONSTRUCTION OF STRUCTURAL WORKS OF 4TH, 5TH, 6TH AND 7TH FLOOR AT M.MILET 10 STOREY BUILDING |
Private |
GC01 |
M.Milet, Male' |
|
|
10-Jun-20 |
180 days |
- |
94 |
NEW LAYA CONSTRUCTION PRIVATE LIMITED |
M.Kuribee Lodge,Ihzuhdheen Magu, Male' |
Local |
CONSTRUCTION OF STRUCTURAL WORKS OF 2ND AND 3RD FLOOR AT MA.SYBOOGE 10 STOREY BUILDING |
Private |
GC01 |
Ma.Seybooge, Male' |
|
|
1-Jul-20 |
120 days |
- |
95 |
MULTI ROUTE PRIVATE LIMITED |
M.Ali Havaa, Badharumathi Higun, Male' |
Local |
CONSTRUCTION OF STRUCTURAL WORKS OF 8 STOREY BUILDING WITH ROOFTOP AT MA.SHAADHU |
Private |
GC01 |
Ma.Shaadhu |
|
|
30-Jun-20 |
10 Months |
- |
96 |
K.I.M GROUP PRIVATE LIMITED |
M.Fathaha,Fandiyaaru Magu,Male |
Local |
CONSTRUCTION OF STRUCTURE FOR 10 STOREY BUILDING AT H.FUJEYRA |
Private |
GC01 |
H.Fujeyraa |
|
|
1-Feb-20 |
18 Months |
2 Months |
97 |
S.R PRO PRIVATE LIMITED |
Malas, Sh.Funadhoo |
Local |
CONSTRUCTION OF STURUCTURAL WORKS OF 2 SLABS AT M.MAGARA |
Private |
GC01 |
M.Magara, Male' |
|
|
10-Jul-20 |
3 Months |
1 year |
98 |
CHINA STATE CONSTRUCTION MALDIVES PRIVATE LIMITED |
6th Floor, H.Aage, Boduthakurufaanu Magu, Male' |
Foreign |
CONSTRUCTION OF CHANNEL BETWEEN PHASE 1 & 2 IN HULHUMALE' |
Government |
GC02 |
Hulhumale Phase II |
|
|
1-Jan-20 |
488 days |
- |
99 |
ALIA CONSTRUCTION PVT LTD |
3rd Floor,M. Alia Building, Gandha koalhi Magu, Male |
Local |
CONSTRUCTION 6 STOREY (& TERRACE) BUILDING AT HULHUMALE LOT NO: 11055 |
Private |
GC01 |
Lot 11055, Hulhumale |
|
|
22-Aug-20 |
18 months |
1 year |
100 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION OF 13 STOREY BUILDING AT M.THREE A VILLA |
Private |
GC01 |
M.Three A Villa, Male' |
|
|
1-Aug-20 |
19 months |
1 Year |
101 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION OF 10 STOREY FOUNDATION AND CONSTRUCTION AND FINISHING OF FIRST THREE FLOOR WORKS AT MA.HANDHUVAREE VILLA |
Private |
GC01 |
Ma. Handhuvaree Villa, Male' |
|
|
1-Aug-20 |
08 months |
1year |
102 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION OF 13 STOREY BUILDING FOUNDATION WORKS AND CONSTRCUTION OF GROUND AND FIRST FLOOR AT M.SAILA |
Private |
GC01 |
M.Saila, Male' |
|
|
1-Mar-20 |
7 Months |
1year |
103 |
W CONSTRUCTION COMPANY PRIVATE LIMITED |
3rd Floor, H.Sheesha Vehi, Muthee Goalhi,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT G.ZIHU |
Private |
GC01 |
G.Zihu, Male' |
|
|
15-Feb-20 |
12 Months |
- |
104 |
RAPID CONSTRUCTION PRIVATE LIMITED |
G.Lux Villa,Dhonadhaaraada Higun |
Local |
CONSTRUCTION OF CONCERETE SLAB ON 3RD FLOOR AT MA. BLUE CORAL |
Private |
GC01 |
Ma. M.Blue Coral, Male' |
|
|
30-Aug-20 |
60 days |
- |
105 |
BOSKALIS WESTMINSTER CONTRACTING LIMITED |
06th Floor H,Aage, Boduthakurufanu Magu, Male |
Foreign |
DREDGING,LAND RECLAMATION AND REVETMENT WORKS -GULHIFALHU |
Government |
GC01 |
Gulhifalhu |
|
|
14-Jun-20 |
06 months |
1year |
106 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT G.ASTERS TOWER |
Private |
GC01 |
G.Asters Tower, Male' |
|
|
1-Jan-20 |
18 Months |
1year |
107 |
YUAAN COMPANY PRIVATE LIMITED |
Azaaliya, Lot 11322, Rabarugas Magu Goalhi 07, Hulhumale |
Local |
08 FLOORS FOUNDATION WORKS OF 06 STOREY BUILDING AT HULHUMALE' LOT 10382 |
Private |
GC01 |
Hulhumale' Lot 10382 |
|
|
5-Sep-20 |
01 month |
- |
108 |
YUAAN COMPANY PRIVATE LIMITED |
Azaaliya, Lot 11322, Rabarugas Magu Goalhi 07, Hulhumale |
Local |
STRUCTURAL AND FINISHING WORKS OF 03 FLOORS AT HULHUMALE' LOT 10579 |
Private |
GC01 |
Hulhumale' Lot 10579 |
|
|
3-Sep-20 |
3years 03 Months |
- |
109 |
DEPICT PRIVATE LIMITED |
H.Woodland Aage, Kaani Goalhi,Male' |
Local |
CONCRETE WORKS OF 4TH FLOOR OF 10 STOREY BUILDING AT H.PAAYAL |
Private |
GC01 |
H.Paayal |
|
|
15-Aug-20 |
35 Days |
- |
110 |
THE SECUMO PRIVATE LIMITED |
H.Port Side,Boduthakurufaanu Magu,Male' |
Local |
BUILDING 27 WATER VILLAS IN SONEVA JANI(N.MEDHUFARU ISLAND) UNDER SONEVA JANI RESORT DEVELOPMENT PROJECT,PHASE 2 |
Private |
GC01 |
N.Medhufaru |
|
|
26-Jul-20 |
153 days |
- |
111 |
ABC CONSTRUCTION PVT LTD |
1st Floor,G.Niooranfini, Kalhuhura Magu,Male' |
Local |
CONSTRUCTION OF 8 STOREY BUILDING AT G.VAIJEHEYGE AAGE,MALE |
Private |
GC01 |
G.Vaijeheyge Aage |
|
|
10-Aug-20 |
300 days |
- |
112 |
ABC CONSTRUCTION PVT LTD |
1st Floor,G.Niooranfini, Kalhuhura Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT M.SAVARIN,MALE' |
Private |
GC01 |
M.Savarin,Male' |
|
|
25-Aug-20 |
396 days |
- |
113 |
ABC CONSTRUCTION PVT LTD |
1st Floor,G.Niooranfini, Kalhuhura Magu,Male' |
Local |
CONCRETE AND FINISHING WORKS OF 5TH TO 10TH FLOOR(TERRACE FLOOR) INCLUDING LIFT INSTALLATION AT MA.FANAARU,MALE' |
Private |
GC01 |
Ma.Fanaaru,Male' |
|
|
19-Mar-20 |
14 months |
- |
114 |
HAIMAN CONSTRUCTION PVT LTD |
G.Green House, Dhonadharaadha Hingun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT MA.RIHIFASHUVIGE,MALE' |
Private |
GC01 |
M.Rihifashuvige,Male' |
|
|
1-Jan-19 |
36 Months |
- |
115 |
MAZIYA SERVICES PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male |
Local |
CONSTRUCTION WORKS OF THE PENDING 5 FLOORS OF 10 STOREY BUILDING AT M.ENZIYAN,MALE |
Private |
GC01 |
M.Enziyan,Male |
|
|
2-Aug-20 |
7 Months |
- |
116 |
MICRON PRIVATE LIMITED |
M.Nice Dream, Kanbaa Aisa Rani Hingun, Male' |
Local |
SLAB WORK OF 3RD- 6TH FLOOR OF H.MAABANDEYRIAAGE |
Private |
GC01 |
H.Maabandeyriaage |
|
|
1-Aug-20 |
90 Days |
- |
117 |
GLUT INVESTMENTS PRIVATE LIMITED |
G.Blue Whale, Alikilegefaanu Magu,Male |
Local |
CONCRETE WORKS OF 16 STOREY BUILDING AT MA.HAIVAKARUGE (PHASE 1) |
Private |
GC01 |
Ma.Haivakaruge |
|
|
1-Jul-19 |
561 Days |
1 year |
118 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CASTING FOUNDATION FOR 10 STOREY BUILDING AND CONSTRUCTION AND FINISHING OF GROUND FLOOR TO FORTH FLOOR AT M.ZAMEEN |
Private |
GC01 |
M.Zameen |
|
|
9-Sep-20 |
18 months |
1 year |
119 |
JIAZ-MALDIVES PRIVATE LIMITED |
M.Dhahaaab, Nikagas Magu, Male' |
Local |
CONSTRUCTON OF 10 STOREY FOUNDATION AND CONCRETE AND FINISHING WORKS OF GROUND, 1ST, AND SECOND FLOOR AT MA.VINAMA |
Private |
|
Ma. Vinama |
|
|
15-Dec-19 |
09 months |
- |
120 |
STATIC COMPANY PRIVATE LIMITED |
M.Huraa Fareedheemagu, Male |
Local |
DESIGN AND BUILD OF WATER SUPPLY AND SEWERAGE FACILITIES IN SH.NARUDHOO,SH.MAAUNGOODHOO, N.LOLHI AND DESIGN AND BUILD OF WATER SUPPLY SYTEM AIN N.HOLHUDHOO (PACKAGE 2) |
Government |
GC01 &UC |
SH.Narudhoo,SH.Maaungoodhoo, N.Lolhi, N.Holhudhoo |
|
|
29-Sep-19 |
24 months |
1 year |
121 |
AMANAT |
V.Translvania, Kandoomaa Goalhi, Male' |
Local |
CONSTRUCTION OF FOUR FLOOR BUILDING AT M.RAHADHOO |
Private |
GC01 |
G.Rahadhoo |
|
|
15-Mar-20 |
322 Days |
- |
122 |
FAF CONSTRUCTION & TRADING PRIVATE LIMITED |
Ma.Foniluboage, Kurikeela Magu, Male' |
Local |
CONCRETE WORKS OF 09 STOREY BUILDING AT MA.SENTRITA |
Private |
GC01 |
Ma.Sentrita |
|
|
16-Aug-20 |
2 Months |
- |
123 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION WORK OF 10 STOREY AND CONSTRUCTION OF 02 STOREY AT H.JANAVAREE VILLA |
Private |
GC01 |
H. Janavaree Villa |
|
|
1-Aug-20 |
9 Months |
- |
124 |
DEPICT PRIVATE LIMITED |
H.Woodland Aage, Kaani Goalhi,Male' |
Local |
CONCRETE WORKS OF 4TH FLOOR OF 10 STOREY BUILDING AT M.AARO |
Private |
GC01 |
M.Aaro |
|
|
21-Aug-20 |
28 Days |
- |
125 |
SCHEMATIC PRIVATE LIMITED |
Flat 120-02-04, Boaganvilla Magu,Hulhumale |
Local |
CONSTRUCTION OF 10 STOREY BUILDING WITH TERRACE AT G.OTTARU (PHASE 1) |
Private |
GC01 |
G.Ottaru, Male' |
|
|
1-Feb-20 |
18 Months |
- |
126 |
FEDO PRIVATE LIMITED
|
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT G.RANGIREEGE,MALE' |
Private |
GC01 |
G.Rangireege |
|
|
13-May-19 |
22 Months |
- |
127 |
FEDO PRIVATE LIMITED
|
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING WITH TERRACE AT MA.ZEPLIN |
Private |
GC01 |
Ma.Zeplin |
|
|
15-Sep-19 |
26 Months |
- |
128 |
MARUKAB PRIVATE LIMITED |
H.Rihi,Ameer ahmed Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING WITH TARRACE AT H.MAAVADIGE |
Private |
GC01 |
H.Maavadige |
|
|
1-Oct-18 |
3 Years |
- |
129 |
BORN TO BUILD PRIVATE LIMITED |
M.Viludholhi, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION OF 13 STOREY BUILDING AT M.FINIFARU |
Private |
GC01 |
M.Finifaru |
|
|
1-Jan-19 |
36 Months |
- |
130 |
MAALAA HIGH RISING CONSTRUCTION PVT LTD |
G.Miles,Koimalaa Hingun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING WITH BASEMENT AT H.RIHIDHOOLAGE |
Private |
GC01 |
H.Rihidhoolage |
|
|
22-Jun-18 |
30 Months |
- |
131 |
MAZIYA SERVICES PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
CONSTRUCTION OF 09 STOREY BUILDING AND TARRACE AT G.NOORANGE |
Private |
GC01 |
G.Noorange |
|
|
1-Jan-20 |
20 Months |
- |
132 |
TLT CONSTRUCTION PRIVATE LIMITED |
M.Beach Flat, Sabudheli Magu, Male' |
Local |
CONSTRUCTION OF SEVEN STOREY BUILDING AT M.AHLAM VILLA |
Private |
GC01 |
M.Ahlam Villa |
|
|
15-Mar-20 |
24 months |
- |
133 |
Aima Construction Company Pvt Ltd |
H.Woodland Aage, Kaani Goalhi,Male' |
Local |
CONCRETE WORKS OF 4TH FLOOR OF 10 STOREY BUILDING AT M.AARO |
Private |
GC01 |
Ma.Felina |
|
|
1-Feb-20 |
467 Days |
- |
134 |
JIAZ-MALDIVES PRIVATE LIMITED |
M.Dhahaaab, Nikagas Magu, Male' |
Local |
CONSTRUCTION OF 08 FLOOR BUILDING WITH TARRACE AT MA.HATHUVAA |
Private |
GC01 |
Ma. Hathuvaa |
|
|
1-Nov-19 |
24 Months |
- |
135 |
STATIC COMPANY PRIVATE LIMITED |
M.Huraa Fareedheemagu, Male |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY AND SEWERAGE FACILITIES IN SH.MAROSHI,MALDIVES |
Private |
GC01 |
Sh.Maroshi |
|
|
12-Jun-19 |
24 Months |
- |
136 |
FEDO PRIVATE LIMITED
|
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT MA.KANDUBALAAGE,MALE' |
Private |
GC01 |
Ma.Kandubalaage |
|
|
1-Sep-20 |
486 Days |
- |
137 |
VANQUISHER CONSTRUCTION COMPANY PVT LTD |
Ma. Maaranga, Dhaburu Magu, Male' |
Local |
FOUNDATION WORKS, CONCRETE AND FINISHING WORKS OF 13 STOREY BUILDING AT M.MARCORNI |
Private |
GC01 |
M.Marconi |
|
|
5-Apr-18 |
36 Months |
- |
138 |
TAG CONSTRUCTION & SUPPLY PRIVATE LIMITED |
Block 6, Hulhumale Ferry Terminal, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION WORKS OF 4TH AND 5TH FLOOR AT G.VELAGALAA |
Private |
GC01 |
G.Velagala |
|
|
1-Jul-20 |
183 Days |
- |
139 |
ALITHO INVESTMENT MALDIVES PRIVATE LIMITED |
M.Love Nest, Kanba Aisa Rani Hingun,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT MA.ALIFU |
Private |
GC01 |
Ma.Alifu |
|
|
13-Jun-20 |
24 Months |
- |
140 |
PEARL WORKS PRIVATE LIMITED |
Ma.Raiy Endheri, Badifasgandu Magu, Male' |
Local |
CONSTRUCTION AND FINISHING WORKS OF 3 STOREY BUILDING AT RIVELI, TH.MADIFUSHI |
Private |
GC01 |
Riveli , Th.Madifushi |
|
|
31-Oct-20 |
3 Years |
- |
141 |
VANQUISHER CONSTRUCTION COMPANY PVT LTD |
Ma. Maaranga, Dhaburu Magu, Male' |
Local |
CONSTRUCTION OF 6 STOREY BUILDING AT HULHUMALE' PHASE 2 , LOT 20056 |
Private |
GC01 |
Hulhumale , Phase 2, Lot: 20056 |
|
|
21-Jul-20 |
13 Months |
- |
142 |
SAS E CONSTRUCTION PRIVATE LIMITED |
1st Floor,M.Ebage, Irumaa Magu,Male' |
Local |
DESIGN AND BUILD BASIS FOR CONSTRUCTION OF WATER SUPPLY AND SEWERAGE FACILITIES IN HA.FILLADHOO, HD.FINEY AND HD.NAIVAIDHOO (PACKAGE 1 ) |
Government |
UC01 &03 |
Ha.Filladhoo, Hd.Finey and Hdh,Naivaadhoo |
|
|
20-Oct-19 |
752 Days |
- |
143 |
DEPICT PRIVATE LIMITED |
H.Woodland Aage, Kaani Goalhi,Male' |
Local |
CONCRETE WORKS OF 5TH AND 6TH FLOOR OF 10 STOREY BUILDING AT H.PAAYAL |
Private |
GC01 |
H.Paayal |
|
|
15-Sep-20 |
90 Days |
- |
144 |
MAALAA HIGH RISING CONSTRUCTION PVT LTD |
G.Miles,Koimalaa Hingun, Male' |
Local |
CONSTRUCTION WORKS OF 10 STOREY BUILDING AT MALE HIGHER SECONDRY SCHOOL (TOWER 2) |
Private |
GC01 |
Male Higher Secondry School, Male' |
|
|
1-Jan-20 |
15 Months |
1 Year |
145 |
NALAHIYA CONSTRUCTION AND DEVELOPMENT PRIVATE LIMITED |
M.Nalahiya, Fareedhee Magu, Male' |
Local |
CONCERETE WORKS OF 10 STOREY BUILDING AT G.MAAGAHAA |
Private |
GC01 |
G.Maagaha |
|
|
25-May-19 |
2 years |
- |
146 |
TAG CONSTRUCTION & SUPPLY PRIVATE LIMITED |
Block 6, Hulhumale Ferry Terminal, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION OF CONCRETE WORKS AT 10TH FLOOR & LIFT ROOM WORKS OF 10 STOREY BUILDING AY MA. NOOMAS |
Private |
GC01 |
Ma. Noomas, Male' |
|
|
1-Jul-20 |
06 Months |
- |
147 |
SHIRMEENA CONSTRUCTION PRIVATE LIMITED |
G. Zamaaneege, Alikaleygefaanu Magu, Male' |
Local |
FOUNDATION AND CONCERETE WORKS OF 7 STOREY BUILDING AT MA.FUNAMAAGE |
Private |
GC01 |
Ma.Funamaage |
|
|
8-Nov-19 |
419 Days |
- |
148 |
MAALAA HIGH RISING CONSTRUCTION PVT LTD |
G.Miles,Koimalaa Hingun, Male' |
Local |
CONSTRUCTION OF 15 STOREY BUILDING AT M.BEYDHANAAGE |
Private |
GC01 |
M.Beydhanaa |
|
|
25-Sep-19 |
24 Months |
- |
149 |
PEARL TRAVEL SERVICE PRIVATE LIMITED |
admin@peartravelservice.com |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT M.MADITHILA |
Private |
GC01 |
M.Madithila |
|
|
1-Oct-20 |
2 Years |
- |
150 |
VANQUISHER CONSTRUCTION COMPANY PVT LTD |
Ma. Maaranga, Dhaburu Magu, Male' |
Local |
FOUNDATION AND CONCRETE WORKS OF 6 FLOOR BUILDING AT HULHUMALE' LOT 10992 |
Private |
GC01 |
Hulhumale' Lot 10992 |
|
|
15-Mar-20 |
09 Months |
- |
151 |
VAALY CONSTRUCTION PRIVATE LIMITE |
5th Floor, Vaaly Villa, Majeedheemagu |
Local |
CONCRETE WORKS OF 3 FLOORS (3RD, 4TH AND 5TH) AT H.JOINTER |
Private |
GC01 |
H.Jointer, Male' |
|
|
1-Sep-20 |
04 months |
- |
152 |
CHINA STATE CONSTRUCTION MALDIVES PRIVATE LIMITED |
6th Floor, H.Aage, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION OF 11 STOREY COMMERCIAL OFFICE BUILDING FOR OOREDOO MALDIVES PLC |
Private |
GC01 |
Ooredoo Maldives Plc |
|
|
10-Sep-20 |
600 Days |
- |
153 |
PEARL MILLET CONSTRUCTION PRIVATE LIMITED |
2nd Floor, H.Kandoomaage, Apt 2, Mushtharee Magu, Male' |
Local |
CONCRETE AND FINISHING WORKS AT 4TH TO 7TH FLOORS OF 8 STOREY BUILDING AT H.KAN'DOOMAAGE |
Private |
GC01 |
H.Kan'doomaage, Male' |
|
|
15-Aug-20 |
504 Days |
- |
154 |
PEARL MILLET CONSTRUCTION PRIVATE LIMITED |
2nd Floor, H.Kandoomaage, Apt 2, Mushtharee Magu, Male' |
Local |
CONCRETE WORKS OF 5TH FLOOR SLAB AND CONCERET, MASONARY WORKS OF 6TH TO 9TH FLOOR & TARRACE AND PLASTERING WORKS OF 10 FLOOR BUILDING AT M.BEACH ROADGE |
Private |
GC01 |
M.Beach Roadge, Male' |
|
|
1-Sep-20 |
175 Days |
- |
155 |
RENOCON PRIVATE LIMITED |
Ma. Kufraa, Kameenee Magu, Male' |
Local |
CONSTRUCTION WORKS OF FIRST 4 FLOORS oF 6 STOREY BUILDING AT HULHUMALE LOT 11330 |
Private |
GC01 |
Hulhumale' Lot 11330 |
|
|
10-Sep-20 |
3 Years |
- |
156 |
RENOCON PRIVATE LIMITED |
Ma. Kufraa, Kameenee Magu, Male' |
Local |
CONSTRUCTION WORKS OF 04 STOREY OF 10 STOREY & TERRACE BUILDING AT MA.ROCKS DALE |
Private |
GC01 |
Ma.Rocks Dale, Male' |
|
|
10-Sep-20 |
11 Months |
- |
157 |
3DA CONSTRUCTION PRIVATE LIMITED |
Ma.Rabeeuge, Javaahiru Magu, Male' |
Local |
CONSTRUCTION OF 9TH AND 10TH FLOOR SLAB WORKS OF 10TH STOREY BUILDING AT H.ACROPOLICE |
Private |
GC01 |
H.Acropolice, Male' |
|
|
1-Sep-20 |
5 Months |
- |
158 |
FENMULI CONSTRUCTIONS PRIVATE LIMITED |
H.Shark, Mustharee Magu, Male' |
Local |
CONSTRUCTON OF 10 STOREY BUILDING AT G.FINIHIYA VIEW |
Private |
GC01 |
G.Finihiya View, Male' |
|
|
1-Feb-20 |
16 Months |
- |
159 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION WORKS , CONSTRUCTION OF 1ST 2 FLOORS OF 10 STOREY BUILDING AT MA.MILAKOARAAGE |
Private |
GC01 |
Ma.Milkoaraage |
|
|
1-Aug-20 |
12 Months |
- |
160 |
AGMA MALDIVES PTE LTD |
1st Floor, M.Green Eye, Javaahiru Magu, Male' |
Local |
CONCRETE CASTING WORKS OF 2ND FLOOR OF 10 STOREY BUILDING WITH TERRACE AT M.SILVER BEACH |
Private |
GC01 |
M.Silver Beach, Male' |
|
|
15-Sep-20 |
1 Months |
- |
161 |
NEW CONSTRUCTION PTE LTD |
Ma. Maafolheyge, Nikagas Magu, Male' |
Local |
FOUNDATION WORKS AND CONSTRUCTION OF FIRST TWO FLOORS OF 07 STOREY (WITH TERRACE) BUILDING AT MA.CHANBEYLEE AAGE |
Private |
GC01 |
Ma. Chambeylee Aage, Male' |
|
|
1-Feb-20 |
18 Months |
- |
162 |
B BUILDERS PRIVATE LIMITED |
2nd Floor, H.Hani Dhoadhi, Boduthakurufaanu Magu, Male' |
Local |
CONCERETE WORKS OF 6-9 FLOOR OF 10 STOREY BUILDING AT M.BEACH ROADGE (Sub-contract work from Pearl Millet Construction Private Limited (C-0110/2013)) |
Private |
GC01 |
M.Beach Roadge, Male' |
|
|
10-Sep-20 |
04 Months |
- |
163 |
MULTI SKILL COMPANY PVT LTD |
G.Finivilu, Dhomaidharaadha Higun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDNG AT G.ALLPARISE |
Private |
GC01 |
G.All Paris |
|
|
3-Apr-19 |
36 Months |
- |
164 |
INNF CONSTRUCTION COMPANY PVT LTD |
G.Finivilu, Dhomaidharaadha Higun, Male' |
Local |
FOUNDATION WORKS 10 STOREY BUILDING AND CONSTRUCTION OF FIRST 3 FLOORS AT MA.THARAADHU |
Private |
GC01 |
Ma. Tharaadhu |
|
|
19-Sep-20 |
9 months |
- |
165 |
NELKE' COMPANY PVT LTD |
H.Roasan View, Vaijehey Maage, Male' |
Local |
FOUNDATION WORKS OF 10 STOREY BUILDING AND CONCRETE WORKS OF FIRST 4 FLOORS AND FINISHING WORKS OF 2ND AND 3RD FLOOR AT H.VINOLIYA |
Private |
GC01 |
H.Vinoliya, Male' |
|
|
20-Aug-20 |
27 Months |
08 Months |
166 |
AMIN CONSTRUCTION PRIVATE LIMITED |
2nd Floor,M.World Dream, Handhuvaree Hingun, Male' |
Local |
DEVELOPMENT OF AMINGIRI RESORT - PHASE 2 |
Private |
GC01 |
K.Kohdhipparu |
|
|
4-Sep-19 |
2 Years |
- |
167 |
VIEW CONSTRUCTION PRIVATE LIMITED |
G.New Sharaaz, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION WORKS OF 10 STOREY BUILDING AND CONSTRUCTION OF FIRST THREE FLOORS AT MA.DANITY |
Private |
GC01 |
Ma.Danity, Male' |
|
|
1-Aug-17 |
1248 Days |
- |
168 |
K.I.M GROUP PRIVATE LIMITED |
M.Fathaha,Fandiyaaru Magu,Male |
Local |
CONCERETE WORKS OF 5TH TO 08TH FLOOR OF 8 STOREY BUILDING AT MA.KHATHUVAA (Sub-contract work from Jiaz-Maldives Private Limited (C-22/2005)) |
Private |
GC01 |
Ma. Hathuvaa |
|
|
9-Sep-20 |
153 Days |
- |
169 |
ALAAF PRIVATE LIMITED |
7B, Ma.Dhilkushaage, Dhilkushaa Goalhi, Male' |
Local |
ROOF SLAB WORKS OF 11 FLOOR BUILDING AT H.CARRIBIAN |
Private |
GC01 |
H.Carribian, Male' |
|
|
15-Sep-20 |
45 Days |
12 months |
170 |
DONBE'Z PRIVATE LIMITED |
H.Sheeraz, Mustharee Magu, Male' |
Local |
CONCRETE WORKS OF TARRACE FLOOR OF 10 STOREY BUILDING AT H.SHEERAZ |
Private |
GC01 |
H.Sheeraz, Male' |
|
|
25-Aug-20 |
02 Month |
- |
171 |
LITUS CONSTRUCTION PRIVATE LIMITED |
3rd Floor M. Faaroshige, Orchid Magu, Male' |
Local |
CONSTRCUTION OF 4TH AND 5TH FLOOR OF 7 STOREY BUILDING AT H.AM HOUSE |
Private |
GC01 |
H.A.M. House , Male' |
|
|
15-Sep-20 |
46 Days |
- |
172 |
BUILT SPACES PRIVATE LIMITED |
M.Pole Star, Jambu Magu |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT MA.LIVAAZAA HOUSE |
Private |
GC01 |
Ma. Liwaza House |
|
|
10-Oct-20 |
18 Months |
6 Months |
173 |
E.W. CONSTRUCTION PRIVAET LIMITED |
M.Aasmaa Villa, Dhakadha Magu, Male' |
Local |
FOUNDATION WORKS OF 10 STOREY BUILDING, CONCRETE WORKS OF FIRST 3 FLOORS AND FINISHING WORKS OF 2ND FLOOR AT M.ISVAARU |
Private |
GC01 |
M. Isvaaru |
|
|
15-Jan-20 |
365 Days |
- |
174 |
MAZIYA SERVICES PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
CONSTRUCTION OF 2ND AND 3RD FLOOR OF 10 STOREY BUILIDNG AT M.BANANA LEAF |
Private |
GC01 |
M.Banana Leaf, Male' |
|
|
1-Sep-20 |
7 Months |
- |
175 |
VANQUISHER CONSTRUCTION COMPANY PVT LTD |
Ma. Maaranga, Dhaburu Magu, Male' |
Local |
CONSTRUCTION OF FOUNDATION & STRUCTURAL WORKS OF 6 STOREY BUILDING AT HULHUMALE LOT 11053 |
Private |
GC01 |
Hulhumale Lot: 11053 |
|
|
20-Jun-19 |
29 Months |
- |
176 |
CHINA MACHINERY ENGINEERING CORPORATION |
8th Floor,H.Suez,Ameer Ahmed Magu,Male' |
Local |
CONSTRUCTION OF 1530 HOUSING UNIT PROJECT PHASE III AT HULHUMALE' |
Private |
GC01 |
Hulhumale Phase II |
|
|
15-Mar-18 |
1460 Days |
- |
177 |
TWO A COMPANY PVT LTD |
2nd Floor, H.Alcove, Roashanee Magu, Male' |
Local |
CONSTRCUTION OF 6TH TO 10TH FLOOR (WITH TERRACE) OF 10 STOREY BUILDING AT H.AAGARAA HOSUE |
Private |
GC01 |
H.Aagaraa House |
|
|
27-Aug-20 |
20 Months |
- |
178 |
DOMUS PVT LTD |
M. Rosyside, Janbumagu, Male' |
Local |
FOUNDATION WORKS, CONCRETE AND EXTERNAL WALLS WORKS OF 5 STOREY BUILIDNG WITH TERRACE AT M.FRESCO |
Private |
GC01 |
M. Fresco, Male' |
|
|
3-Oct-20 |
8 Months |
- |
179 |
AWASMAGU CONSTRUCTION PRIVATE LIMITED |
M.Alakaa, Handhuvaree Hingun, Male' |
Local |
CONCRETE AND FINISHING WORKS OF 4TH AND ABOVE FLOORS UP TO TERRACE FLOOR OF 12 STOREY BUILDING AT MA.SHAHEEN |
Private |
GC01 |
Ma.Shaaheen |
|
|
17-Oct-20 |
24 months |
- |
180 |
AWASMAGU CONSTRUCTION PRIVATE LIMITED |
M.Alakaa, Handhuvaree Hingun, Male' |
Local |
CONCRETE WORKS OF FLOORS 2 TO 10 AND TARRACE AT 10 FLOOR BUILDING AT G.RIDHAA |
Private |
GC01 |
G.Ridhaa |
|
|
25-Oct-20 |
11 months |
|
181 |
NUGA CONSTRUCTION COMPANY PRIVATE LIMITED |
Dharuma, Havitha Magu, Hoadhandu, Fuvahmulah City |
Local |
CONCRETE AND FINISHING WORKS OF GROUND FLOOR AND FIRST FLOOR AT MA.ANBARAA |
Private |
GC02 |
Ma.Anbara |
|
|
18-Oct-20 |
4 Months |
- |
182 |
FENMULI CONSTRUCTIONS PRIVATE LIMITED |
H.Shark, Mustharee Magu, Male' |
Local |
STRUCTURE WORKS OF 2ND AND ABOVE SHEETS UP TO 9TH FLOOR WITH TERRACE OF 12 STOREY BUILDING AT MA.MAAVELAAVARU |
Private |
GC01 |
Ma.Maavelaavaru |
|
|
7-Apr-20 |
12 Months |
- |
183 |
MAZIYA SERVICES PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
CONSTRUCTION OF 7TH AND 8TH FLOORS AT M.BANANA LEAF |
Private |
GC01 |
M.Banana Leaf, Male' |
|
|
1-Sep-20 |
7 Months |
|
184 |
DEPICT PRIVATE LIMITED |
H.Woodland Aage, Kaani Goalhi,Male' |
Local |
CONCRETE WORKS OF 06 STOREY BUILDING AT MA.ZELEETHAN,MALE' |
Private |
GC01 |
Ma.Zeleethan |
|
|
18-Sep-20 |
12 Months
|
|
185 |
MICRO BUILDERS PVT LTD |
H. Kurumbaa Villa (GA), Seasan Magu, Male' |
Local |
CONCRETE AND EXTERNAL WALLS MASONARY WORKS OF 9 FLOORS (FLOORS ABOVE 1ST FLOOR) OF 10 STORY BUILDING AT M.HUDHU ASURUMAAGE |
Private |
GC01 |
M. Hudhuasurumaage, Male' |
|
|
11-Jul-20 |
12 Months |
|
186 |
VANQUISHER CONSTRUCTION COMPANY PVT LTD |
Ma. Maaranga, Dhaburu Magu, Male' |
Local |
STRUCTURAL AND FINISHING WORK OF 4TH FLOOR TO 9TH FLOOR AND TERRACE OF 10 STORY BUILDING AT H.ALANAASIMAAGEAAGE |
Private |
GC01 |
H. Alanaasimaage Aage |
|
|
14-Oct-20 |
15 Months |
|
187 |
ANGELIQUE INTERNTIONAL |
7th Floor, M.Sendrose, Koarukendi Magu, Male' |
Foreign |
PROVISION OF WATER SUPPLY FACILITIES IN DH.KUDAHUVADHOO,TH.GURAIDHOO, AND GA.VILLINGILI |
Government |
GC01, UC01-3 |
DH.KUDAHUVADHOO, TH.GURAIDHOO AND GA.VILLIGILLI, MALDIVES |
|
|
4-May-17 |
1277 Days |
|
188 |
FENMULI CONSTRUCTIONS PRIVATE LIMITED |
H.Shark, Mustharee Magu, Male' |
Local |
CONSTRUCTION OF 3RD, 4TH & 5TH FLOOR OF 5 STOREY BUILDING AT H.SAMAN VILLA |
Private |
GC01 |
H.Saman Villa 4 |
|
|
15-Nov-20 |
24 Months |
|
189 |
MAALAA HIGH RISING CONSTRUCTION PVT LTD |
G.Miles,Koimalaa Hingun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H.SEA SPEED |
Private |
GC01 |
H.Sea Speed |
|
|
30-Aug-20 |
20 Months |
|
190 |
MULTI SKILL COMPANY PVT LTD |
G.Finivilu, Dhomaidharaadha Higun, Male' |
Local |
CONSTRUCTION OF 5 STOREY BUILDING AT M.MOONBEENS |
Private |
GC01 |
M.Moon Beams |
|
|
5-Jan-20 |
20 Months |
|
191 |
MULTI SKILL COMPANY PVT LTD |
G.Finivilu, Dhomaidharaadha Higun, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING WITH TERRACE AT H.HAMEEDHEE MANZIL |
Private |
GC01 |
H.Hameedhe Manzil |
|
|
1-Aug-20 |
2 Years |
|
192 |
SUNWORLD HOLIDAY PVT LTD |
H, Vifilaage. Janavaree Magu, Male' |
Local |
FOUNDATION WORK OF 8 STOREY BUILDING AND CONCRETE WORKS OF FIRST TWO FLOORS AT G.RAVI |
Private |
GC01 |
G.Ravi |
|
|
1-Oct-20 |
5 Months |
|
193 |
VIEW CONSTRUCTION PRIVATE LIMITED |
G.New Sharaaz, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION OF 13 STOREY BUILDING AT MA.RAAGUNDAAGE |
Private |
GC01 |
Ma.Raagundaage |
|
|
1-Jul-19 |
884 Days |
|
194 |
INNF CONSTRUCTION COMPANY PVT LTD |
G.Finivilu, Dhomaidharaadha Higun, Male' |
Local |
CONSTRUCTION OF 5-10 FLOORS WITH TERRACE AND LIFT MACHINE ROOM OF 10 STOREY BUILDING AT G.BODUGAA VILAA |
Private |
GC01 |
G.Bodugaa Villa |
|
|
1-Sep-20 |
367 Days |
|
195 |
DEPICT PRIVATE LIMITED |
H.Woodland Aage, Kaani Goalhi,Male' |
Local |
CONCRETE WORKS OF 06 STOREY BUILDING AT MA.ZELEETHAN,MALE' |
Private |
GC01 |
Ma.Zeleethan |
|
|
18-Sep-20 |
12 Months |
|
196 |
ATOLL ARCH PRIVATE LIMITED |
2nd Floor, H.Melaim, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION AND CONCRETE WORKS OF GROUND, FIRST FLOOR AND SECOND FLOOR OF 09 FLOOR BUILDING AT H.KULHITHULHAAGE |
Private |
GC01 |
H.Kulhithulhaage |
|
|
15-Jan-20 |
360 Days |
|
197 |
STANDARD & ORIGIN PRIVATE LIMITED |
5th Floor,H.Sifa, Boduthakurufaanu Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING WITH TERRACE AT MA.NIMERI |
Private |
GC01 |
Ma.Nimeri |
|
|
1-Sep-20 |
2 Years |
|
198 |
M.T HOJGAARD PRIVATE LIMITED |
5th Floor, H.filigasdhoshuge Building, Ameeru Ahmed Magu, Male' |
Local |
SURVEY, DESIGN AND HARBOUR RECONSTRUCTION OF 3 ISLANDS (B.KUDARIKILU, B.DHONFANU & B.KIHAADHOO) |
Government |
GC01 ,HC,UC |
B.Kudarikilu, B.Dhonfanu, B.Kihaadhoo |
|
|
10-Sep-22 |
365 Days |
|
199 |
WOA MALDIVES PRIVATE LIMITED |
H.Meri Side 4, Boduthakuru Faanu Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H.MAAFAAGAA |
Private |
GC01 |
H.Maafaagaa |
|
|
6-Aug-20 |
370 Days |
|
200 |
AGMA MALDIVES PTE LTD |
1st Floor, M.Green Eye, Javaahiru Magu, Male' |
Local |
CONCRETE CASTING WORKS OF 9TH FLOOR OF H.SANDHALEEGE |
Private |
GC01 |
H.Sandhaleege |
|
|
20-Oct-20 |
30Days |
|
201 |
AFAMI MALDIVES PVT LTD |
M.Lily Pool, 2nd Floor |
Local |
CONSTRUCTION OF NEW OFFICE BLOCK AT GA GEMANAFUSHI |
Private |
GC01 |
GA Gemanafushi |
|
|
2-Mar-20 |
271 Days |
|
202 |
ALITHO INVESTMENT MALDIVES PRIVATE LIMITED |
M.Love Nest, Kanba Aisa Rani Hingun,Male' |
Local |
CONCRETE AND FINISHING WORKS OF 10 STOREY BUILDING AT H.NEW SORE SHINE |
Private |
GC01 |
H.New SoreShine, Male' |
|
|
10-Apr-19 |
24 Months |
|
203 |
K.I.M GROUP PRIVATE LIMITED |
M.Fathaha,Fandiyaaru Magu,Male |
Local |
CONSTRUCTION OF SEVEN STORY BUILDING AT MA. MONTROVIA |
Private |
GC01 |
Ma. Montrovia |
|
|
10-Jan-20 |
508 Days |
|
204 |
DHIVEHI COMPANY PRIVATE LIMITED |
H. Haali, 2nd Floor, Majeedhee Magu, Male' |
Local |
CONSTRUCTION AND FINISHING WORKS OF 7 FLOORS INCLUDING FOUNDATION AT H. FEERUMURANGAMAA |
Private |
GC01 |
H. Feerumurangamaa |
|
|
1-Jan-20 |
15 Months |
|
205 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
local |
CONCRETE AND FINISHING WORKS FROM 4TH FOOR TO 10TH FLOOR OF 10 STORY BUILDING AT H. FAIYKURI |
Private |
GC01 |
H. Faiykuri |
|
|
24-Apr-19 |
1155 Days |
|
206 |
ABC CONSTRUCTION PVT LTD |
1st Floor,G.Niooranfini, Kalhuhura Magu,Male' |
local |
CONCRETE WORKS OF FOUNDATION, GROUND FLOOR AND 1ST FLOOR AT H.KAROAGE AGE. |
Private |
GC01 |
H.Karoage Aage |
|
|
20-Nov-20 |
137 days |
|
207 |
GLOBIN PRIVATE LIMITED |
H. Reethi Maakoani, Sosan Magu, Mlae' |
Local |
CONSTRUCTION WORK OF 10 STORY BUILDING AT H. SOASAN MEAD |
Private |
GC01 |
H. Soasan Mead |
|
|
15-Sep-20 |
2 Years |
|
208 |
JAAH INVESTMENTS PRIVATE LIMITED |
5th Floor, Unit202,H.Davinci, Sosun Magu, Male |
Local |
CONSTRUCTION OF 06 STOREY BUILDING AT H.NIBOOGE |
Private |
GC01 |
H.Nibooge, Male' |
|
|
27-Oct-19 |
24months |
|
209 |
E.W. CONSTRUCTION PRIVAET LIMITED |
M.Aasmaa Villa, Dhakadha Magu, Male' |
Local |
CONSTRUCTION OF 04 STORY BUILDING AT H.SUNNY PARK |
Private |
GC01 |
H.Sunny Park, Male' |
|
|
10-Nov-20 |
140 Days |
20 Days |
210 |
HIKAWI CONSTRUCTION PRIVATE LIMITED |
Ground Floor, Lot 11178, Chabeylee Magu, Goalhi 06, Hulhumale' |
Local |
CONSTRUCTION OF 7 STORY BUILDING AT MA.HINNAVARU |
Private |
GC01 |
Ma.Hinnavaru |
|
|
5-Mar-20 |
12 Months |
|
211 |
CONSYNC PRIVATE LIMITED |
M. Ever Rest, 1st Floor, Javaahiru Magu, Male' |
Local |
CONCRETE AND FINISHING WORKS OF SECOND FLOOR TO NINTH FLOOR (INCLUDING TERRACE FLOOR SLAB) OF 10 FLOOR BUILDING AT AT MA. FINAA |
Private |
GC01 |
Ma. Finaa |
|
|
25-Nov-19 |
456 Days |
6 Months |
212 |
ZAAN CONSTRUCTION COMPANY PVT LTD |
H. Blue Jay, First Floor, Karanka Magu, Male' |
Local |
CONSTRUCTION OF 10 STORY BUILDING AT MA. BEENA |
Private |
GC01, GC02 |
Ma. Beena |
|
|
15-Nov-20 |
18 Months |
12 Months |
213 |
TRACK EARTH PRIVATE LIMITED |
3F,H.Sheereen Villa 01, Burevi Magu, Male' |
Local |
CONCRETE WORKS OF 8TH, 9TH, 10TH FLOOR AND ROOF SLAB AT H. DHENOO |
Private |
GC01 |
H. Dhenoo, Male' |
|
|
11-Oct-20 |
90 Days |
1 Year |
214 |
PROPOSE CONSTRUCTION PRIVATE LIMITED |
Ground Floor, Ma.Double Eight, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 10TH FLOOR SLAB AND CONCRETE WORKS OF TERRACE WITH LIFT OF G.GARNET |
Private |
GC01 |
G.Garnet, Male' |
|
|
10-Nov-20 |
3 Months |
|
215 |
AMANAT |
V.Translvania, Kandoomaa Goalhi, Male' |
Local |
CONCRETE AND FOUNDATION WORKS OF 4 FLOORS AND FINISHING WORKS OF 2ND AND 3RD FLOOR AT M.DHIJULATH KAORU |
Private |
GC01 |
M.Dhijulath Koaru, Male' |
|
|
7-Feb-20 |
18 Months |
12 Months |
216 |
3DA CONSTRUCTION PRIVATE LIMITED |
Ma.Rabeeuge, Javaahiru Magu, Male' |
Local |
CONCRETE WORKS OF 3RD AND 4TH FLOOR AND FINISHING WORKS OF GROUND TO 4TH FLOOR OF 8 STOREY BUILDING AT MA.THOONUVELI |
Private |
GC01 |
MA.Thoonuveli |
|
|
1-Oct-20 |
30 months |
- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
218 |
VANQUISHER CONSTRUCTION COMPANY PVT LTD |
Ma. Maaranga, Dhaburu Magu, Male' |
Local |
CONCRETE WORK OF 03RD FLOOR OF 10 STORY BUILDING AT H.FARUMA |
Private |
GC01 |
H. Faruma |
|
|
21-Sep-20 |
60 days |
|
219 |
SMALL MALDIVES PVT LTD |
H.Nasmee, Bodufungandu Magu , Male' |
Local |
CONSTRUCTION WORK OF 10 STORY BUILDING AT G. NOORANGE |
Private |
GC01, GC02, OB01,OB02,OB03, OB04, OB05, OB06, OB07, OB08 |
G. Noorange |
|
|
5-Sep-19 |
2 Years |
|
220 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONCRETE AND FINISHING WORKS OF 09 STORY BUILDING AT M. AMAZON |
Private |
GC01 & GC02 |
M. Amazon |
|
|
10-Oct-20 |
16 Months |
6 Months |
221 |
COLOUR IMAGE MALDIVES PRIVATE LIMITED |
G.Lamaison, Neeloafaru Magu, Male' |
Local |
CONSTRUCTION AND INTERIOR WORKS OF 5 STOREY BUILDING AT H.DHANBUMAAGE |
Private |
GC01 |
H.Dhanbumaage |
|
|
26-Nov-20 |
90 Days |
- |
222 |
AIMA CONSTRUCTION COMPANY PVT LTD |
G.Aima, Banafsaa Magu, Male' |
Local |
CONSTRUCTION OF 10 STOREY RESIDENTIAL BUILDING AT G. VIOLIN |
Private |
GC01 |
G. Violin |
|
|
1-Dec-20 |
395 Days |
- |
223 |
SENIOR INTERNATIONAL PRIVATE LIMITED |
1st Floor, M.Gallandhoo, Asaree Higun |
Local |
CONSTRUCTION OF A WAREHOUSE AT MA.MAARAADHAAGE,MALE' |
Private |
GC01 |
Ma.Maaraadhage |
|
|
1-Nov-16 |
06 Years |
- |
224 |
L.F CONSTRUCTION PRIVATE LIMITED |
M.Fanari,Keneree Magu, Male' |
Local |
CONSTRUCTION OF 5TH TO 11TH FLOOR OF11 STOREY BUILDING AT M.NINE HOUSE |
Private |
GC01 |
M.Ninehouse |
|
|
29-Oct-20 |
42 Months |
- |
225 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 12 STOREY BUILDING AT G. PYRAMIDS |
Private |
GC01 & GC02 |
G. Pyramids |
|
|
1-Nov-20 |
300 Days |
365 Days |
226 |
FLEXINC CONSTRUCTION PRIVATE LIMITED |
6B. H.Fahaage, Muthee Goalhi |
local |
CONSTRUCTION OF 3RD FLOOR OF 10 FLOOR BUILDING AT H. THANBURUVILLA |
Private |
GC01 |
H. Thanburuvilla |
|
|
4-Aug-20 |
6 Months |
6 Months |
227 |
METALLURGICAL CORPORATION OF CHINA LTD |
Lot 11 444 Hithigas Magu, Hulhumale, Maldives |
Foreign |
CONSTRUCTION OF SANDHURA RESIDENCES LUXURY APARTMENT COMPLEX |
Private |
GC01 |
Hulhumale' Plot S1-1, S1-2, S1-3, S1-4 |
|
|
26-Aug-18 |
1039 Days |
365 Days |
228 |
W & A OVERSEAS PTE.LTD |
7th Floor,H.Fusthulhaamaage,Ameer Ahmed Magu, Male' |
Foreign |
CONSTRUCTION OF SOCIAL HOUSING 14 STOREY RESIDENTAL TOWERS HULHUMALE PHASE II NO:N3-20(D),N3-20(E) AND N3-20(F) |
Private |
GC01 |
Hulhumale',Phase II |
|
|
21-Feb-18 |
44 months |
365 Days |
229 |
RENOCON PRIVATE LIMITED |
Ma. Kufraa, Kameenee Magu, Male' |
Local |
FOUNDATION OF 10 FLOORS AND CONSTRUCTION AND FINISHING WORKS OF GROUND AND FIRST FLOOR AT M. MOISHAA |
Private |
GC01, GC02, OB01,OB02,OB03, OB04, OB05, OB06, OB07, OB08, OT05 |
M. Moishaa |
|
|
30-Nov-20 |
12 Months |
1 Year |
230 |
A MAN MALDIVES PVT LTD |
Ground Floor,M.Noothari, Male' |
Local |
FINISHING WORKS OF EXTENSION BUILDING AT GDH. MADAVELI HEALTH CENTER |
Government |
GC01 |
GDh. Madaveli Health Center |
|
|
1-Dec-20 |
259 Days |
12 Months |
231 |
PRECISION ENGINEERING SERVICES (PRIVATE) LIMITED in JV with FLEXINC PRIVATE LIMITED |
M.Fulhafi,Gulhazaaru Goalhi,Male' |
Local |
COMPLETION OF 100 HOUSING UNITS PROJECTS AT B. THULHAADHOO |
Government |
GC01 |
B. Thulhaadhoo |
|
|
10-Jul-19 |
651 Days |
365 Days |
232 |
I CONSTRUCTION PRIVATE LIMITED |
M.Nalahiya, Buruzu Magu, male' |
Local |
CONCRETE WORKS OF 10 STOREY BUILDING AT M.USA -1 |
Private |
GC01 |
M.Usa-1 |
|
|
1-Nov-20 |
250 Days |
366 Days |
233 |
VELOCITY CONSTRUCTION COMPANY PRIVATE LIMITED |
4th Floor, M.Kurinbee Lodge, Izzudheen Magu, Male' |
Local |
CONCRETE STRUCTURE WORKS OF 5TH FLOOR AND ABOVE FLOORS OF 9 STOREY BUILDING AT H. VAVOI |
Private |
GC01 |
H. Vavoi |
|
|
1-Dec-20 |
365 Days |
- |
234 |
VELOCITY CONSTRUCTION COMPANY PRIVATE LIMITED |
4th Floor, M.Kurinbee Lodge, Izzudheen Magu, Male' |
Local |
CONCRETE STRUCTURE WORKS OF 7TH FLOOR AND ABOVE FLOORS OF 10 STOREY BUILDING AT M. MILLET |
Private |
GC01 |
M. Milet |
|
|
1-Dec-20 |
365 Days |
- |
234 |
VENZA COMPANY PRIVATE LIMITED |
1st Floor,10073 Hulhumale lot, Nirolhu Magu, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H. RASMAADHOOGE |
Private |
GC01 |
H. Rasmaadhooge |
|
|
1-Nov-20 |
520 Days |
6 Months |
235 |
ALITHO CONSTRUCTION PRIVATE LIMITED |
H.New Sore Shine |
Local |
CONSTRUCTION OF 10 STOREY BUILDING WITH TERRACE FLOOR AT M.POOL COPEEGE MALE' |
Private |
GC01 |
M.Pool Copeege |
|
|
12-Dec-20 |
24 Months |
6 Months |
236 |
COASTLINE INVESTMENTS PTE LTD |
M. Irufuheyge, Maaveyo Magu, Male' |
Foreign |
CONSTRUCTION OF 10 STOREY BUILDING AT H.THULUSDHOOGE |
Private |
GC01 |
B. Maamaduvari |
|
|
1-Jan-19 |
603 Days |
- |
237 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 08 STOREY MIXED RESIDENTIAL BUILDING (PHASE 01) AT M. RANA PLAZA |
Private |
GC01 |
M. Rana Plaza |
|
|
1-Feb-21 |
365 Days |
364 Days |
238 |
ATOLL ARCH PRIVATE LIMITED |
2nd Floor, H.Melaim, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION WORKS OF 10 STOREY BUILDING WITH CONCRETE WORKS OF 7 FLOORS AND FINISHING WORKS OF 6 FLOORS AT G. JELEENA |
Private |
GC01 |
G. Jeleena |
|
|
21-Nov-20 |
375 Days |
6 Months |
239 |
OLLA PRIVATE LIMITED |
Ma.Snowlight, Rahdhebai Magu, Male' |
Local |
CONSTRUCTION OF 07 STOREY BUILDING AT G.LIGHT GREEN |
Private |
GC01 |
G. Light Green |
|
|
1-Apr-16 |
1826 Days |
- |
238 |
INFINITY BUILDERS |
H.Happy Villa, Violet Magu, Male' |
Local |
CONSTRUCTION OF 12 STOREY BUILDING AT M.PISTHAAGE |
Private |
GC01, GC02 |
M.Pisthaage |
|
|
25-Nov-20 |
12 Months |
12 months |
239 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H. FONIFONIMAAGE - PHASE 3 |
Private |
GC01 |
H. Fonifonimaage |
|
|
20-Dec-20 |
12 Months |
- |
240 |
NALAHIYA CONSTRUCTION AND DEVELOPMENT PRIVATE LIMITED |
M.Nalahiya, Fareedhee Magu, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT M.SANGUFAREEDHUGE |
Private |
GC01 |
M.Sangufareedhuge |
|
|
30-Aug-20 |
36 Months |
12 Months |
241 |
GK DEVELOPMENTS PRIVATE LIMITED |
No.42 North Phase Industrial Estate, Ekkattuthangal, Chennai -006032 |
Foreign |
DESIGN AND BUILT OF TH.THIMARAFUSHI MAJOR ROADS |
Government |
GC01&02, HC01,02,03 UC 01 |
Th.Thimarafushi |
|
|
12-Feb-20 |
290 Days |
290 Days |
242 |
ATOLL ARCH PRIVATE LIMITED |
2nd Floor, H.Melaim, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION AND CONCRETE WORKS OF GROUND, FIRST FLOOR AND SECOND FLOOR OF 09 FLOOR BUILDING AT H.KULHITHULHAAGE |
Private |
GC01 |
H.Kulhithulhaage |
|
|
15-Jan-20 |
360 Days |
|
243 |
VIEW CONSTRUCTION PRIVATE LIMITED |
G.New Sharaaz, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION OF 13 STOREY BUILDING AT MA.RAAGUNDAAGE |
Private |
GC01 |
Ma.Raagundaage |
|
|
1-Jul-19 |
884 Days |
|
244 |
LAMINA PRIVATE LIMITED |
M.Wooden Park |
Local |
CONSTRUCTION OF 12 SOREY BUILDING AT M.WOODEN PARK |
Private |
GC01 |
M.Wooden Park |
|
|
20-Dec-20 |
24 Months |
1 year |
245 |
SEVEN WEEKS PVT LTD |
Ma.Chilhiya Villa, Ameenee Magu, Male' |
Local |
CONCRETE WORKS OF 2/3 TERRACE SLAB OF 10 STOREY BUILDING AT G.MAKHMAAGE |
Private |
GC01 |
G. Makhmaage |
|
|
28-Dec-20 |
10 Days |
- |
246 |
KANBALIFARU DEVELOPMENT PVT LTD |
M.Fehigiri ,1st Floor,Handhuvaree Higun, Male' |
local |
DEVELOPMENT OF TOURIST RESORT AT SH.KANBALIFARU |
Resort |
GC01 |
Sh. Kanbalifaru |
|
|
6-Nov-14 |
06 Years, 13 Months, 20 Days |
- |
247 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
local |
CONSTRUCTION OF 07 STOREY BUILDINIG AT HULHUMALE LOT 11100 |
Private |
GC01 &GC02 |
Hulhumale Lot 11100 |
|
|
9-Apr-19 |
1034 Days |
365 Days |
248 |
SANDAL MAURITIUS PVT LTD |
M.Roslin, Jambu Magu |
local |
DEVELOPMENT OF 150 HOUSING UNITS , ASSOCIATED COMMERCIAL AREAS AND 15 LUXURY VILLAS IN MALDIVES - PHASE II |
Government |
GCO1 |
D1-1 Reethigas Magu, Hulhumale Phase I |
|
|
7-Jan-21 |
27 Months |
6 Months |
249 |
LANDMARK DEVELOPMENT PRIVATE LIMITED |
Lot11269, Hulhumale' Boakarumaa Hingun |
local |
CONSTRUCTION OF 06 STOREY BUILDING AT HULHUMALE LOT 11192 |
Private |
GCO1 |
Hulhumale' LOT 11192 |
|
|
1-Nov-17 |
60 Months |
180 Days |
250 |
ROAD DEVELOPMENT CORPORATION LIMITED |
1st Floor,MNSL Building,Orchid Magu,Male' |
Local |
LANDSCAPE DEVELOPMENT FOR THE SOCIAL HOUSING UNITS SITE AT S. HITHADHOO |
Government |
GC01 & GC02 |
S. Hithadhoo |
|
|
11-Mar-20 |
330 Days |
365 Days |
251 |
SHIRMEENA CONSTRUCTION PRIVATE LIMITED |
G. Zamaaneege, Alikaleygefaanu Magu, Male' |
Local |
CONCRETE WORKS OF 6TH,7TH AND 8TH FLOOR OF 08 FLOOR BUILDING AT G.RANGIREEGE 2 |
Private |
GC01 |
G.Rangirige 2 |
|
|
26-Nov-20 |
6 Months |
6 Months |
252 |
DEL GRAND PRIVATE LIMITED |
Ground Floor,H.Del Rio, Raiyy Villa Higun |
Local |
CONSTRUCTION OF 7 STORY BUILDING WITH TARRACE AT G. UFANVEHI |
Private |
GC01 |
G. Ufanvehi |
|
|
15-Jan-21 |
690 Days |
09 Months |
253 |
IDREES TRADING PRIVATE LIMITED |
H.Asfaru, Kinbigas Magu, Male' |
Local |
FOUNDATION WORKS OF 7 FLOOR BUILDING AND CONSTRUCTION WORKS OF GROUND FLOOR, FIRST FLOOR AND SECOND FLOOR AT H. MEMORY |
Private |
GC01 |
H. Memory |
|
|
1-Jan-21 |
24 Months |
36 Months |
254 |
RISER PRIVATE LIMITED |
H.Melins,Gulisthaanu Goalhi,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING MA.SHAINEE |
Private |
GC01 |
Ma.Shainee |
|
|
14-Dec-20 |
24 Months |
6 months |
255 |
VAALY CONSTRUCTION PRIVATE LIMITED |
5th Floor, Vaaly Villa, Majeedheemagu |
Local |
CONCRETE WORKS OF 6TH,7TH AND 8TH FLOOR OF 08 STOREY BUILDING AT H.JOINTER |
Private |
GC01 |
H.Jointer |
|
|
5-Jan-21 |
4 Months |
6 Months |
256 |
RAINBOW CONSTRUCTION PRIVATE LIMITED |
G.Maraana,Alikileygefaanu magu, Male' |
Local |
CONSTRUCTION OF MINISTRY OF DEFENCE NEW BUILDING |
Government |
GC01 & GC02 |
Bandaarakoshi |
|
|
1-Jan-21 |
618 Days |
- |
257 |
OAK DEVELOPMENT PVT LTD |
G.Goldfin house,halaveli goalhi, Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT G.LACE |
Private |
GC01 |
G.Lace |
|
|
1-Jan-18 |
36 Months |
12 Months |
258 |
BAA INVESTMENT PRIVATE LIMITED |
Ma. Naheedhee Manzil, Badifasgandu Magu, Male' |
Local |
SUPPLY AND INSTALLATION OF 4 TELECOMMUNICATION TOWERS IN HULHUMALE', PHASE II |
Government |
GC01 & GC02 |
Hulhumale', Phase II |
|
|
3-Jan-21 |
80 Days |
12 Months |
259 |
L.F CONSTRUCTION PRIVATE LIMITED |
M.Fanari,Keneree Magu, Male' |
Local |
EXTENSION AND RENNOVATION WORKS OF R. UNGOOFAARU REGIONAL HOSPITAL DENTIAL DEPARTMENT |
Government |
GC01 |
R. Ungoofaaru Regional Hospital Dental Deartment |
|
|
20-Dec-20 |
74 Days |
6 Months |
260 |
NEW CONSTRUCTION PVT LTD |
Ma. Maafolheyge, Nikagas Magu, Male' |
Local |
CONSTRUCTION OF 7 STOREY BUILDING AT MA. CHAMBEYLEE AAGE |
Private |
GC01 |
Ma. Chabeylee Aage |
|
|
1-Mar-20 |
504 Days |
365 Days |
261 |
TLT CONSTRUCTION PRIVATE LIMITED |
M.Beach Flat, Sabudheli Magu, Male' |
Local |
CONCRETE WORKS OF 4 FLOORS 10 STOREY BUILDING AT MA.SENAKA |
Private |
GC01 |
Ma.Senaka |
|
|
3-Jan-21 |
6 Months |
- |
262 |
SUN CONSTRUCTION AND ENGINEERING PVT LTD |
H.Sun Siyam Building,Boduthakurufaanu Magu,Male' |
Local |
CONSTRUCTION OF 102 ROOMS AND OTHER SUPPORT STRUCTURES AT OLHUVELI BEACH AND SPA MALDIVES PHASE 4 (ROMANCE ISLAND) |
Private |
GC01 |
Romance Island, Sun Siyam Olhuveli Maldives (K.Olhuveli) |
|
|
1-Jun-19 |
2 Year 29 days |
12 Months |
263 |
VANQUISHER CONSTRUCTION COMPANY PVT LTD |
Ma.Maaranga,Dhanburu Magu, Male'. |
Local |
CONCRETE AND FINISHING WORKS OF 4TH AND 5TH FLOOR OF 8 STOREY BUILDING AT M. RAALHUVELI |
Private |
GC01 |
M.Raalhuveli |
|
|
9-Dec-20 |
6 months |
- |
264 |
SHANGHAI CONSTRUCTION GROUP CO.,LTD |
No.33, Fushan Road, China (shanghai) Pilot Trade Zone, China |
Local |
CHINA -AID RENOVATION PROJECT OF MALDIVES MINISTRY OF FOREIGN AFFAIRS BUILDING |
Private |
GC01 |
Ministry of Foreign Affairs |
|
|
30-Jun-19 |
565 days |
- |
265 |
PROPOSE CONSTRUCTION PRIVATE LIMITED |
Ground Floor, Ma.Double Eight, Buruzu Magu,Male' |
Local |
FOUNDATION AND CONCRETE WORKS OF THE FIRST 2 FLOORS OF 6 AT HULHUMALE LOT 10351 |
Private |
GC01 |
Hulhumale lot 10351 |
|
|
10-Jan-21 |
105 Days |
30 Days |
266 |
BATCH CONSTRUCTION PRIVATE LIMITED |
1st floor,M.Banasfa villa, Boduthakurufaanu Magu, Male' |
Local |
CONSTRUCTION AND COMPLETION OF 15 STOREY BUILDING AT MA.ALIDHOOGE |
Private |
GC01 |
Ma. Alidhooge, Male' |
|
|
15-Jul-20 |
12 Months |
- |
267 |
I.N.A MALDIVES PVT LTD |
H.Venus, Vaijehey Magu, Male' |
Local |
CONSTRUCTION OF 3 STOREY BUILDING AT SUBSTATION 51 |
Government |
GC01 &GC02 |
Substation 51 (Majeedhee Magu- Sosun Magu Corner) |
|
|
12-Oct-20 |
90 days |
12 Months |
268 |
FEDO PRIVATE LIMITED |
Ma.Khaleefa, Buruzu Magu,Male' |
Local |
CONSTRUCTION OF 11 STOREY BUILDING AT H.SP VILLA- (PHASE 2) |
Private |
GC01 &GC02 |
H.SP Villa |
|
|
7-Jan-21 |
159 Days |
365 Days |
269 |
GSK & CO PRIVATE LIMITED |
H.Sunny Way, Filigas Magu, Male' |
Local |
CONSTRUCTION OF 10 STORY BUILDING AT M. SAAFUVESHI |
Private |
GC01 |
M. Saafuveshi |
|
|
23-Nov-20 |
3 Years |
6 Months |
270 |
FUTUREHOME PRIVATE LIMITED |
M.Raula, Male' |
Local |
CONCRETE AND FINSHING WORKS OF GROUND, FIRST, SECOND AND THIRD FLOOT AT G.MIRZAN |
Private |
GC01 |
G.Mirzan |
|
|
1-Jan-21 |
24 Months |
- |
271 |
SEVEN WEEKS PVT LTD |
Ma.Chilhiya Villa, Ameenee Magu, Male' |
Local |
FOUNDATION WORKS OF 10 STOREY BUILDING, CONCRETE WORKS OF FIRST 3 SLABS AND CONSTRUCTION OF FIRST TWO FLOORS AT M.FIG |
Private |
GC01 |
M.Fig |
|
|
1-Nov-2020 |
7 months |
- |
272 |
MILLION TRADING & CONTRACTING COMPANY PRIVATE LIMITED |
G.Mugoo, Kashimaa Higun, |
Local |
CONSTRUCTION OF 11 STOREY BUILDING AT H.NOORANMAAGE |
Private |
GC01 |
H.Nooranmaage |
|
|
20-Dec-20 |
24 months |
- |
273 |
ALIA CONSTRUCTION PVT LTD |
3th Floor,M. Alia Building, Gandha koalhi Magu, Male'
|
Local |
CONSTRUCTION OF A 6 STORY BUILDING WITH TERRACE AT LOT NO:10053, HULHUMALE" |
Private |
GC01 |
Lot no: 10053 - Hulhumale' |
|
|
14-Jul-19 |
901 days |
365 days |
274 |
ATOLL ARCH PRIVATE LIMITED |
2nd Floor, H.Melaim, Boduthakurufaanu Magu, Male' |
Local |
FOUNDATION, CONCRETE WORKS AND FINISHING WORKS OF 11 STOREY BUILDING AT G.DHUGETHI |
Private |
GC01 |
G.Dhugethi |
|
|
6-Dec-20 |
42 months |
- |
275 |
TLT CONSTRUCTION PRIVATE LIMITED |
M.Beach Flat, Sabudheli Magu, Male' |
Local |
CONCRETE AND FINISHING WORKS OF 1st , 2nd, 3rd, 4th AND TERRACE FLOOR AT M.GULROOMGE |
Private |
GC01 |
M.Gulroomge |
|
|
25-Dec-20 |
12 months |
- |
276 |
MAZIYA SERVICES PRIVATE LIMITED |
M.Parklane, Majeedhee Magu, Male' |
Local |
CONSTRUCTION OF 9TH AND 10TH FLOORS AT M.BANANA LEAF |
Private |
GC01 |
M.Banana Leaf, Male' |
|
|
10-Jan-21 |
7 Months |
|
277 |
ARISCO MALDIVES PVT LTD |
M.Starynight, Sameemeemagu,Male' |
Local |
CONSTRUCTION OF 6 STOREY BUILDING AND TERRACE AT HULHUMALE PLOT 10374 |
Private |
GC01 |
Hulhumale PLot 10374 |
|
|
1-Dec-20 |
360 Days |
- |
278 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
FOUNDATION WORKS, CONSTRUCTION OF GROUND AND FIRST FLOOR AND CONCERETE WORKS OF SECOND FLOOR OF 10 STOREY BULDING AT H.KUDARIKILU AAGE |
Private |
GC01 |
H.Kudarikiluge Aage |
|
|
1-Jan-21 |
8 Months |
12 Months |
279 |
RASHEED CARPENTRY AND CONSTRUCTION PVT LTD |
M.Nectar, Asaree Hingun, Male' |
Local |
CONCRETE WORKS ON 3RD, 4TH AND 5TH FLOOR, FINISHING WORKS ON 3RD FLOOR, CONSTRUCTION OF OUTERWALLS AND CEMENT WORKS ON 4TH AND 5TH FLOOR OF M. SHAMROCK |
Private |
GC01 |
M. Shamrock |
|
|
12-Dec-20 |
5 Months |
- |
280 |
SILVER RAYS PRIVATE LIMITED |
M.Lavrest, Kanbaaaishaa Rani Hingun,Male' |
Local |
CONSTRUCTION OF 10 STOREY BUILDING AT H.FURAMMA |
Private |
GC01 |
H.Furamma |
|
|
17-Jan-21 |
18 Months |
6 Months |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
282 |
AWASMAGU CONSTRUCTION PRIVATE LIMITED |
M.Alakaa, Handhuvaree Hingun, Male' |
Local |
CONCRETE WORKS OF 4TH TO 11TH FLOOR OF 11 STORY BUILDING AT M. LOOVER |
Private |
GC01 |
M. Loover |
|
|
1-Dec-21 |
210 Days |
- |
283 |
|
|
|
|
|
|
|
|
|
|
|
|
284 |
|
|
|
|
|
|
|
|
|
|
|
|
285 |
|
|
|
|
|
|
|
|
|
|
|
|
286 |
|
|
|
|
|
|
|
|
|
|
|
|
287 |
|
|
|
|
|
|
|
|
|
|
|
|
288 |
|
|
|
|
|
|
|
|
|
|
|
|
289 |
|
|
|
|
|
|
|
|
|
|
|
|
290 |
|
|
|
|
|
|
|
|
|
|
|
|